Construction with far less labour and material per building https://world.abundancemachines.si/guide/idea-construction-efficient.html Building methods (factory-made components, automated site work and design that puts material only where loads need it) that build any structure with half the construction labour and 30% less cement and steel per unit, available from 2028, so that a structure costing $1.00 to build today costs about $0.80 (2026 int$ per int$ of construction, C13, at today's methods and prices). Result Measure | Value | Share of the gap filled, median across the draws | 0.48% | 80% range | 0.0% to 4.1% | Dollars a year in 2035 (median) | $0.8T | Growth points a year (median) | 0.03 | Median economy, the entry as written | 1.1%: $1.7T tier 1, $0B tier 2 | What people buy (path a), above on course | $1.7T | What inputs allow (path b), above on course | $38.8T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 57.6%; Construction trades in 25.2%; Physical machine labour (robots) in 17.0%; Capital stock in 0.20% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 11.4% | Price against the next-best option | 0.8 against 1 (2026 int$ per int$ of construction (C13) at today's methods and prices) | Value to people beyond measured GDP (not added) | $23B | Possible extra from unsourced knock-ons (not added) | $1B | Starting numbers both ways (A2): stage1-v5 / replaced | 1.1% / 1.1% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (12 of 15 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | construction_efficient d1: cost on C13 ($ of construction (C13) a year, at today's methods and prices) | 69,696,885,958,744 | 70,730,856,188,661 | 1 | 0.8 | $1.7T | b | construction_efficient ch1: recipe K17 C13 | | | | | | b | construction_efficient ch2: recipe K18 C13 | | | | | | b | construction_efficient ch3: recipe LAB C13 | | | | | | b | construction_efficient ch4: recipe K09 C13 | | | | | | b | construction_efficient ch5: recipe K10 C13 | | | | | | b | construction_efficient ch6: supply K21 | | | | | | result | path (a) on course + gains | | | | | $291.9T | result | path (b) most output before K04 passes its record-pace supply | | | | | $329.0T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $1.7T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 7.5% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 5.5% | 0.29% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | next_best.price | E | 0.0% | 2.5% | [E] from sourced inputs. A second, independent measure of today's price of the next-best option would confirm it. | For the profit-machine: gross value added in 2035 $2.4T; price against the next-best option 80.0%; capital per dollar of output 0.7. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 1 | 0.0% (0.0% to 1.3%) | buyers | Physical machine labour (robots) | no | 0.8 | 0.48% (0.0% to 4.1%) | buyers | Physical machine labour (robots) | no | 0.6 | 1.3% (0.0% to 7.3%) | buyers | Physical machine labour (robots) | no | 0.4 | 2.1% (0.0% to 10.6%) | buyers | Physical machine labour (robots) | yes | 0.25 | 2.7% (0.0% to 13.4%) | buyers | Physical machine labour (robots) | yes | 0.15 | 3.1% (0.0% to 15.1%) | buyers | Physical machine labour (robots) | yes | 0.1 | 3.3% (0.0% to 15.8%) | buyers | Physical machine labour (robots) | yes | 0.05 | 3.6% (0.0% to 16.6%) | buyers | Physical machine labour (robots) | yes | 0.02 | 3.7% (0.0% to 16.9%) | buyers | Physical machine labour (robots) | yes | 0.01 | 3.7% (0.0% to 17.1%) | buyers | Physical machine labour (robots) | yes | 0.001 | 3.8% (0.0% to 17.3%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # construction_efficient: comparison with published estimates **Machine (world, 2035, price 0.80 of today's cost):** median across draws $768B a year, which is 0.26% of on-course world GDP and 0.03 growth points (80% range $0-6.6T). With the entry as written it is $1.68T (0.58%). **What it is made of:** the 20% saving on the 11.4% of construction using the method in 2035 ($1.58T), plus $97B of extra building. The labour and material cuts act only on path (b), which does not bind. At full uptake (80% of construction) the same price would give about $12T, 4% of world GDP. **Sources:** all figures are from search snippets only: unsaved, strength 3 at best. | Estimate (strongest first) | Their figure | Machine's same measure | Machine / it | |---|---|---|---| | Lule\xe5 University study, Sweden (new) | industrialised housebuilding ~19% cheaper, labour productivity +10% | price 0.80; labour per unit halved | 1.0x on price; labour cut 5x theirs | | Syverson (BuiltWorlds, 2023; title only) | US loses $2.8T a year, ~10% of GDP, to construction's lag since 1970 | 0.58% (as written), 0.26% (median) | 0.06x / 0.03x | | McKinsey Global Institute 2017 | catch-up adds $1.6T a year, ~2% of world GDP (no date) | $5.8T at 2035 scale | 0.29x as written, 0.13x median; ~2x at full uptake | | BCG for WEF 2016 (new) | digitalisation saves 13-21% of non-residential costs, $0.7-1.2T a year (~0.9-1.6% of GDP) | $2.7-4.6T at 2035 scale | 0.37-0.63x as written; 0.17-0.28x median | | McKinsey 2019, modular | costs up to 20% lower; up to $22bn a year saved, US and Europe, 2030 | price 0.80; world saving $1.58T | 1.0x on price; ~70x on dollars | | Bain (new) | up to 20% lower labour and material cost; on-site labour up to 30% lower | price 0.80; labour -50% | 1.0x; 1.7x | ## Gaps over 2x - **MGI and BCG (machine lower):** the gap is spread. Both are undated full potentials; the machine has 11.4% uptake in 2035 (from 2028, 11 years from 10% to 90%). At full uptake the machine is about 2x MGI, which is scope: the model's built-structures layer (PPP, 24% of world output) is larger than MGI's market-dollar spending (about $10T). - **Syverson (17-38x higher):** a 50-year counterfactual of compounding productivity growth, not a one-off 20% cut taken up by a ninth of buyers. - **McKinsey's $22bn (~70x lower):** scope. It covers modular buildings in two regions (a $130bn market); the entry covers all structures worldwide. - **Lule\xe5's labour figure:** the entry's halving of labour is far beyond the one measured case (+10% productivity). It does not move this result, but would if construction trades bound first. ## Which I trust more **The price:** the published figures, which support it: four independent sources put mature industrialised building at about 20% cheaper. **The 2035 dollars:** the machine, since the published dollar figures are undated potentials. Its trust is still low (12 of 15 key numbers assumed), and halving or doubling the spread pace moves the result between 5.5% and 0.3% of the gap. **Labour per unit:** the measured Swedish case; the entry's 50% cut is an upper bound. Sources Source | Strength | Saved copy | OECD Inter-Country Input-Output tables, 2023 edition, 2019, world construction (ISIC F) co (https://stats.oecd.org/wbos/fileview2.aspx?IDFile=d1ab2315-298c-4e93-9a81-c6f2273139fe) | 1 | yes | OECD ICIO 2023 edition, 2019, world construction: output row and the row of construction's (https://stats.oecd.org/wbos/fileview2.aspx?IDFile=d1ab2315-298c-4e93-9a81-c6f2273139fe) | 1 | yes | OECD ICIO 2023 edition, 2019, world construction's purchases of other non-metallic mineral (https://stats.oecd.org/wbos/fileview2.aspx?IDFile=d1ab2315-298c-4e93-9a81-c6f2273139fe) | 1 | yes | WIOD Socio Economic Accounts, November 2016 release: construction (F) rows of 43 countries (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD SEA 2016: nominal capital stock (K) and gross output (GO) of construction (F) and of (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD SEA 2016: China, construction, persons engaged (thousands), 2000-2014 (2009: 56358.08 (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD SEA 2016: China, construction, gross output volume index (2010 = 100), 2000-2014 (200 (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | Albouy, Ehrlich and Liu (2016), Housing Demand, Cost-of-Living Inequality, and the Afforda (https://www.nber.org/system/files/working_papers/w22816/w22816.pdf) | 2 | yes | Albouy, Ehrlich and Liu (2016), NBER w22816: the rise in the relative price of shelter sin (https://www.nber.org/system/files/working_papers/w22816/w22816.pdf) | 2 | yes | UNEP GlobalABC, Global Status Report for Buildings and Construction 2025-2026 (citing IEA (https://globalabc.org/resources/publications/global-status-report-buildings-and-construction-2025-2026) | 1 | yes | Moynihan and Allwood (2014), Utilization of structural steel in buildings, Proceedings of (https://pmc.ncbi.nlm.nih.gov/articles/PMC4075790) | 1 | search only | NAHB Eye on Housing, Manufactured Homes: An Alternative Means of Housing Supply (2025), re (https://eyeonhousing.org/2025/04/manufactured-homes-an-alternative-means-of-housing-supply/) | 3 | search only | China Daily (22 March 2021), reporting Ministry of Housing and Urban-Rural Development fig (https://www.chinadaily.com.cn/a/202103/22/WS6057f6a2a31024ad0bab0a1f.html) | 3 | search only | Global Construction Review, Why Sweden beats the world (citing Steinhardt and Manley, Quee (https://www.globalconstructionreview.com/why-sweden-beats-world) | 3 | search only | Building and Construction Authority, Singapore: Prefabricated Prefinished Volumetric Const (https://www1.bca.gov.sg/buildsg/productivity/design-for-manufacturing-and-assembly-dfma/prefabricated-prefinished-volumetric-construction-ppvc) | 3 | search only | CIN Magazine (22 October 2025), reporting a Steel Construction Institute study of a four-s (https://cinmagazine.co.uk/?p=4787) | 3 | search only | Goolsbee and Syverson (2023), The Strange and Awful Path of Productivity in the U.S. Const (https://www.nber.org/papers/w30845) | 1 | search only | International Labour Organization, Construction: a hazardous work; search snippet only (https://www.ilo.org/resource/construction-hazardous-work) | 1 | search only | OECD (2025), Mortality Risk Valuation in Policy Assessment; search summary only (https://www.oecd.org/en/publications/mortality-risk-valuation-in-policy-assessment_76ca89a2-en) | 2 | search only | Resources for the Future, Report 26-11 (EPA 2023 social cost of carbon in 2026 dollars); s (https://media.rff.org/documents/Report_26-11_Final.pdf) | 2 | search only | McKinsey Global Institute (2017), Reinventing construction: a route to higher productivity (https://www.mckinsey.com/capabilities/operations/our-insights/reinventing-construction-through-a-productivity-revolution) | 3 | search only | McKinsey (2019), Modular construction: from projects to products (consultancy: strength 3) (https://www.mckinsey.com/industries/real-estate/our-insights/modular-construction-from-projects-to-products) | 3 | search only | BuiltWorlds (2023), Construction's poor productivity costs U.S. economy $2.8 trillion per (https://builtworlds.com/news/constructions-poor-productivity-costs-u-s-economy-2-8-trillion-per-year-according-university-chicago-economist/) | 3 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/construction_efficient.yaml (https://world.abundancemachines.si/data/v7/capabilities/construction_efficient.yaml)