id: permits_grid_fast
name: Much faster building permits and grid connections
category: unblocked
path: full
pitch: "Much faster building permits and grid connections (unblocked)"
restated: "A permitting and grid-connection process that grants building permits in about 1 month and grid connections (and other major infrastructure approvals) in about 12 months, adopted by governments from 2027, so the cost of waiting falls from about 6.8 to about 1.6 cents per dollar of construction (2026 int$ of waiting cost per $ of construction, C13)."
price:
  value: 0.015761
  unit: "2026 int$ of waiting cost per $ of construction (C13)"
  label: A
  sources: [lbnl_small12, soltas_sf]
  derivation: "Batch run, no user to ask: the price is assumed. Wait with the capability T1 = 0.9 x 1 month (building permits) + 0.1 x 12 months (grid connections and other major infrastructure) = 2.1 months [A], times the cost of a month of waiting m_month = 0.0075053 [E] (derivation_inputs) = 0.015761. Anchors: 12 months is today's median from request to agreement for US grid projects under 5 MW (LBNL, S); 1 month is a little faster than US single-family permits in 2000 (1.6 months, snippet, A)."
next_best:
  name: "Today's permitting and grid-connection process: about 9 months of waiting averaged over world construction (about 5 months for building permits, about 45 months for grid connections and other major infrastructure approvals)"
  price:
    value: 0.067548
    unit: "2026 int$ of waiting cost per $ of construction (C13)"
    label: A
    sources: [lbnl_ia45, db_us2020, db2012_world, soltas_sf, iea_invest]
    derivation: "T0 = (1 - s_inf) x T_build + s_inf x T_infra = 0.9 x 5 + 0.1 x 45 = 9.0 months (derivation_inputs), times m_month = 0.0075053 = 0.067548. A, because T_build and s_inf are assumed (only T_infra = 45 months is read in a saved copy). Cross-check: practitioner estimates of the cost of a month of delay (0.75% to 1% of project cost, sources seattle_2month and wa_month, strength 3) agree with m_month."
performance: "The same buildings and power plants, approved sooner: building permits in about 1 month instead of about 5, and grid connections in about 12 months instead of about 45 (US median from interconnection request to agreement; the median US plant built in 2025 took 61 months from request to operation, against 22 months in 2008). Waiting costs the owner the return on the project's value for every month it cannot be used; the model's return on capital (0.090 per $ a year) gives 0.75% of the project's value a month. It is a rule change: no new technology. It needs permit offices and grid operators to process applications faster (staff, digital permitting, standard grid studies). It does not by itself build grid capacity: connecting the held-up projects also needs transformers and cables (see not_mapped). No physics limit is involved."
available_year:
  value: 2027
  unit: year
  label: A
  sources: []
  derivation: "A law or rule can be passed within about a year of a decision; 2027 is the first full year after this run."
spread:
  years_10_to_90:
    value: 12
    unit: years
    label: A
    sources: [db_reforms]
    derivation: "Assumed. Doing Business recorded about 20-24 reforms a year making construction permits easier across about 185-190 economies (search snippet), about one economy in eight a year, but most reforms are small steps; a full move to permits in weeks and connections in a year is assumed to take 12 years to go from 10% to 90% of world construction. Gives a 2035 share of about 14% (with max_share 0.9)."
  max_share:
    value: 0.9
    unit: "share of world construction (C13) value"
    label: A
    sources: []
    derivation: "Assumed: about a tenth of world construction value is informal (self-built housing, mostly in low-income countries) and does not wait for permits, so faster permits do not reach it."
derivation_inputs:             # the pieces of the price and next-best price, each with its own label and source
  m_month:
    value: 0.0075053
    unit: "2026 int$ of waiting cost per $ of construction per month of waiting"
    label: E
    sources: []
    derivation: "price:CAP_INCOME / 12 = 0.0900640 / 12 (model number, input_prices.csv: (1 - labour share) x on-course output / on-course capital stock K21, E). The value of a project is out of use while it waits, so each month costs the return on that value. Practitioner estimates (0.75% and 1% a month, strength 3, A) agree."
  T_build:
    value: 5.0
    unit: "months of waiting for a building permit, average over buildings"
    label: A
    sources: [db_us2020, db2012_world, soltas_sf, soltas_mf]
    derivation: "Assumed from search snippets: Doing Business warehouse permits take 81 days in the US, 105 in Panama, 132 in Bogota, and 193 days on the world average of DB2012 (2.7 to 6.3 months); US single-family permits took 4.9 months in 2023 and multifamily 1.5 years (Soltas et al. 2026). 5 months is taken for the world."
  T_infra:
    value: 45
    unit: "months from grid-connection request to agreement (median, US)"
    label: S
    sources: [lbnl_ia45]
  s_inf:
    value: 0.10
    unit: "share of construction (C13) in grid-connected energy and other major infrastructure"
    label: A
    sources: [iea_invest]
    derivation: "Assumed. Power generation and grids get about USD 1.4 trillion a year (IEA WEO 2025, S), against about USD 13.4 trillion of world construction (ICP 2021, market US$, stage1-v2/baseline/raw/icp2021_1501200); part of the power spending is equipment (C14), so power is about 5% of construction; other large infrastructure with multi-year approvals (pipelines, transmission, highways) is assumed to add about 5%."
  T1_build:
    value: 1.0
    unit: "months of waiting for a building permit with the capability"
    label: A
    sources: [soltas_sf]
    derivation: "Assumed: 'much faster'. US single-family permits took 1.6 months in 2000 (snippet)."
  T1_infra:
    value: 12
    unit: "months from grid-connection request to agreement with the capability"
    label: S
    sources: [lbnl_small12]
  housing_price_elasticity:
    value: -0.55
    unit: "% change in housing bought per 1% change in its price"
    label: S
    sources: [albouy_ts]
  grid_heldup_gw:
    value: 1700
    unit: "GW of renewable projects at advanced stages held up for lack of grid connections (world, 2025)"
    label: S
    sources: [iea_heldup]
  cf_solar:
    value: 0.17
    unit: "capacity factor of new solar PV, 2024 (share of hours at full output)"
    label: S
    sources: [irena_solar]
  cf_wind:
    value: 0.34
    unit: "capacity factor of new onshore wind, 2024"
    label: S
    sources: [irena_wind]
  solar_share_adds:
    value: 0.7982
    unit: "solar PV share of solar plus wind capacity added in 2024"
    label: E
    sources: [irena_adds]
    derivation: "452.1 / (452.1 + 114.3) GW"
demand:
  - id: d1
    good: "new:permit_wait"        # red team fix RT15: was C13; see the comment below
    layer: C13
    mode: cost
    # The price on this curve is the waiting cost per $ of construction, not the price of construction itself. With
    # good C13 the engine would treat this curve and construction_efficient's (good C13, price per $ of construction)
    # as rival options on one good sharing one old price, mixing the two units in a pair. Its own good key keeps the
    # two price falls separate (they add, as two parts of the full price of a structure).
    quantity_unit: "$ of construction (C13) a year, at today's construction prices"
    P0: {use: next_best}
    P1: {use: price}
    Q0:
      model: "oc:C13"
      factor: {value: 1.0e9, unit: "$ of construction per bn of C13 output", label: E, sources: [], derivation: "unit conversion: 1 bn = 1e9 $"}
    elasticity:
      value: -0.0348
      unit: "% change in construction bought per 1% change in the waiting cost"
      label: A
      sources: [albouy_ts]
      derivation: "Buyers respond to the full price of a structure, 1 + c (construction cost plus waiting cost). The elasticity with respect to the waiting cost c is the price elasticity times c0 / (1 + c0) = -0.55 x 0.067548 / 1.067548 = -0.0348. -0.55 is S (Albouy, Ehrlich and Liu 2016, US housing 1970-2014, applied to all construction: A); c0 is A, so the result is A."
      evidence_price_range: [0.0, 0.067548]
    limit:
      value: 1.046e14
      unit: "$ of construction (C13) a year"
      label: E
      sources: []
      derivation: "stage1-v5/not_inputs.csv: K12 record-pace supply 104,600 bn of C13 output (the layer's own record output) x 1e9."
      description: "Construction cannot exceed the C13 layer's record-pace output (stage1-v5). The evidence covers the whole sweep: removing the waiting cost lowers the full price by at most 6.3%, inside the housing price changes the elasticity was measured on. Near zero the constant-elasticity curve overstates the units bought (about 1.16 x Q0 at a waiting cost of 0.001 against 1.04 x Q0 on the full-price curve), which overstates the gain by under 2%."
changes:
  - id: ch1
    kind: supply
    input: K01
    add:
      value: 3042
      unit: "TWh per year (gross generation)"
      label: E
      sources: [iea_heldup, irena_solar, irena_wind, irena_adds]
      derivation: "The held-up projects connected: 1,700 GW (IEA, S) x 0.2043 (average capacity factor = 0.7982 x 0.17 + 0.2018 x 0.34, IRENA 2024 solar and onshore wind, mix of 2024 additions) x 8,760 hours / 1,000 = 3,042 TWh a year. An upper bound for 2035: it assumes the on-course path still has this many projects stuck in queues in 2035. The 1,700 GW is in the saved copy written '1 700 GW'; validate.py reads '1 700' as two numbers and so downgrades derivation_inputs.grid_heldup_gw to A, a parsing limit, not a missing number."
    scale_with: adoption
    mechanism: "Faster grid connections let generation that is built but waiting (or ready to build) feed the grid, so electricity supply K01 rises. Path (b) only: these units cost resources to make, so at today's price they add nothing to path (a) (as research.md's supply_net rule); stage1-v5 finds electricity does not bind before the target, so this change does not move the result on its own."
knock_ons:
  - id: k1
    kind: supply
    input: K05
    add:
      value: 3.6
      unit: "GW of AI chip TDP in service in 2035"
      label: A
      sources: [iea_dc_risk, iea_dc_queue]
      derivation: "IEA: around 20% of projected data-centre additions to 2030 are at risk of delay (grid queues of 1-3 years in the US, up to 7 in northern Virginia, 7-10 in parts of Europe). On-course AI compute rises from 18.9 GW (2026) to about 36.8 GW (2030, geometric path to 84.5 GW in 2035); 20% of the 17.9 GW added is 3.6 GW. A, and an upper bound: a delay to 2030 is mostly made up by 2035."
    scale_with: adoption
    mechanism: "Data centres waiting for a grid connection get connected sooner, so more AI compute is in service. The extra compute costs resources to build, so it should be valued as supply_net (worth nothing extra at today's price to first order). (Red team note RT20: validate.py now accepts the gain_mode key; it is not needed here because the engine gives a K05 knock-on no path (a) value either way.)"
gva_share:
  value: 0.6
  unit: "value added per $ of sales"
  label: A
  sources: []
  derivation: "Assumed: the remaining cost of a permit is mostly the time cost of capital and the work of permit offices, grid planners and consultants (capital income and wages, which are value added); 0.4 is bought-in inputs (software, services)."
capital_per_output:
  value: 0.5
  unit: "$ of capital per $ of output a year"
  label: A
  sources: []
  derivation: "Assumed: a permitting and grid-study service runs on staff and software (offices, IT), far less capital per $ than the economy's average (about 4.8)."
value_beyond_gdp:
  - what: "Carbon dioxide avoided when the held-up wind and solar replace fossil generation sooner (shown beside the result, never added)"
    quantity:
      value: 2.13e9
      unit: "t CO2 a year"
      label: A
      sources: [iea_heldup, irena_solar, irena_wind]
      derivation: "3,042 TWh a year (change ch1, an upper bound) x 0.7 t CO2 per MWh of fossil generation displaced (assumed: coal about 1.0, gas about 0.4)."
    value_per_unit:
      value: 240
      unit: "2026 int$ per t CO2"
      label: A
      sources: [scc_epa]
      derivation: "EPA 2023 social cost of carbon, $190 per t in 2020 dollars at a 2% discount rate, about $240 in 2026 dollars (search snippet)."
published_estimates:
  - claim: "US Council of Economic Advisers (Oct 2026): cutting the completion time of federally permitted projects all the way down to 1 year would raise long-run US GDP by 0.41% to 0.83% ($120bn to $243bn a year)."
    value: 0.62
    unit: "% of US GDP, long run (midpoint of 0.41 to 0.83)"
    scale: "country (US), federally permitted projects (energy, infrastructure), long run"
    sources: [cea2026]
  - claim: "Hsieh and Moretti (2019, AEJ Macro): relaxing land-use rules in New York, San Jose and San Francisco to the median US city's level would have made 2009 US GDP 3.7% higher. A different mechanism (how much may be built where it is most valuable, not how fast), recorded for the comparison only."
    value: 3.7
    unit: "% of US GDP in 2009"
    scale: "country (US), 1964-2009, land-use rules in three metros"
    sources: [hsieh_moretti]
  - claim: "McKinsey: $1.7 to $2.4 trillion of unrealised cumulative US GDP from capital sitting in the federal permitting queue; each dollar takes about four to five years to move through permitting."
    value: 2.05
    unit: "$ tn, cumulative US GDP forgone (midpoint of 1.7 to 2.4)"
    scale: "country (US), federal permitting, cumulative"
    sources: [mckinsey]
  - claim: "Resources for the Future, 'Power Delayed': net cost of power-project delays after economic, environmental and health effects, $24 billion for transmission and $23 billion for generation."
    value: 47
    unit: "$ bn (US), net cost of delays (scenario totals as reported)"
    scale: "country (US), electricity transmission and generation"
    sources: [rff_delayed]
not_mapped:
  - "Faster approvals do not build grid capacity. Many held-up projects also wait for transformers, cables and substations (IEA WEO 2025: tight markets for transformers and other components). Transformers (K14) are not an input in stage1-v5, so the K01 change assumes the equipment is there."
  - "Cheaper electricity: connecting cheap wind and solar sooner lowers the price of electricity for every layer. The machine's only price for electricity is the fixed US retail price, so this saving has no model number here; it is left out, not counted."
  - "Faster connections also delay less the equipment part of energy projects (panels, turbines, transformers, in C14); only the construction part (C13) is in the demand curve."
  - "Spatial misallocation: housing rules keep workers out of the most productive cities (Hsieh and Moretti 2019). The model has no geography; and this is mostly about how much may be built (zoning), not how fast."
  - "Permit fees are left out of the price: the pitch is about speed; fees mostly pay for inspection staff, a transfer within the economy."
  - "Less uncertainty: slow permits make projects risky and some are cancelled (Mayer and Somerville 2000: up to 45% fewer starts in heavily regulated metros). Part of this response may be larger than the price elasticity used here; no sourced size per month of delay was found."
  - "Land and design spending held idle while waiting: land is not in the capital stock K21 and design spending is small, so no recipe change on K21 for C13 is made (it would be under 2% of C13's capital per unit, A)."
  - "Red team note (RT16): the waiting cost m_month charges the return on the whole project's value for each month of waiting, but building-permit waits and the 45 months from grid-connection request to agreement come before construction starts, when only land, design and finance are tied up (as the line above says for path b). What a delay then loses is the project's surplus arriving later plus those carrying costs, which can be well below 0.75% of the project's value a month. The practitioner estimates (0.75-1% a month, strength 3) support m_month, and no sourced alternative was found, so it is kept as [A]; the path (a) gain may be overstated."
  - "Red team note (RT17): ch1 adds the held-up projects (a stock waiting today, on course) to K01's record-pace supply, which already grows at 12.3% a year (stage1-v5) and is not reduced by today's queues in the model; part of it may be counted already. grid_equipment_fast's ch1 adds generation waiting for transformers to the same K01 supply; many held-up projects wait for both, so a pair overlaps. K01 does not bind before the target in stage1-v5, so neither moves a result alone."
refused: false
refusal: ""
sources:
  # --- saved copies in the repository (copied to stage1-v7/sources/) ---
  - id: lbnl_dur2025
    title: "LBNL, Queued Up: 2026 Edition (Rand et al., June 2026); saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt"
    url: "https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf"
    accessed: "2026-11-18"
    quote: "The median project built in 2025 took 61"
    saved_copy: "sources/permits_grid_fast__lbnl_queued_up_2026.txt"
    sha256: "b5d1ec6c43dbcb41abffaa4d51a1709bdf92c92042138427687d1437867697ca"
    strength: 1
    kind: statistics
    published: 2026
  - id: lbnl_dur2008
    title: "LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt"
    url: "https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf"
    accessed: "2026-11-18"
    quote: "months in 2015 and 22 months in 2008"
    saved_copy: "sources/permits_grid_fast__lbnl_queued_up_2026.txt"
    sha256: "b5d1ec6c43dbcb41abffaa4d51a1709bdf92c92042138427687d1437867697ca"
    strength: 1
    kind: statistics
    published: 2026
  - id: lbnl_ia45
    title: "LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt"
    url: "https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf"
    accessed: "2026-11-18"
    quote: "Duration from interconnection request to interconnection agreement sustaining high values over the past several years, with median time of nearly four years (45 months)"
    saved_copy: "sources/permits_grid_fast__lbnl_queued_up_2026.txt"
    sha256: "b5d1ec6c43dbcb41abffaa4d51a1709bdf92c92042138427687d1437867697ca"
    strength: 1
    kind: statistics
    published: 2026
  - id: lbnl_small12
    title: "LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt"
    url: "https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf"
    accessed: "2026-11-18"
    quote: "Median is 12 months for projects <5 MW"
    saved_copy: "sources/permits_grid_fast__lbnl_queued_up_2026.txt"
    sha256: "b5d1ec6c43dbcb41abffaa4d51a1709bdf92c92042138427687d1437867697ca"
    strength: 1
    kind: statistics
    published: 2026
  - id: lbnl_completion
    title: "LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt"
    url: "https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf"
    accessed: "2026-11-18"
    quote: "About 19% of projects (13% of capacity) requesting interconnection"
    saved_copy: "sources/permits_grid_fast__lbnl_queued_up_2026.txt"
    sha256: "b5d1ec6c43dbcb41abffaa4d51a1709bdf92c92042138427687d1437867697ca"
    strength: 1
    kind: statistics
    published: 2026
  - id: iea_heldup
    title: "IEA, World Energy Outlook 2025; saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt"
    url: "https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf"
    accessed: "2026-11-18"
    quote: "Around 1 700 GW of renewable energy projects at advanced stages of development are being held up today because grid connections are not available."
    saved_copy: "sources/permits_grid_fast__iea_weo2025.txt"
    sha256: "6244c47677ac73062ab82ca02a83840bcdf6f3d13691495ce235a6dda4bbe09d"
    strength: 1
    kind: statistics
    published: 2025
  - id: iea_dc_queue
    title: "IEA, World Energy Outlook 2025 (data-centre connection queues); saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt"
    url: "https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf"
    accessed: "2026-11-18"
    quote: "While queue times are one to three years in the United States on average, it can take up to seven years to get connected in northern Virginia."
    saved_copy: "sources/permits_grid_fast__iea_weo2025.txt"
    sha256: "6244c47677ac73062ab82ca02a83840bcdf6f3d13691495ce235a6dda4bbe09d"
    strength: 1
    kind: statistics
    published: 2025
  - id: iea_dc_risk
    title: "IEA, World Energy Outlook 2025 (data centres at risk of delay); saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt"
    url: "https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf"
    accessed: "2026-11-18"
    quote: "IEA analysis estimates that because of these factors, around 20% of the projected data centre additions by 2030 could be at risk of delay."
    saved_copy: "sources/permits_grid_fast__iea_weo2025.txt"
    sha256: "6244c47677ac73062ab82ca02a83840bcdf6f3d13691495ce235a6dda4bbe09d"
    strength: 2
    kind: forecast
    published: 2025
  - id: iea_invest
    title: "IEA, World Energy Outlook 2025 (power investment); saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt"
    url: "https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf"
    accessed: "2026-11-18"
    quote: "Investments in electricity generation have charged ahead by almost 70% since 2015 to reach USD 1 trillion per year, but annual grid spending has risen at less than half the pace to USD 400 billion."
    saved_copy: "sources/permits_grid_fast__iea_weo2025.txt"
    sha256: "6244c47677ac73062ab82ca02a83840bcdf6f3d13691495ce235a6dda4bbe09d"
    strength: 1
    kind: statistics
    published: 2025
  - id: albouy_ts
    title: "Albouy, Ehrlich and Liu (2016), Housing Demand, Cost-of-Living Inequality, and the Affordability Crisis, NBER Working Paper 22816 (not peer-reviewed: strength 2); saved copy from stage1-v2/v1/agent2_ratios/raw/albouy_w22816/w22816.txt"
    url: "https://www.nber.org/system/files/working_papers/w22816/w22816.pdf"
    accessed: "2026-11-18"
    quote: "Estimates from the BEA numbers with the official CPI, shown in column 1, imply an own-price elasticity of -0.55, an income elasticity of 0.61, and household size effect of -0.36."
    saved_copy: "sources/permits_grid_fast__albouy_w22816.txt"
    sha256: "2edc94943cde12e51102c439353f5f2eb81251fab4743c59d4a5f66f93dcf13e"
    strength: 2
    kind: study
    published: 2016
  - id: albouy_cs
    title: "Albouy, Ehrlich and Liu (2016), NBER WP 22816, cross-metro estimate; saved copy from stage1-v2/v1/agent2_ratios/raw/albouy_w22816/w22816.txt"
    url: "https://www.nber.org/system/files/working_papers/w22816/w22816.pdf"
    accessed: "2026-11-18"
    quote: "Overall, our preferred estimates in column 3 reveal an uncompensated price elasticity of roughly -2/3"
    saved_copy: "sources/permits_grid_fast__albouy_w22816.txt"
    sha256: "2edc94943cde12e51102c439353f5f2eb81251fab4743c59d4a5f66f93dcf13e"
    strength: 2
    kind: study
    published: 2016
  - id: irena_solar
    title: "IRENA, Renewable Power Generation Costs in 2024 (summary), Table S1; saved copy from stage1-v2/agent6_cheap_inputs/raw/irena_rpgc2024/summary.txt"
    url: "https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf"
    accessed: "2026-11-18"
    quote: "Solar PV 5 283 691 -87% 15 17 13% 0.417 0.043 -90%"
    saved_copy: "sources/permits_grid_fast__irena_rpgc2024.txt"
    sha256: "7f28f7d0e883a6371c59ddd7f26da1cb0ba398f5b2ba79e0efb8810870a07c4a"
    strength: 1
    kind: statistics
    published: 2025
  - id: irena_wind
    title: "IRENA, Renewable Power Generation Costs in 2024 (summary), Table S1; saved copy from stage1-v2/agent6_cheap_inputs/raw/irena_rpgc2024/summary.txt"
    url: "https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf"
    accessed: "2026-11-18"
    quote: "Onshore wind 2 324 1 041 -55% 27 34 26% 0.113 0.034 -70%"
    saved_copy: "sources/permits_grid_fast__irena_rpgc2024.txt"
    sha256: "7f28f7d0e883a6371c59ddd7f26da1cb0ba398f5b2ba79e0efb8810870a07c4a"
    strength: 1
    kind: statistics
    published: 2025
  - id: irena_adds
    title: "IRENA, Renewable Power Generation Costs in 2024 (summary), capacity additions; saved copy from stage1-v2/agent6_cheap_inputs/raw/irena_rpgc2024/summary.txt"
    url: "https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf"
    accessed: "2026-11-18"
    quote: "Solar photovoltaics (PV) led this surge, accounting for 452.1 GW (77.8%) of the total, followed by wind, with 114.3 GW."
    saved_copy: "sources/permits_grid_fast__irena_rpgc2024.txt"
    sha256: "7f28f7d0e883a6371c59ddd7f26da1cb0ba398f5b2ba79e0efb8810870a07c4a"
    strength: 1
    kind: statistics
    published: 2025
  # --- found only by web search: no saved copy (see sources/pending_permits_grid_fast.csv); numbers from them are A ---
  - id: soltas_sf
    title: "Soltas et al. (2026), permit records for 60 US cities 2000-2025 (Princeton / University of Chicago working paper), as reported by Multi-Housing News; search snippet only"
    url: "https://www.multihousingnews.com/why-permitting-time-has-doubled-since-2000/"
    accessed: "2026-11-18"
    quote: "Single-family permitting times have tripled nationally since 2000, from 1.6 months to 4.9 months by 2023."
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: study
    published: 2026
  - id: soltas_mf
    title: "Soltas et al. (2026), as reported by Multi-Housing News; search snippet only"
    url: "https://www.multihousingnews.com/why-permitting-time-has-doubled-since-2000/"
    accessed: "2026-11-18"
    quote: "Average multifamily permitting time rose from about 0.6 years in 2000 to 1.5 years in 2023"
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: study
    published: 2026
  - id: db_us2020
    title: "World Bank, Doing Business 2020, United States economy profile (dealing with construction permits); search snippet only"
    url: "https://subnational.doingbusiness.org/content/dam/doingBusiness/country/u/united-states/USA.pdf"
    accessed: "2026-11-18"
    quote: "The profile lists 16 procedures, 81 days, and a cost of 0.7% of warehouse value"
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: statistics
    published: 2019
  - id: db2012_world
    title: "World Bank, Doing Business 2012, Dealing with construction permits chapter; search snippet only"
    url: "https://www.doingbusiness.org/content/dam/doingBusiness/media/Annual-Reports/English/DB12-Chapters/Dealing-with-construction-permits.pdf"
    accessed: "2026-11-18"
    quote: "the average time to deal with construction formalities fell from 208 days to 193"
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: statistics
    published: 2011
  - id: db_reforms
    title: "World Bank, Doing Business, Dealing with construction permits chapters (reform counts); search snippet only"
    url: "https://subnational.doingbusiness.org/content/dam/doingBusiness/media/Annual-Reports/English/DB14-Chapters/DB14-Dealing-with-construction-permits.pdf"
    accessed: "2026-11-18"
    quote: "For the 2012/13 cycle, Doing Business recorded 24 reforms making it easier to deal with construction permits and 2 making it more difficult."
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: statistics
    published: 2013
  - id: wa_month
    title: "National League of Cities, Housing Supply Fact Sheet 5 (citing a Washington State study, also cited by Mercatus and the 2024 CEA); search snippet only"
    url: "https://www.nlc.org/wp-content/uploads/2025/09/Housing-Supply-Fact-Sheet-5.pdf"
    accessed: "2026-11-18"
    quote: "each additional month spent on the permitting process can increase the cost of building by about 1%"
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: claim
    published: 2025
  - id: seattle_2month
    title: "Sightline Institute, citing Seattle planners' analysis of permitting delay; search snippet only"
    url: "https://www.sightline.org/?p=61333"
    accessed: "2026-11-18"
    quote: "a two month delay adds about 1.5 percent to total project cost"
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: claim
    published: 2023
  - id: cbo_wp2026
    title: "CBO Working Paper 2026-10, A Model for Estimating the Economic Effects of Changes in Permitting Requirements (Swanson, July 2026); search snippet only"
    url: "https://www.cbo.gov/publication/62517"
    accessed: "2026-11-18"
    quote: "longer or more uncertain permitting processes increase the user cost of capital and reduce investment"
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: forecast
    published: 2026
  - id: cea2026
    title: "Council of Economic Advisers, The Economic Benefits of Permitting Reform (October 2026); search snippet only"
    url: "https://www.whitehouse.gov/research/2026/10/the-economic-benefits-of-permitting-reform/"
    accessed: "2026-11-18"
    quote: "reducing completion time even more aggressively – all the way down to 1 year – would increase long-run GDP by between 0.41 percent and 0.83 percent"
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: forecast
    published: 2026
  - id: mckinsey
    title: "McKinsey, Unlocking US federal permitting: A sustainable growth imperative; search snippet only"
    url: "https://www.mckinsey.com/industries/public-sector/our-insights/unlocking-us-federal-permitting-a-sustainable-growth-imperative"
    accessed: "2026-11-18"
    quote: "$1.7 trillion to $2.4 trillion in unrealized cumulative GDP"
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: claim
    published: 2025
  - id: hsieh_moretti
    title: "Hsieh and Moretti (2019), Housing Constraints and Spatial Misallocation, American Economic Journal: Macroeconomics; search snippet only"
    url: "https://eml.berkeley.edu//~moretti/growth.pdf"
    accessed: "2026-11-18"
    quote: "In this scenario, US GDP in 2009 would be 3.7 percent higher"
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: forecast
    published: 2019
  - id: rff_delayed
    title: "Resources for the Future, Power Delayed: the hidden costs of postponing power projects (Resources Radio, McKenna Peplinski); search snippet only"
    url: "https://resources.org/resources-radio/power-delayed-the-hidden-costs-of-postponing-power-projects-with-mckenna-peplinski"
    accessed: "2026-11-18"
    quote: "the net cost of delays after accounting for economic, environmental, and health effects at $24 billion for transmission and $23 billion for generation"
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: forecast
    published: 2026
  - id: mayer_somerville
    title: "Mayer and Somerville (2000), Land use regulation and new construction, Regional Science and Urban Economics 30; search snippet only"
    url: "https://realestate.wharton.upenn.edu/wp-content/uploads/2017/03/331.pdf"
    accessed: "2026-11-18"
    quote: "up to 45 percent fewer starts"
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: study
    published: 2000
  - id: scc_epa
    title: "Resources for the Future, Report 26-11 (EPA 2023 social cost of carbon in 2026 dollars); search snippet only"
    url: "https://media.rff.org/documents/Report_26-11_Final.pdf"
    accessed: "2026-11-18"
    quote: "the $190 value (in 2020 dollars) is equivalent to about $240 in 2026 dollars"
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: forecast
    published: 2026