Tradespeople trained far faster https://world.abundancemachines.si/guide/idea-trades-training-fast.html Training that brings a new entrant to a qualified construction trade (bricklayer, carpenter, electrician, plumber and the other craft trades, ISCO 7) in about six months of intensive full-time training instead of about three years of apprenticeship, available from 2028, at about $17,900 per tradesperson trained against about $33,300 today (2026 int$ of resources per tradesperson trained: the output the trainee does not produce while learning, compared with a qualified tradesperson, plus instruction). Result Measure | Value | Share of the gap filled, median across the draws | 0.01% | 80% range | 0.0% to 0.06% | Dollars a year in 2035 (median) | $9B | Growth points a year (median) | 0.00 | Median economy, the entry as written | 0.01%: $20B tier 1, $0B tier 2 | What people buy (path a), above on course | $20B | What inputs allow (path b), above on course | $37.2T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 52.7%; Construction trades in 26.9%; Physical machine labour (robots) in 20.4% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 14.4% | Price against the next-best option | 17,928 against 33,345 (2026 int$ of resources per tradesperson trained (output forgone while learning, against a qualified tradesperson, plus instruction)) | Value to people beyond measured GDP (not added) | $0B | Possible extra from unsourced knock-ons (not added) | $37B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.01% / 0.01% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (11 of 11 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | trades_training_fast d1: cost on new:trades_training (tradespeople (construction trades, ISCO 7) trained a year) | 8,415,848 | 8,654,271 | 33,345 | 17,928 | $20B | b | trades_training_fast ch1: supply K17 | | | | | | b | trades_training_fast ch2: supply K18 | | | | | | result | path (a) on course + gains | | | | | $290.2T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.4T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $20B | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 0.07% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 0.06% | 0.00% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | next_best.price | A | 0.0% | 0.04% | [A] now. Settled by a study of today's price of the next-best option. | For the profit-machine: gross value added in 2035 $16B; price against the next-best option 53.8%; capital per dollar of output 1. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 33,345 | 0.0% (0.0% to 0.02%) | buyers | Physical machine labour (robots) | no | 26,676 | 0.00% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | yes | 20,007 | 0.00% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | yes | 17,928 | 0.01% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | 13,338 | 0.01% (0.0% to 0.07%) | buyers | Physical machine labour (robots) | yes | 8,336 | 0.01% (0.0% to 0.08%) | buyers | Physical machine labour (robots) | yes | 5,002 | 0.02% (0.0% to 0.10%) | buyers | Physical machine labour (robots) | yes | 3,334 | 0.02% (0.0% to 0.10%) | buyers | Physical machine labour (robots) | yes | 1,667 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | 667 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | 333 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | 33.3 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # trades_training_fast: comparison with published estimates **Machine (2035, 2026 int$, price 17,928 against 33,345):** $20B measured GDP (median economy; 0.007% of world output; draws' median $9B): $18.6B training resources saved on 1.2M tradespeople, $1.6B from 0.24M extra trainees. Freed capital from delayed buildings: $37B (not added). Spread 14.4%. All estimates were read only in search snippets: strength 3 at best. None measures faster training itself. Ratio = machine / estimate. | Estimate (strongest first) | Their number | Machine's scale, 2035 | Machine | Ratio | |---|---|---|---|---| | Reed et al. 2012, Mathematica for US DOL, non-experimental (new) | apprenticeship's social net benefit >$49,000 per apprentice | \u2248 $22,700 at model pay (US trades pay 2.16x, ILO saved copy) | $7,700 per extra trainee | 0.34 | | NAHB-HBI 2025, US single-family | $10.8bn a year: delay $2.66bn, 19,000 homes lost $8.14bn; 2.5% of $433bn building (Census, new) | x 25% of world construction $69.7T [A] x 0.144: delay $15bn, lost output $47bn | delay $37B (not added); lost output none | 2.4; 0 | | Bring Back the Trades / F.W. Webb, advocacy (new) | US trades gap costs $326bn of GDP a year (\u22481.1% [A]) | 1.1% x $290T x 0.144 \u2248 $460bn | $20B (+$37B) | 0.04 (0.12) | | CITB 2025-29; ABC 2025 | need 1.8% (UK) and 3.5% (US, against ILO's 12.6M) of workers a year | sizes of need | on-course growth 2.3% a year; method adds 0.27% of workers by 2035 | | ## Where they differ by more than 2x - **Reed (3x):** cost mode values an extra trainee at half the price cut (training worth its cost at the margin); Reed finds it pays far more. At Reed's value the total rises only about $4B. - **NAHB delay (2.4x):** the machine's knock-on takes NAHB's own 1.98 months, so it is not an independent check. It values freed capital at about 9% a year; NAHB's carrying cost implies 3.7%. - **NAHB lost homes:** a channel the machine does not have. World construction labour does not bind in the median economy (buyers limit, $37T of room), and shortages of particular trades in one market have no model number. If such local shortages are common, the machine misses up to about $47B at the 2035 spread. - **Bring Back the Trades (25x):** it counts unfilled jobs at full output, as if new tradespeople were extra people rather than moved from other work. It covers all trades and is advocacy. - A 2012 English reform lengthening apprenticeships cut starts but raised earnings (Economics of Education Review 2019, new, no number): shorter training may lower skill, not mapped. ## Which I trust more No estimate covers the machine's main channel (three years of learning cut to six months), so $20B rests on its assumptions: all 11 key numbers assumed; the elasticity covers only the top tenth of the price range but drives only $1.6B. Where trade shortages hold up building, I trust NAHB's evidence that the machine misses a channel. With NAHB's delay and lost-output channels the gain could reach about four times $20B ($82B), under 0.03% of world output. I give the advocacy figure no weight. Sources Source | Strength | Saved copy | ILOSTAT, Employment by sex, economic activity and occupation (thousands), DF_EMP_TEMP_ECO_ (https://sdmx.ilo.org/rest/data/ILO,DF_EMP_TEMP_ECO_OCU_NB,1.0/{country}.A....?startPeriod=2015) | 1 | yes | ILOSTAT, Mean nominal monthly earnings of employees by sex and occupation, DF_EAR_EMTA_SEX (https://sdmx.ilo.org/rest/data/ILO,DF_EAR_EMTA_SEX_OCU_CUR_NB,1.0/{country}.A..SEX_T..?startPeriod=2015) | 1 | yes | Denning (2017), College on the Cheap: Consequences of Community College Tuition Reductions (https://www.aeaweb.org/research/texas-tuition-cuts-preview-free-community-college) | 1 | search only | Aepli, Wenzelmann, Wolter et al. (2024), The impact of hiring costs for skilled workers on (https://docs.iza.org/dp16919.pdf) | 2 | search only | Schoenfeld et al., Training in Germany: an investment to counter the skilled worker shorta (https://bibb.de/dienst/publikationen/de/download/16745) | 1 | search only | Delaware Department of Labor, apprenticeship page (US registered apprenticeship standards) (https://labor.delaware.gov/tag/veterans/?p=486) | 1 | search only | EU capacity4dev / GIZ guidance note on informal apprenticeship; search snippet only (an IL (https://capacity4dev.europa.eu/media/30337/download/63faad92-7dc1-4edc-a51f-9d87e5b8755a_en) | 3 | search only | US Bureau of Labor Statistics (1945), Employment Opportunities for Welders, Bulletin 844 ( (https://fraser.stlouisfed.org/files/docs/publications/bls/bls_0844_1945.pdf) | 1 | search only | NAHB press release (June 2025), New Study Reveals Significant Economic Impact of Housing I (https://www.nahb.org/news-and-economics/press-releases/2025/06/new-study-reveals-significant-economic-impact-of-housing-industry-labor-shortage) | 3 | search only | CITB Construction Workforce Outlook 2025-29 (as reported by the trade press); search snipp (https://www.citb.co.uk/cwo/reports/cwo_explained.pdf) | 3 | search only | Associated Builders and Contractors (January 2025), Construction Industry Must Attract 439 (https://constructionexec.com/article/construction-industry-must-attract-439-000-workers-in-2025) | 3 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/trades_training_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/trades_training_fast.yaml)