# Stage 1 v5: a less wrong gap, and what breaks first

Stage 1 is a map of the 2035 world economy. It answers no questions and names no solutions. This version re-measures
how far a doubled economy is from where the world is heading, tests that against history, and asks which physical
inputs run short first as growth speeds up.

## The answer in ten lines

1. Doubling world output means going from $224.3T in 2026 to $448.5T in 2035: 8.0% a year. The fastest nine-year stretch since 1970 was 4.3% a year.
2. On course, the IMF's path corrected by its own past errors, the world reaches $290.2T in 2035 (2.9% a year; 80% range $265.9T to $306.3T). That leaves $158.3T missing (range $142.2T to $182.7T).
3. Of the missing output, tier 1 ($30.2T; range $8.4T to $56.8T) is reachable if every country grew like the fastest similar countries have (the ceiling, $318.3T). Tier 2 ($130.3T; range $109.8T to $142.8T) is beyond anything on record.
4. v4 had on course at $265.6T (1.9% a year, slower than every nine-year stretch since 1970) and $182.9T missing ($34.8T tier 1, $148.1T tier 2). v5's on course is $24.6T higher and its tier 2 $17.9T smaller.
5. Backtest: a ceiling built from world records alone was broken in 15 of 31 past starting years (and 10 even at the record), so it was dropped; built country by country, it was never broken at the 90th percentile, and the one used is set to be broken in at most 10% of past cases. The IMF's nine-year paths were too high in all 17 past editions tested, by 0.5 to 1.8 points a year, less when its forecast was lower.
6. Inputs that break first (median case, v4's base way of producing), as the world growth rate at which need first passes the record-pace supply: physical machine labour (robots) 4.3%, cropland 4.4%, capital stock 5.5%, construction trades 6.4%, professional licensing 7.7%, human workforce 7.9%, copper 8.0%.
7. None of them breaks below 4.0% a year (the world's 90th-percentile nine-year growth) in that case. Under other ways of producing or other splits, some do: human workforce from 1.2%, construction trades from 1.5%, cropland from 1.9%, physical machine labour (robots) from 3.4%.
8. Holds under every choice: tier 2 is at least $106.3T in every one of 20,000 runs; physical machine labour (robots), cropland, copper break before the target in at least 41 of 42 runs; electricity, machine cognition (AI agents), AI compute, lithium, rare earths, aluminium do not break before the target in any run; and built structures is a large part of tier 2 under every split rule.
9. 7 of v4's shortages are not inputs and are removed: saving for investment, building permission, grid connection approval, transformers and grid equipment, clinical approval, buyers for built structures, buyers for public services (approvals measured as a sector's own output, copies of electricity's need, an accounting identity, buyers).
10. UNTESTED: the breaking points of physical machine labour (robots), cropland, capital stock, professional licensing, electricity, AI compute rest on assumed ratios or supplies (each has its cheapest test in breaking_points.csv); so do whether the IMF's past optimism will repeat, two elasticity errors, and the look-alike split, which lacks five ICP categories.

## Words used

- **Output**: everything the world produces in a year (world GDP), in 2026 international dollars at purchasing power parity (PPP): prices adjusted so a dollar buys the same amount everywhere.
- **On course**: where output gets to if the world keeps to the path the IMF expects, corrected for how wrong the IMF's past paths turned out.
- **Ceiling**: the most output the world could reach by 2035 if it did as well as it ever has. **Tier 1** is the output between on course and the ceiling; **tier 2** is the output between the ceiling and the target.
- **Percentile**: the 90th percentile of past growth rates is the rate that 90% of past cases were slower than.
- **80% range**: the middle 80% of the 20,000 Monte Carlo runs (each run draws one option for every uncertain choice); the median is the middle run.
- **Layer**: one of 19 parts of the economy (food, health care, buildings and so on) that add up to output.
- **Breaking point**: raise every layer from today toward its 2035 target in small equal steps; the world growth rate at the step where an input's need first goes above the most it has ever been supplied (at its fastest growth on record).
- **Labels**: [S] read from a source, [E] estimated from sourced numbers, [A] assumed. An [A] number is UNTESTED and carries the cheapest test that would settle it.

## Step by step

**0. v4 reproduced.** v4's own code, rerun in a copy outside the repository: its scripts all ran and its checks passed; 16 of 21 output files match the committed ones exactly or to within 1e-6, and the rest differ only in the order of tied rows, the last printed digit and a check's wording (decisions D0.2).

**1. How fast has the world grown?** Rebuilt with PPP weights updated every year (chain-linked) and with former states such as the USSR no longer counted twice in 1990. Nine-year growth 1970-2024: median 3.36%, 90th percentile 3.98%, record 4.28% (1970-1979). v3's fixed-weight series put the record at 4.55%, but that window ends on the double-counted 1990. Output per worker: 90th percentile 2.47%, record 2.57%. Files: base_rates.csv, base_rates_windows.csv, base_rates_series.csv.

**2. On course.** The IMF's October 2026 path (to 2031, its last rate held to 2035) reaches $296.9T. Its own past nine-year paths were all too high; the errors were largest when its forecast was highest, so the main range adjusts for that (decisions D2.3): median $292.0T, range $289.0T to $302.0T. Taken as they happened, the errors would give $274.3T. v4's bottom-up total is lower because it adds up sector trends in people, workers, floor area and vehicles, which miss the shift to better and new products; workers times output per worker on each sector's trend explains 37% of the shortfall, construction on its trend 26% and housing added at that pace 16%. Files: on_course_path.csv, imf_errors.csv, on_course_range.csv, on_course_layers.csv.

**3. Ceiling.** Workers grow 1.11% a year to 2035 (UN population aged 15 and over times each country's employment rate). Adding output per worker at its 90th percentile gives a world ceiling of $308.6T; country by country, every country at the 90th percentile of countries at its income level gives $315.8T. Files: workers_2035.csv, ceiling.csv, ceiling_country_grid.csv.

**4. Backtest.** Standing in each year 1985-2015 with only the data up to then: the world-level ceiling was broken in 48% of years at the 90th percentile; the country version's world total in 0%. Calibrated to be broken in at most 10% of cases, the world total needs the 85th percentile and single countries the 95th. Standing in 1995, 2005 and 2010: the world then grew 3.7%, 3.7% and 3.5% a year over the next nine years, against on-course methods of 3.0%, 3.8% and 4.6% (before 2008 there is no IMF edition to use; limits L4.1). Files: backtest_world.csv, backtest_countries.csv, backtest_calibration.csv.

**5. Split across the 19 layers**, under four rules: (a) v3's income elasticities, (b) every layer grows alike, (c) the spending pattern of the 15 countries closest to the 2035 world income per person, (d) buildings, equipment and software set by the capital a fast-growing economy needs. Net exports are zero for the world, and investment equals saving. Rule d shows that doubling by 2035 with today's ratio of capital to output would need investment of 52% of output, a saving rate of 45% at market prices, against the world's highest saving rate of 2000-2024 (28%) and the highest rate any large economy has reached (51%). Only built structures stays a large part of tier 2 under every rule. Files: sector_split.csv, sector_ranges.csv, split_checks.csv.

**6. Uncertainty.** 20,000 runs over the IMF error, the ceiling's percentile, window and weighting, the split rule and the elasticities. The world's on course is moved most by the IMF error, its tier 2 by the ceiling's percentile; every layer's tier 2 is moved most by the split rule (17 of 17 layers). Files: mc_world.csv, mc_sectors.csv, mc_drivers.csv, mc_sensitivity.csv.

**7. v4's shortages on the new gap.** v4's code, copied with only its paths and layer table changed, reproduces v4 on v3's table and was run on the median case and both ends of the range. Output blocked is kept only in the data, labelled conditional, overlapping, never add. Files: shortages_v5.csv, v4run/.

**8. Inputs, not dollars.** 7 shortages removed (not_inputs.csv); 16 inputs kept. The order below is the median case under v4's base way of producing; the range is across 6 cases and v4's 7 scenarios (42 runs). Files: breaking_points.csv, inputs_v5.csv.

| order | input | need met at record pace | target growth / record growth | breaks at world growth | range across runs | runs that break | label |
|---|---|---|---|---|---|---|---|
| 1 | Physical machine labour (robots) | 4% | 5.8x | 4.3% | 3.4% to 7.9% | 41 of 42 | A |
| 2 | Cropland | 78% | 5.5x | 4.4% | 1.9% to 7.9% | 41 of 42 | A |
| 3 | Capital stock | 81% | 1.4x | 5.5% | 4.1% to 6.2% | 36 of 42 | A |
| 4 | Construction trades | 88% | 1.3x | 6.4% | 1.5% to 6.4% | 36 of 42 | E |
| 5 | Professional licensing | 91% | 1.0x | 7.7% | 6.3% to 7.8% | 36 of 42 | A |
| 6 | Human workforce | 99% | 1.0x | 7.9% | 1.2% to 7.9% | 36 of 42 | E |
| 7 | Copper | 89% | 1.2x | 8.0% | 8.0% to 8.0% | 42 of 42 | E |
| 8 | Electricity | 125% | 0.8x | does not break | - | 0 of 42 | A |
| 9 | Fuels | 123% | 0.5x | does not break | 4.5% to 7.6% | 11 of 42 | E |
| 10 | Machine cognition (AI agents) | 8280% | 0.2x | does not break | - | 0 of 42 | E |
| 11 | AI compute | 8280% | 0.2x | does not break | - | 0 of 42 | A |
| 12 | Lithium | 191% | 0.6x | does not break | - | 0 of 42 | E |
| 13 | Rare earths | 333% | 0.4x | does not break | - | 0 of 42 | E |
| 14 | Steel | 109% | 0.8x | does not break | 5.5% to 7.9% | 13 of 42 | E |
| 15 | Cement | 136% | 0.5x | does not break | 5.6% to 8.0% | 10 of 42 | E |
| 16 | Aluminium | 158% | 0.5x | does not break | - | 0 of 42 | E |

**9. Compared with v4**: compare_v4.csv puts every v4 headline number beside v5's, with the reason it changed.

**10. Checks** (10 of 10 pass, checks_v5.csv): the target is exactly twice 2026; sectors add up to world totals under every rule; world net exports and net purchases abroad are zero in 2035; investment equals saving in every split; the ceiling is at least the on-course path; every breaking point is reproduced by recomputing need there; every downloaded number has a source row and a label; every assumed number carries its cheapest test; git diff against branch stage1-v4 shows no change outside stage1-v5/; v4's code, copied, reproduces v4 on v3's own layer table.

## Files

- [decisions.md](decisions.md): every choice the brief left open, the option taken and why.
- [limits.md](limits.md): what could not be done as asked, and what was done instead.
- [sources.csv](sources.csv): every source read, with URL, access date, size and checksum.
- Tables: [compare_v4.csv](compare_v4.csv), [breaking_points.csv](breaking_points.csv), [inputs_v5.csv](inputs_v5.csv), [not_inputs.csv](not_inputs.csv), [mc_world.csv](mc_world.csv), [mc_sectors.csv](mc_sectors.csv), [sector_split.csv](sector_split.csv), [sector_ranges.csv](sector_ranges.csv), [on_course_range.csv](on_course_range.csv), [ceiling_final.csv](ceiling_final.csv), [backtest_calibration.csv](backtest_calibration.csv), [base_rates.csv](base_rates.csv), [checks_v5.csv](checks_v5.csv), and the headline numbers of each step in numbers_s1.csv ... numbers_s8.csv.
- Rebuild everything: `cd stage1-v5/code && bash run_all.sh`.
