# Starter 7 (stage1-v7, Part B2). Written by the research agent (full path, batch run, 2026-11-18).
# Research log: pitch/logs/trades_training_fast.md. Every number: value, unit, label (S/E/A), sources, derivation.
id: trades_training_fast
name: Tradespeople trained far faster
category: faster
path: full
pitch: "Tradespeople trained far faster (faster)"
restated: "Training that brings a new entrant to a qualified construction trade (bricklayer, carpenter, electrician, plumber and the other craft trades, ISCO 7) in about six months of intensive full-time training instead of about three years of apprenticeship, available from 2028, at about $17,900 per tradesperson trained against about $33,300 today (2026 int$ of resources per tradesperson trained: the output the trainee does not produce while learning, compared with a qualified tradesperson, plus instruction)."
price:
  value: 17928
  unit: "2026 int$ of resources per tradesperson trained (output forgone while learning, against a qualified tradesperson, plus instruction)"
  label: A
  sources: []
  derivation: "Batch run, no user to ask: the price is assumed. 'Far faster' is read as T1 = 0.5 years of training [A] (derivation_inputs.T1), full-time and off the job (the trainee produces nothing while in the course: forgone output 1.0 of a qualified tradesperson's pay per year), with intensive instruction of 0.2 of that pay per year [A] (simulators, AI tutors, more instructors per trainee). Price = 0.5 x (1.0 + 0.2) x WAGE_PHYS 29,880 (model price:WAGE_PHYS, pay per worker-year of physical work, on course 2035) = 17,928. Chosen as the plain reading of a short intensive course; a faster method that keeps trainees working (guided on-the-job learning) would cost about 0.5 x (0.272 + 0.05) x 29,880 = 4,800. The runs sweep the price from the next-best price (33,345) down to near zero, so the reference price matters less than the next-best price, the demand curve, the spread and the model changes."
next_best:
  name: "Today's training: about three years of apprenticeship or on-the-job learning (US registered apprenticeships are mostly four years or 8,000 hours; German dual apprenticeships about three years; informal apprenticeships one to two years or longer), during which the trainee works at about the level of an elementary construction worker."
  price:
    value: 33345
    unit: "2026 int$ of resources per tradesperson trained (output forgone while learning, against a qualified tradesperson, plus instruction)"
    label: A
    sources: [ilo_ear, dol_4yr, bibb_2017, giz_informal]
    derivation: "T0 = 3 years [A] x (forgone output f0 = 0.2720 [A, from the ILO earnings ratio] + instruction 0.10 [A]) x WAGE_PHYS 29,880 (model) = 3 x 0.3720 x 29,880 = 33,345. A because T0 and the instruction share are assumed. Cross-check: the German BIBB survey puts gross costs at 20,855 euros and returns (the apprentice's productive output) at 14,377 euros per apprentice per year, so returns cover about 69% of gross costs (snippet, A); the 0.372 of a qualified worker's pay per year used here lies between the net cost (6,478 euros, about 0.13 of a German skilled wage) and the gross cost (about 0.4)."
performance: "The same qualified tradespeople, ready in about six months instead of about three years. It changes how fast a person becomes productive, not how many people there are: the new tradespeople come from the human workforce (K18), as entrants who would otherwise have worked as labourers or in other jobs, so they are moved workers, not extra workers. Their gain is that they produce at the qualified level sooner, and that more people become tradespeople when training costs less. Comparable cases: in the Second World War US shipyards trained people with no experience as welders in weeks, and US welders and flame-cutters rose from 125,000 in March 1940 to an estimated wartime peak of 364,000 (BLS 1945, snippet), so fast training can support a fast rise in a trade; but the record pace of construction employment in the model was set mostly with informal on-the-job learning (China's construction boom), so training is not the only limit on how fast trades can grow. Licensed trades (electricians, plumbers) need set hours of supervised work in many places (8,000 hours for many US apprenticeships), so 'far faster' also needs rules that accept tested competence instead of hours. No physics limit is involved."
available_year:
  value: 2028
  unit: year
  label: A
  sources: []
  derivation: "Assumed: intensive trade courses, simulators and guided on-the-job learning exist today in pieces (pre-apprenticeship courses, wartime-style task training); 2028 is taken as the first year a full qualification in six months is offered and accepted by employers and licensing bodies."
spread:
  years_10_to_90:
    value: 10
    unit: years
    label: A
    sources: []
    derivation: "Assumed: training systems are run by schools, employers and licensing bodies and change slowly; 10 years from 10% to 90% of trainees, as for the spread of a new institution. With max_share 0.8 and 1% of it in 2028 this gives a 2035 share of 0.144 (engine logistic)."
  max_share:
    value: 0.8
    unit: "share of new construction tradespeople trained with the method"
    label: A
    sources: []
    derivation: "Assumed: some trades and countries keep time-based training (licensing rules, unions, very complex trades); four fifths of trainees at most."
derivation_inputs:             # the pieces of the price, Q0 and the supply change, each with its own label and source
  trades_share:
    value: 0.3921
    unit: "craft and related trades workers (ISCO 7) per construction worker (ISIC F)"
    label: E
    sources: [ilo_emp_con]
    derivation: "ILOSTAT employment by economic activity and occupation, construction, latest year (2021-2025) in 38 countries with data: sum of ISCO 7 62,574.3 thousand / sum of all occupations 159,575.1 thousand = 0.3921 (pooled; median country 0.490, range 0.073 JPN to 0.831 EGY). China is not in the data. Elementary occupations (ISCO 9) are 0.438."
  trades_pay_ratio:
    value: 1.3736
    unit: "mean earnings of craft and related trades workers (ISCO 7) over elementary workers (ISCO 9)"
    label: E
    sources: [ilo_ear]
    derivation: "ILOSTAT mean monthly earnings in PPP dollars, latest year with both groups, 39 countries: median of the per-country ratio ISCO 7 / ISCO 9 = 1.3736 (25th to 75th percentile 1.257 to 1.569)."
  f0:
    value: 0.2720
    unit: "output a trainee does not produce per year of on-the-job training, as a share of a qualified tradesperson's output"
    label: A
    sources: [ilo_ear, bibb_2017]
    derivation: "1 - 1 / trades_pay_ratio 1.3736 = 0.2720: a trainee on the job is assumed to produce what an elementary worker produces (pay taken as output). A because that is assumed; anchor: in Germany an apprentice's productive output covers about 69% of the firm's gross cost of training (BIBB, snippet)."
  T0:
    value: 3
    unit: "years of training to a qualified trade today (world average)"
    label: A
    sources: [dol_4yr, giz_informal, bibb_2017]
    derivation: "Assumed: most US registered apprenticeships are four years or 8,000 hours (snippet); German dual apprenticeships about three years; informal apprenticeships typically one to two years (GIZ/EU note, snippet), up to eight to ten years in a Cote d'Ivoire study (snippet). Three years for the world."
  T1:
    value: 0.5
    unit: "years of training to a qualified trade with the capability"
    label: A
    sources: [bls_welders]
    derivation: "Assumed: 'far faster' read as six months, six times faster; wartime shipyards trained welders for single tasks in weeks (snippets), and a full trade needs more than one task."
  exit_rate:
    value: 0.03333
    unit: "share of construction workers leaving the trade each year (retirement and other exits)"
    label: A
    sources: [citb_2025, abc_2025]
    derivation: "Assumed: careers of about 30 years in construction. Not sourced: CITB (UK) puts all recruitment needs at 1.8% of the workforce a year and ABC (US) about 439,000 net new workers in 2025, but neither splits replacement from growth (snippets)."
  growth_oc:
    value: 0.02312
    unit: "growth of construction workers a year, on course 2026-2035"
    label: E
    sources: []
    derivation: "(K17 on course 2035 380.2 / K17 2026 309.5) ^ (1/9) - 1 = 0.02312 (model_ids.md)."
  growth_record:
    value: 0.05359
    unit: "growth of construction workers a year, record pace 2026-2035"
    label: E
    sources: []
    derivation: "(K17 record pace 2035 495.1 / 309.5) ^ (1/9) - 1 = 0.05359 (model_ids.md)."
  inflow_record:
    value: 16.874
    unit: "million new tradespeople trained a year in 2035 at the record pace of construction employment"
    label: A
    sources: [ilo_emp_con]
    derivation: "K17 record pace 495.1 million x trades_share 0.3921 x (growth_record 0.05359 + exit_rate 0.03333) = 16.874 million. A because the exit rate is assumed."
  years_saved_effective:
    value: 0.3160
    unit: "qualified-worker-years of output gained per tradesperson trained with the method"
    label: A
    sources: [ilo_ear]
    derivation: "T0 3 x f0 0.2720 (old: three years at a labourer's output) - T1 0.5 x 1.0 (new: half a year off the job) = 0.8160 - 0.5 = 0.3160."
  extra_trainees:
    value: 0.1972
    unit: "extra tradespeople trained per tradesperson trained today, at the capability's price"
    label: A
    sources: [denning_2017]
    derivation: "(P1 / P0) ^ elasticity - 1 = (17,928 / 33,345) ^ -0.29 - 1 = 0.5377 ^ -0.29 - 1 = 0.1972 (the demand curve d1 at the reference price)."
  cohort_years:
    value: 1.9368
    unit: "years of trainees (2028-2034) working in 2035, per year of 2035's spread"
    label: E
    sources: []
    derivation: "Sum over 2028-2034 of the engine's spread a(t) / a(2035) = (0.0080 + 0.0123 + 0.0190 + 0.0291 + 0.0443 + 0.0667 + 0.0989) / 0.1437 = 1.9368 (the extra tradespeople trained in each year since 2028 are still at work in 2035; exits over seven years ignored)."
demand:
  - id: d1
    good: "new:trades_training"
    layer: C13
    mode: cost
    quantity_unit: "tradespeople (construction trades, ISCO 7) trained a year"
    P0: {use: next_best}
    P1: {use: price}
    Q0:
      model: "O:K17"
      factor:
        value: 22136.6
        unit: "tradespeople trained a year per million construction workers (K17)"
        label: A
        sources: [ilo_emp_con]
        derivation: "trades_share 0.3921 [E] x (growth_oc 0.02312 [E] + exit_rate 0.03333 [A]) x 1e6 = 22,136.6, so Q0 = 380.2 x 22,136.6 = 8.416 million trained a year in 2035 on course. The trades share of today is kept to 2035. A because the exit rate is assumed."
    elasticity:
      value: -0.29
      unit: "% change in tradespeople trained per 1% change in the cost of training"
      label: A
      sources: [denning_2017, aepli_2024]
      derivation: "-0.29 is the elasticity of first-year community college enrolment with respect to tuition in Texas (Denning 2017, AEJ: Policy; search snippet, so A), used here for the full cost of trades training. It could be too small (people respond to tuition, and tuition is a small part of the full cost, so the same response to the full cost would be larger) or too large (the number trained is mostly set by employers' demand for tradespeople, and cheaper training lowers construction prices only a little). Firms' apprenticeship training also responds to costs: a hiring-cost elasticity of apprenticeship contracts of 1.4 for Swiss firms (Aepli et al. 2024, snippet), much smaller for German firms. The [A] band (halved to doubled) covers -0.15 to -0.58."
      evidence_price_range: [30010, 33345]
    limit:
      value: 2.1465e7
      unit: "tradespeople trained a year"
      label: A
      sources: []
      derivation: "All people entering construction work a year in 2035 on course: K17 on course 380.2 million x (growth_oc 0.02312 + exit_rate 0.03333) = 21.465 million: at most every entrant is trained as a tradesperson."
      description: "At most every entrant to construction is trained in a trade (number of people). The evidence (a $1,000 cut in tuition, a small part of the full cost of training) covers only about the top tenth of the price range (30,010 to 33,345 here); below 30,010 the curve is beyond the evidence. The limit is reached near a price of about 1,320 (Q = 2.55 x Q0)."
changes:
  - id: ch1
    kind: supply
    input: K17
    add:
      value: 7.084
      low: 2.666
      high: 11.775
      unit: "million construction workers (ISIC F) in 2035"
      label: A
      sources: [ilo_emp_con, ilo_ear, denning_2017]
      derivation: "At full adoption (the engine scales it by the 2035 spread, 0.144): trainees a year at the record pace inflow_record 16.874 million x (years_saved_effective 0.3160 + extra_trainees 0.1972 x f0 0.2720 x cohort_years 1.9368) = 16.874 x (0.3160 + 0.1039) = 7.084 million worker-equivalents (1.43% of the record-pace supply). The record-pace inflow is used because path (b) adds to the record-pace supply, where construction employment grows at its record rate. Each extra tradesperson counts 0.272 (a labourer who becomes a tradesperson adds the trade's extra output, not a person). Low 2.666: half the time saved, no extra trainees. High 11.775: each extra tradesperson is a whole worker moved into construction from another layer (+1 each)."
    scale_with: adoption
    mechanism: "Tradespeople are productive at the qualified level about two and a half years sooner, and more people learn a trade, so the same people supply more construction work: the effective supply of construction trades K17 rises (path b). These are moved workers, not extra people. Path (a) values the same mechanism once, through the demand curve d1; this change is not a knock-on, so path (a) does not value it again."
  - id: ch2
    kind: supply
    input: K18
    add:
      value: 7.084
      low: 2.666
      high: 7.084
      unit: "million workers in 2035"
      label: A
      sources: [ilo_emp_con, ilo_ear, denning_2017]
      derivation: "The same worker-equivalents as ch1 (7.084 million at full adoption, scaled by the 2035 spread): the faster-trained tradespeople are part of the human workforce, and K18, like K17, counts workers at today's output per worker, so the time they gain is also more human work. No new people: the high case is the same 7.084, because people moved from other layers into construction (ch1's high case) do not add to the human workforce."
    scale_with: adoption
    mechanism: "The same gain in effective work as ch1, carried to the human-workforce limit K18 (path b only). Not a second count of ch1: K17 limits construction workers and K18 all human workers, and each is its own need in path (b); neither change is valued in path (a)."
knock_ons:
  - id: k1
    kind: supply
    input: K21
    add:
      value: 2.875
      unit: "tn 2026 int$ (PPP) of capital stock in 2035"
      label: A
      sources: [nahb_hbi_2025]
      derivation: "At full adoption (scaled by the 2035 spread): 1.98 months of delay from the shortage of tradespeople (US homes, NAHB-HBI 2025, snippet) / 12 x 0.25 of world construction assumed to face such a shortage [A] x C13 on course 2035 69,696.9 bn / 1000 = 2.875 tn; x 0.144 = 0.41 tn."
    scale_with: adoption
    gain_mode: supply_gross
    mechanism: "Where a shortage of tradespeople holds buildings up (US homes wait about two months longer), training that fills the shortage in months instead of years lets structures start earning sooner, so the capital tied up in unfinished buildings falls and the usable capital stock K21 rises. Assumed size; shown as possible extra."
gva_share:
  value: 0.6
  unit: "value added per $ of sales"
  label: A
  sources: []
  derivation: "Assumed: the price is mostly the trainee's own time (0.5 of a year's pay of 0.6 per trainee) and instruction (0.1); instruction is labour-intensive education (most of its sales are value added). Note: the engine's sales base is the price times the trainees trained, not a training industry's sales."
capital_per_output:
  value: 1.0
  unit: "$ of capital per $ of output a year"
  label: A
  sources: []
  derivation: "Assumed: training centres with workshops and simulators need buildings and equipment of about a year's output, like schools."
value_beyond_gdp: []
published_estimates:
  - claim: "NAHB and the Home Builders Institute (2025, study by the University of Denver): the shortage of skilled labour in US home building costs about $10.8 billion a year: $2.66 billion of carrying costs from build times 1.98 months longer and $8.14 billion of lost production (about 19,000 single-family homes not built in 2024)."
    value: 10.806
    unit: "$ bn a year (US, market US$)"
    scale: "country (US), single-family home building, 2024"
    sources: [nahb_hbi_2025]
  - claim: "CITB Construction Workforce Outlook 2025-29: UK construction needs about 47,860 extra workers a year (239,300 over five years), 1.8% of the 2024 workforce a year. The size of the need, not of an economic effect."
    value: 47860
    unit: "extra workers a year (UK)"
    scale: "country (UK), 2025-2029"
    sources: [citb_2025]
  - claim: "Associated Builders and Contractors (January 2025): US construction must attract about 439,000 net new workers in 2025 (501,000 in 2024). The size of the need, not of an economic effect."
    value: 439000
    unit: "net new workers needed in a year (US)"
    scale: "country (US), 2025"
    sources: [abc_2025]
not_mapped:
  - "A faster rise in the record pace itself: with training in months, the construction workforce might grow faster than any country's record (wartime US welders nearly tripled in about three years), which would be a growth_add on K17. Not added: no sourced size, the record was set mostly with informal on-the-job learning, and it would be a second supply change on K17 by the same mechanism as ch1."
  - "Trainees in full-time vocational schools (common in China, France and elsewhere) who would leave school two or more years sooner would add genuinely extra human work (K18); trainees in the six-month course are off the job for half a year where an on-the-job apprentice works. The two roughly offset and their time is already valued in the price, so no extra K18 headcount is added beyond ch2."
  - "Skill mix: the model's K17 counts all construction workers at a fixed output per worker. A shortage of particular trades (electricians for grid and data-centre work, for example) that holds back projects even when labourers are plentiful has no model number; the K21 knock-on carries only the waiting cost."
  - "Tradespeople outside construction (electricians, plumbers and fitters in manufacturing, maintenance and utilities) would gain too; Q0 covers construction trades only."
  - "Safety: new workers have more accidents; whether six months of intensive training makes new tradespeople safer or less safe than three years of apprenticeship is not known. No model number."
  - "Quality of work and the experience that comes only from years on sites: if the method does not give it, buildings need more rework or supervision; not mapped."
refused: false
refusal: ""
sources:
  # --- saved copies in the repository (extracted into stage1-v7/sources/) ---
  - id: ilo_emp_con
    title: "ILOSTAT, Employment by sex, economic activity and occupation (thousands), DF_EMP_TEMP_ECO_OCU_NB: construction by ISCO-08 major group, latest year per country. Extract of stage1-v2/agent6_cheap_inputs/raw/ilo_emp_eco_ocu/<country>.csv (38 countries with construction data)"
    url: "https://sdmx.ilo.org/rest/data/ILO,DF_EMP_TEMP_ECO_OCU_NB,1.0/{country}.A....?startPeriod=2015"
    accessed: "2026-11-18"
    quote: "USA,A,EMP_TEMP_NB,ECO_AGGREGATE_CON,OCU_ISCO08_7,2025,4981.909"
    saved_copy: "sources/trades_training_fast__ilo_emp_con_ocu.txt"
    sha256: "dca74e1f5f3eb1cdfea62507570e5915f3d86866261974cdb0284f0d4b363831"
    strength: 1
    kind: statistics
    published: 2026
  - id: ilo_ear
    title: "ILOSTAT, Mean nominal monthly earnings of employees by sex and occupation, DF_EAR_EMTA_SEX_OCU_CUR_NB, PPP dollars, ISCO-08 groups 7 and 9, latest year per country. Extract of stage1-v2/agent6_cheap_inputs/raw/ilo_ear_ocu/<country>.csv (39 countries)"
    url: "https://sdmx.ilo.org/rest/data/ILO,DF_EAR_EMTA_SEX_OCU_CUR_NB,1.0/{country}.A..SEX_T..?startPeriod=2015"
    accessed: "2026-11-18"
    quote: "USA,A,EAR_EMTA_NB,SEX_T,OCU_ISCO08_7,CUR_TYPE_PPP,2025,5381.995"
    saved_copy: "sources/trades_training_fast__ilo_ear_ocu.txt"
    sha256: "a57f6d353da07d7df8623f030f4bbf5014840c55f4389c76682c636314ea590a"
    strength: 1
    kind: statistics
    published: 2026
  # --- web pages found by search only (no saved copy: numbers resting on them are A; listed in sources/pending_trades_training_fast.csv) ---
  - id: denning_2017
    title: "Denning (2017), College on the Cheap: Consequences of Community College Tuition Reductions, American Economic Journal: Economic Policy 9(2): 155-88 (as summarised by the AEA research highlight and the Texas ERC brief); search snippet only"
    url: "https://www.aeaweb.org/research/texas-tuition-cuts-preview-free-community-college"
    accessed: "2026-11-18"
    quote: "Community college enrollment in the first year after high school increased by 5.1 percentage points for each $1,000 decrease in tuition, which implies an elasticity of -0.29."
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: study
    published: 2017
  - id: aepli_2024
    title: "Aepli, Wenzelmann, Wolter et al. (2024), The impact of hiring costs for skilled workers on apprenticeship training, IZA Discussion Paper 16919 (working paper: strength 2); search snippet only"
    url: "https://docs.iza.org/dp16919.pdf"
    accessed: "2026-11-18"
    quote: "The headline estimate is a hiring-cost elasticity of apprenticeship contracts of 1.4 for Swiss firms."
    saved_copy: ""
    sha256: ""
    strength: 2
    kind: study
    published: 2024
  - id: bibb_2017
    title: "Schoenfeld et al., Training in Germany: an investment to counter the skilled worker shortage. Results of the 2017/18 BIBB Cost-Benefit Survey (Federal Institute for Vocational Education and Training); search snippet only"
    url: "https://bibb.de/dienst/publikationen/de/download/16745"
    accessed: "2026-11-18"
    quote: "Average gross cost per apprentice in 2017/18 was €20,855."
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: statistics
    published: 2020
  - id: dol_4yr
    title: "Delaware Department of Labor, apprenticeship page (US registered apprenticeship standards); search snippet only"
    url: "https://labor.delaware.gov/tag/veterans/?p=486"
    accessed: "2026-11-18"
    quote: "most Registered Apprenticeships are four years in length or 8,000 hours of on-the-job training"
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: statistics
    published: 2024
  - id: giz_informal
    title: "EU capacity4dev / GIZ guidance note on informal apprenticeship; search snippet only (an ILO-linked Cote d'Ivoire study in the same search reports eight to ten years)"
    url: "https://capacity4dev.europa.eu/media/30337/download/63faad92-7dc1-4edc-a51f-9d87e5b8755a_en"
    accessed: "2026-11-18"
    quote: "typically lasts one to two years"
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: claim
    published: 2020
  - id: bls_welders
    title: "US Bureau of Labor Statistics (1945), Employment Opportunities for Welders, Bulletin 844 (FRASER); search snippet only"
    url: "https://fraser.stlouisfed.org/files/docs/publications/bls/bls_0844_1945.pdf"
    accessed: "2026-11-18"
    quote: "125,000 welders and flame-cutters employed in March 1940"
    saved_copy: ""
    sha256: ""
    strength: 1
    kind: statistics
    published: 1945
  - id: nahb_hbi_2025
    title: "NAHB press release (June 2025), New Study Reveals Significant Economic Impact of Housing Industry Labor Shortage (NAHB and Home Builders Institute, study by the University of Denver; industry-commissioned: strength 3); search snippet only"
    url: "https://www.nahb.org/news-and-economics/press-releases/2025/06/new-study-reveals-significant-economic-impact-of-housing-industry-labor-shortage"
    accessed: "2026-11-18"
    quote: "The average delay is 1.98 months, with smaller builders experiencing an even greater delay."
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: claim
    published: 2025
  - id: citb_2025
    title: "CITB Construction Workforce Outlook 2025-29 (as reported by the trade press); search snippet only"
    url: "https://www.citb.co.uk/cwo/reports/cwo_explained.pdf"
    accessed: "2026-11-18"
    quote: "CITB projects about 47,860 extra workers a year over 2025–2029, which totals about 239,300 over five years. That yearly figure is equivalent to 1.8% of the 2024 workforce."
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: forecast
    published: 2025
  - id: abc_2025
    title: "Associated Builders and Contractors (January 2025), Construction Industry Must Attract 439,000 Workers in 2025 (as reported by Construction Executive); search snippet only"
    url: "https://constructionexec.com/article/construction-industry-must-attract-439-000-workers-in-2025"
    accessed: "2026-11-18"
    quote: "construction industry needs to attract an estimated 439,000 net new workers this year"
    saved_copy: ""
    sha256: ""
    strength: 3
    kind: claim
    published: 2025
