Pitch an idea https://world.abundancemachines.si/guide/pitch.html A pitch is a few sentences. An AI researches it into an entry; plain code does the arithmetic, so the same entry always gives the same result. Full: give an AI agent with web search the research instructions below and your pitch. It restates the pitch with a price and unit, researches every number with its source, writes the entry using only the model's IDs, and compares the machine's result with published estimates. Quick: give any AI the short instructions. Its numbers are marked [A] and the page shows them as rough, with the measured error band of quick entries. Research instructions (full path)# Research agent instructions: turn a pitch into a capability entry You are a research agent with web search. Someone has pitched an idea: a product, a discovery, a service or a rule change. Your job is to turn it into one capability entry (a YAML file) that the economic machine can run. You do the thinking and the research; plain code does the arithmetic. You never compute the economic result yourself, and you never type a dollar gain: you only describe what the idea changes in the model, with sources. The machine asks: if this capability existed at a given price by 2035, how much of the gap between where the world economy is heading ($290T on course in 2035) and twice today's output ($448.5T) would it fill, which input would run short next, and how far can that answer be trusted? It values capabilities as if they existed. It does not claim they can be built; that is checked later. Read these first (paths from the repository root): - `stage1-v7/pitch/model_ids.md`: every layer and input ID you may use, with its 2026, on-course 2035 and record-pace 2035 numbers and units, the labour model, and what one unit of an input earns. - `stage1-v7/capabilities/_template.yaml`: the entry format, field by field. - `stage1-v7/README.md`: how an entry is validated and run. - The five worked examples at the end of this file (once written). ## The five steps 1. **Restate the pitch** as one sentence with a price and its unit, for example "general-purpose robots that do any physical task a person can, at $5 per hour of work, sold from 2028". If the pitch has no price, no unit or no date and you cannot infer one from the pitch itself, ask the user for it instead of guessing. (In a batch run with no user, use the starter's own wording and mark the price [A].) 2. **Search** reports, studies and data for every field of the entry: - how much more people buy as the price falls (the price elasticity of demand), and over what price range the evidence covers; - comparable past cases (a product that fell in price, a rule that was changed) and what happened; - what the capability needs (energy, materials, workers, capital, land per unit); - how fast it could spread (adoption curves of similar products); - published estimates of its economic effect, with their scale (world or one country, years). Prefer, in this order: after-the-fact studies and official statistics (strength 1); peer-reviewed forecasts or models (strength 2); consultancy, press and company claims (strength 3, recorded but never the source of an effect size). 3. **Write the entry** using only the model's IDs. Every number has a value, unit, label, sources and, for an estimate, how it was made. Every source has its URL, access date, the exact sentence or table cell, a saved text copy and its strength. A number you cannot source is [A], and you say why you chose it. 4. **Add knock-on effects** the evidence points to, each as a model change with its mechanism and source (for example: a cure adds healthy working years, so the human workforce K18 rises by a stated number of workers). Unsourced knock-ons are allowed but are [A]: the machine shows them beside the result as "possible extra" and never adds them. 5. **List what you could not map** to a model number (`not_mapped`), in plain words. Refuse a pitch that breaks physics (perpetual motion, faster-than-light travel, more energy out than in, a price below the energy it must use at any plausible energy price is not a physics break but must be flagged in `performance`). Set `refused: true` and say which law it breaks and why. ## Labels and sources (the rules the validator enforces) - **[S] sourced**: you read the number in a saved copy of the source and the exact quote is in that copy. - **[E] estimated**: computed from sourced numbers; write the arithmetic in `derivation`. - **[A] assumed**: anything else. A number you only saw in a search-result snippet is [A]. A number from a strength-3 source used as the size of an effect is [A] (you may still record it, with its source). - **Saved copies.** Save a text copy of every page you take a number from in `stage1-v7/sources/.txt` and put its SHA-256 checksum (`sha256sum`) in the entry. Ways to get one, in order: 1. A copy already in the repository: many sources were saved by earlier stages under `stage1-v1/`, `stage1-v2/` and `stage1-v3/` (look for folders named `raw` with a `url.txt`; text copies are `.txt`, `page.html` or extracted PDF text). Copy the text file into `stage1-v7/sources/` and record the original path in `title`. 2. The fetch tool (WebFetch), asked to return the page's full text verbatim. Save what it returns. If it saves a PDF for you, extract its text with `pdftotext` and save that. 3. If neither works (in this environment the fetch tool may be unable to reach hosts, and downloading with curl, wget or scripts is not permitted), leave `saved_copy` empty. The number is then [A] until `code/fetch_sources.py` saves the page and `code/validate.py` finds the quote in it. Do not try to get round a blocked download. - The validator reopens every saved copy and looks for your quote (ignoring spaces, case and punctuation). A number whose quote is not found is downgraded to [A] with a warning. So quote exactly. - **Strength** of each source: 1 after-the-fact study (peer-reviewed) or official statistics; 2 peer-reviewed forecast or model; 3 consultancy, press or company claim. - Money: 2026 international dollars (PPP). Convert past prices with the US consumer price index (FRED CPIAUCSL is in `stage1-v2/agent6_cheap_inputs/raw/fred_CPIAUCSL`). For goods traded worldwide, market US dollars are used as international dollars ([E], say so); for local services (wages, care) convert with a PPP factor and say which. ## Demand mechanisms (path a: what people buy) Each mechanism is a demand curve for one good: a layer's product, an input, or a new product. `Q(p) = min(limit, Q0 x (p / P0) ^ elasticity)`, where Q0 is the units bought on course in 2035 at the old price P0. - **P0** is the old price. For a new product with no old price, P0 is the **next-best option's price** (what buyers use instead today), in the same unit as the capability's price. - **P1** is the capability's price (`use: price`). The runs sweep it from P0 down to near zero. - **Q0** comes from the model where you can (`model: "oc:"` is the layer's on-course 2035 output in bn, times a sourced `factor` converting it into units; `model: "O:"` is an input's on-course 2035 supply), otherwise a sourced number of units. - **elasticity** is the price elasticity of demand (negative), with `evidence_price_range`: the lowest and highest price the evidence covers, in the price unit. Outside that range the machine keeps the elasticity but stops at the `limit` and marks the result as beyond the evidence; the limit is a physical bound (number of people, hours in a day, physical need) and is usually [A]. - **mode**, the part that most often goes wrong: - `cost`: the capability makes each unit with fewer resources than the next-best (a cheaper recipe, a cheap cure that replaces an expensive treatment, cheaper electricity from cheaper plants). Gain = the saving on units bought anyway plus the extra units bought, valued at the average of the old and new price net of their cost. - `supply_net`: the capability adds units of an input that cost resources to make (robots, AI agents, more grid capacity). The units already supplied are not cheaper to make, so their lower price is a transfer, not a gain; the gain is what the extra units are worth (the average of the old and new price) minus their own cost P1. Give `capacity_2035`: how many units can exist by 2035, from production ramps of similar products. - `supply_gross`: units of an input that use nothing the economy would otherwise use (cured people back at work). Gain = what the extra units are worth. - Spread (`available_year`, `years_10_to_90`, `max_share`) sets the share of the market that has the capability in 2035, from adoption curves of comparable products (with sources). ## Model changes (path b: what every input allows) The machine raises every layer from today toward its 2035 target in equal steps and stops where the first input's need passes its record-pace supply. Your changes alter that, only through these kinds: - `recipe`: input per unit of a layer's output, as a multiplier. `input: LAB` is the labour model's work per unit (it moves robots K04, AI agents K03, AI compute K05, licensing K16 and machine electricity together). Scaled by the 2035 spread unless `scale_with: none`. - `supply`: units added to an input's 2035 supply (`add`, in the input's own unit), or extra growth a year (`growth_add`), or `from_demand: ` to add exactly the extra units a supply mechanism buys (use this for robots and AI agents, so paths a and b agree). - `cap`: a supply limit removed (for example K16 licensing for machine work). - `task_split`: the share of cognitive tasks AI agents take first (0 is v4's base split; 1 is v4's scenario S1, where people move to physical work). - `own_output`: a new product's output added to its layer (the machine computes it from the demand mechanism), with its own input needs per unit (for example propellant per Moon trip, as fuels K02). Rules: - An effect is never a dollar amount. If you find "adds $2 trillion to GDP", it goes in `published_estimates`. - Do not count one mechanism twice: one entry may not change the same model number by the same mechanism twice (for example both a `recipe` cut in labour for C13 and a `supply` of construction workers K17 for the same saving). A supply mechanism for robots plus `supply from_demand` on K04 is one mechanism carried to both paths, which is correct. - Work on K11-K15 (not inputs) must be expressed as a change to a real model number (see model_ids.md). - Use the layer the spending is in: a cancer cure is C05, a Moon trip is C06 or C08, office work is spread over the layers that employ office workers (use the labour model: `task_split`, `supply` of K03). - Do not make the result larger than the layers it touches: the validator rejects it. ## Rules that keep two runs alike (added after the consistency check) Two agents given the same pitch must write entries that give the same answer within 2x. The first consistency check (`pitch/consistency.csv`) found five of the ten starters 2x to 66x apart, almost all from numbers marked [A]: guessed elasticities, guessed spreads, demand curves stretched far below any evidence, and different framings of the same pitch. These rules fix how such numbers are chosen. They do not make the numbers better sourced; they make an unsourced number the same in every run, and its range then carries the uncertainty. Where a rule gives a default, label the number [A], write "research.md default" in its `derivation`, and give the stated alternatives. A sourced number always beats a default. 1. **Price unit.** Quote the price in the unit buyers pay for the next-best option today: an hour of work, a trip, a MWh, a treatment, a permit. If the next-best is quoted per year, convert to that unit and say how. 2. **Elasticity**, in this order: (a) one measured for this good or service in a study that covers part of the price sweep ([S] or [E]); (b) one measured for the closest substitute (say which and why); (c) otherwise the default: **-0.5** for things firms buy (energy, materials, equipment, hours of work by people or machines), **-1.0** for goods and services households buy; alternatives at half and twice the default. Do not choose any other unsourced value. 3. **Far below the evidence.** If the capability's price is more than 10 times below the lowest price the elasticity evidence covers (typical for a new product many times cheaper than today's option), do not stretch the curve. Give a second anchor: the units bought a year, in 2035, of the closest thing that is sold today at about the capability's price (for a $100 Moon trip: long-distance leisure trips at that price). Set the `limit` to that number and the elasticity from the two anchors, `ln(Q1 / Q0) / ln(P1 / P0)`, labelled [E] if both anchors are sourced and [A] otherwise, with the arithmetic in `derivation`. 4. **Spread.** `years_10_to_90` comes from the measured adoption curve of the closest past product (with its source). If you find none, use the default for its class: software and services sold online **8** years; consumer devices **12**; medicines once approved **10**; vehicles, machines and equipment firms buy **20**; buildings, energy supply and grids **25**; a rule change **5** years from the rule. `max_share` is 1.0 unless a source shows that part of the market cannot use it. `available_year` is the pitch's year; if it gives none, 2028 for something that exists as a working prototype today and 2030 otherwise. 5. **More of a physical thing in short supply** (more factories, more equipment, more machines). The good is the thing in short supply, in its own unit; the mode is `supply_net`; P0 is today's price of that thing; P1 its price once the shortage ends; `capacity_2035` comes from the ramp of factories in a comparable past build-out. The cost of waiting is a second, `cost` mechanism on a new good only where a source measures that cost, with elasticity 0 (it adds no units of its own). 6. **The capability's own needs.** Enter what its units need to make and run (energy, materials, capital) only where a source gives the need per unit: for a new product, as `needs` on its `own_output` change; for extra units of an input (robots, AI agents, grid equipment), as a negative `supply` add on the input they use up, with the per-unit need and the number of units in `derivation`. Needs you cannot source go in `not_mapped`. 7. **Faster rules** (approvals, permits, connections, licences). The good is the thing whose making gets cheaper (an approved medicine, a building, a connected power plant), in its own unit or per dollar of it; the mode is `cost`; the price is its full cost per unit including the cost of waiting (capital tied up x what capital earns x the time), so P0 uses today's wait and P1 the shorter one. Do not price the wait alone as a separate product. ## Output - `stage1-v7/capabilities/.yaml` (or the folder you are told), following `_template.yaml`. - `stage1-v7/sources/.txt` for every saved copy, and `stage1-v7/sources/pending.csv` rows (`source_id,url,why`) for pages you could not save. - `stage1-v7/pitch/logs/.md`: your research log: searches made, what each found, choices made and why, what you could not map. Write it early and update it as you go. - Run `python3 -B -I stage1-v7/code/validate.py stage1-v7/capabilities/.yaml` and fix every error before you finish. ## After the run: compare with published estimates When the machine has run your entry, you will be shown its result (gap filled, dollars, what limits it, the input that binds next). Then write, in the entry's log and in `stage1-v7/pitch/comparisons/.md`: - each published estimate you found, strongest sources first, put on the same scale as the result where possible (same year, world or the study's own scale, the same price); - where the machine and an estimate differ by more than 2x: why (different price, spread, scope, a bottleneck the estimate ignores, double counting in the estimate, a channel the machine does not have); - which you trust more and why. ## Worked examples Five starters, as their research agents wrote them (the full entries are in `stage1-v7/capabilities/`). Each shows the pitch, the main sources, the core of the entry (its demand mechanisms and model changes) and the agent's comparison with published estimates after the machine ran it. They show the three modes (cost, supply_net and a new product), a rule change written as real model numbers, and a price flagged as below its energy cost. They were written before the section "Rules that keep two runs alike" was added: where an example differs from those rules, follow the rules. ### Example: Much faster building permits and grid connections **Pitch.** "Much faster building permits and grid connections (unblocked)" **Restated.** A permitting and grid-connection process that grants building permits in about 1 month and grid connections (and other major infrastructure approvals) in about 12 months, adopted by governments from 2027, so the cost of waiting falls from about 6.8 to about 1.6 cents per dollar of construction (2026 int$ of waiting cost per $ of construction, C13). **Main sources** (strength; saved copy or search only): - LBNL, Queued Up: 2026 Edition (Rand et al., June 2026); saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - IEA, World Energy Outlook 2025; saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt (strength 1; saved) **Entry (core):** ```yaml price: value: 0.015761 unit: 2026 int$ of waiting cost per $ of construction (C13) label: A sources: - lbnl_small12 - soltas_sf derivation: 'Batch run, no user to ask: the price is assumed. Wait with the capability T1 = 0.9 x 1 month (building permits) + 0.1 x 12 months (grid connections and other...' next_best: name: 'Today''s permitting and grid-connection process: about 9 months of waiting averaged over world construction (about 5 months for building permits, about 45 months for grid connections and other major infrastructure approvals)' price: value: 0.067548 unit: 2026 int$ of waiting cost per $ of construction (C13) label: A sources: - lbnl_ia45 - db_us2020 - db2012_world - soltas_sf - iea_invest derivation: T0 = (1 - s_inf) x T_build + s_inf x T_infra = 0.9 x 5 + 0.1 x 45 = 9.0 months (derivation_inputs), times m_month = 0.0075053 = 0.067548. A, because T_build ... demand: - id: d1 good: new:permit_wait layer: C13 mode: cost quantity_unit: $ of construction (C13) a year, at today's construction prices P0: use: next_best P1: use: price Q0: model: oc:C13 factor: value: 1000000000.0 unit: $ of construction per bn of C13 output label: E sources: [] derivation: 'unit conversion: 1 bn = 1e9 $' elasticity: value: -0.0348 unit: '% change in construction bought per 1% change in the waiting cost' label: A sources: - albouy_ts derivation: Buyers respond to the full price of a structure, 1 + c (construction cost plus waiting cost). The elasticity with respect to the waiting cost c is the price ... evidence_price_range: - 0.0 - 0.067548 limit: value: 104600000000000.0 unit: $ of construction (C13) a year label: E sources: [] derivation: 'stage1-v5/not_inputs.csv: K12 record-pace supply 104,600 bn of C13 output (the layer''s own record output) x 1e9.' description: 'Construction cannot exceed the C13 layer''s record-pace output (stage1-v5). The evidence covers the whole sweep: removing the waiting cost lowers the full pri...' changes: - id: ch1 kind: supply input: K01 add: value: 3042 unit: TWh per year (gross generation) label: E sources: - iea_heldup - irena_solar - irena_wind - irena_adds derivation: 'The held-up projects connected: 1,700 GW (IEA, S) x 0.2043 (average capacity factor = 0.7982 x 0.17 + 0.2018 x 0.34, IRENA 2024 solar and onshore wind, mix o...' scale_with: adoption mechanism: 'Faster grid connections let generation that is built but waiting (or ready to build) feed the grid, so electricity supply K01 rises. Path (b) only: these units cost resources to make, so at today''s price they add nothing to path (a) (as research.md''s supply_net rule); stage1-v5 finds electricity does not bind before the target, so this change does not move the result on its own.' ``` **Comparison with published estimates** (after the run): #### permits_grid_fast: comparison with published estimates **Machine (world, 2035, waiting cost 1.6 instead of 6.8 cents per $ of construction):** median across draws $291B a year, 0.10% of world GDP, 0.01 growth points (80% range $0-1.8T). As written: $527B (0.18%). **What it is made of:** the waiting saving on the 14.3% of construction reformed by 2035, about half from building permits (5 to 1 month) and half from grid and major-infrastructure approvals (45 to 12 months). At full uptake (90%) it would be $3.2T (1.1%): infrastructure $1.55T (0.54%), power projects alone about $0.8T. **Sources:** all figures are from search snippets only: unsaved, strength 3 at best. | Estimate (strongest first) | Their figure | Machine's same measure | Machine / it | |---|---|---|---| | CEA, Oct 2026 | US long-run GDP +0.28-0.56% if reviews fall from 4.2 to 2 years; +0.41-0.83% at 1 year | infrastructure part: 0.54% at full uptake; ~0.085% in 2035 | 0.65-1.3x; 0.1-0.2x in 2035 | | Hsieh-Moretti 2019 | US GDP +3.7% (2009) from looser land-use rules in three metros | 1.1% at full uptake; 0.18% in 2035 | 0.3x; 0.05x | | RFF, Power Delayed | US net cost of power-project delays $47bn (scenario total) | power part ~$0.8T a year (world, full uptake); a US tenth ~$80bn | >1.7x (theirs is a total) | | C2ES-cited study (new) | US transmission reform: $125bn of grid costs saved 2026-2040 (~$8bn a year) | as above | \u226510x | | Grid Strategies and Brattle (new) | fixing interconnection: ~$100bn of benefits; PJM delay costs up to $7bn in a year | as above | ~11x (PJM, yearly) | | McKinsey | $1.7-2.4T of cumulative US GDP forgone in federal permitting | a stock with no period: not convertible | - | ##### Gaps over 2x - **CEA in 2035:** spread. The CEA is long-run full adoption; the machine reaches 14% of construction by 2035 (12 years from 10% to 90% [A]). At full uptake its infrastructure part is inside the CEA's range for a similar wait cut (38 months against 33). - **Hsieh-Moretti:** a channel the machine lacks: how much may be built where workers are most productive (zoning), not how fast. The model has no geography. - **Grid studies (machine 2-10x or more higher):** a different measure, and likely a machine overstatement. - The studies count electricity-system costs, US or regional, often cumulative. - The machine charges the return on the whole project's value for each month of waiting, though before construction only land, design and finance are tied up (red team RT16), so its grid part is probably too high. - Its extra electricity is not valued (power does not bind). ##### Which I trust more **Major infrastructure:** both, since the CEA and the machine agree for a similar wait cut. **Grid connections:** the electricity-system studies; no study backs the machine's waiting cost for pre-construction queues. **Building permits (half the machine's gain):** no published GDP estimate exists; the machine rests on the practitioner rule of about 1% of cost a month (strength 3). **The 2035 number:** low trust (7 of 10 key numbers assumed); most of its uncertainty is how fast governments adopt the reform, which no estimate addresses. ### Example: AI agents doing most office work **Pitch.** "AI agents doing most office work (new)" **Restated.** AI agents that can do four-fifths of office (cognitive, ISCO 1-4) tasks at the quality of a trained worker, sold from 2028 at $5,000 per worker-year of office work (about $2.35 an hour), against $63,247 a year (about $29.70 an hour) for a human office worker in 2035. **Main sources** (strength; saved copy or search only): - stage1-v7/input_prices.csv, row WAGE_COG (model file built from ILO earnings and employment by occupation, stage1-v2/agent6_cheap_inputs/raw/ilo_ear_ocu and ilo_emp_eco_ocu, and PWT 11.0) (strength 1; saved) - Epoch AI, Data on AI chip sales, timelines_by_chip.csv (copy of stage1-v2/v1/agent4_bottlenecks/raw/epoch_chip_sales/timelines_by_chip.csv) (strength 3; saved) - METR, METR-Horizon-v1.1 benchmark results (copy of stage1-v2/v1/agent1_frontier/raw/metr_th11/benchmark_results_1_1.yaml) (strength 3; saved) - Electric car sales (IEA Global EV Outlook via Our World in Data) (copy of stage1-v2/v1/agent4_bottlenecks/raw/owid_ev_sales/electric-car-sales.csv) (strength 1; saved) - IEA, World Energy Outlook 2025, chapter 1 (copy of stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt) (strength 2; saved) - UN World Population Prospects 2024, population by five-year age group, medium variant: World, 2035 rows (extract of stage1-v2/baseline/raw/un_wpp2024_age5/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) (strength 2; saved) **Entry (core):** ```yaml price: value: 5000 unit: 2026 int$ per worker-year of office (cognitive) work label: A sources: - epoch_chip_sales - dc_cost derivation: 'Chosen [A] (batch run, no user to ask). About 1.7x the hardware-and-power cost of one AI worker-equivalent with the model''s own ratios: 272.36 W of AI chips ...' next_best: name: 'A human office worker (ISCO 1-4 occupations): pay per worker-year of cognitive work, on course in 2035' price: value: 63246.58 unit: 2026 int$ per worker-year of office (cognitive) work label: E sources: - m_prices derivation: 'price:WAGE_COG in stage1-v7/input_prices.csv: on-course 2035 pay per worker (labour share 0.5338 of on-course output / on-course workers) split between cogni...' demand: - id: d1 good: K03 layer: ALL mode: supply_net quantity_unit: worker-years of office (cognitive) work a year P0: use: price:WAGE_COG P1: use: price Q0: value: 998805096 unit: worker-years of office (cognitive) work a year label: E sources: [] derivation: 'All cognitive work bought on course in 2035, by people and machines: the labour model''s work per bn of output (w) x each layer''s cognitive share x on-course ...' elasticity: value: -1.278 unit: '% change in units per 1% change in price' label: A sources: - katz_murphy - card2009 - nordhaus2021 evidence_price_range: - 44272.6 - 82220.6 derivation: With cognitive work combined with all other inputs at an elasticity of substitution sigma and other inputs held, the price elasticity of demand for cognitive... elasticity_alternatives: - value: -0.639 unit: '% change in units per 1% change in price' label: A sources: - nordhaus2021 derivation: 'sigma = 0.5 (cognitive work a complement of physical inputs): -0.5 / (1 - 0.2177).' - value: -2.556 unit: '% change in units per 1% change in price' label: A sources: - card2009 derivation: 'sigma = 2 (Card''s college versus high-school elasticity): -2 / (1 - 0.2177).' limit: value: 8885210184 unit: worker-years of office (cognitive) work a year label: A sources: - un_wpp description: 'Physical bound beyond the evidence: at most one full-time AI office worker for every person alive in 2035 (8,885 million people, UN WPP 2024 medium variant, ...' derivation: 'Sum of the 21 world age groups for 2035 in the saved UN WPP 2024 extract: 8,885,210 thousand people. The rule (one per person) is assumed.' capacity_2035: value: 3513800000 unit: worker-years of office (cognitive) work a year, beyond the on-course supply of K03 label: A sources: - epoch_chip_sales - owid_ev_sales - iea_weo25 derivation: 'AI chip power sold in the four complete quarters Q3-2025 to Q2-2026 (Epoch, saved copy): 1,979.0 + 2,349.2 + 2,669.7 + 3,221.7 = 10,219.6 MW (Q3-2026 is mark...' changes: - id: ch1 kind: supply input: K03 from_demand: d1 units_per_model_unit: value: 1000000 unit: worker-years per million worker-equivalents label: E sources: [] derivation: 'Unit conversion: K03 is counted in million worker-equivalents.' scale_with: none mechanism: The extra AI agents bought in path (a) are added to the supply of machine cognition (K03), on course and at the record pace, so paths (a) and (b) count the same agents (one mechanism carried to both paths). - id: ch2 kind: task_split share: value: 0.8 unit: share of cognitive tasks AI agents take first label: A sources: - eloundou2024 derivation: The pitch says most office work; read as four-fifths of office tasks where the agents are adopted. Eloundou et al. (search snippet) find that with LLM-powere... scale_with: adoption mechanism: Where firms adopt the agents, the agents take office tasks first and the people they free move to physical work, which lowers the need for robots (K04) on the path; the labour model adds the agents' own AI compute (K05) and electricity (K01) needs. ``` **Comparison with published estimates** (after the run): #### ai_office_agents: comparison with published estimates **Machine (world, 2035, $5,000 against $63,247 per worker-year):** median across draws $10.9T a year, which is 3.8% of on-course world GDP ($290.2T) and 0.44 growth points a year (80% range $0-37.1T). With the entry as written it is $39.7T (13.7%). **Scaling:** I apply each percentage to 2035 world GDP, compound growth rates over 2026-2035, and take GDP as TFP / 2/3. Only the IMF figure is saved. The rest come from snippets only: unsaved, strength 3 at best. | Estimate | Their figure | Machine's scale | Machine median / it | |---|---|---|---| | IMF WEO 2026 (saved) | TFP +0.8% in 10 yrs; upside +0.1-0.8 pt/yr | $3.5T; upside $2.6-21.5T | 3.1x | | Acemoglu 2025 | US GDP ~1% in 10 yrs | $3.2T | 3.4x | | OECD 2024 | US labour productivity +0.4-0.9 pt/yr | $10.6-24.4T | 0.45-1.0x | | PWBM 2025 | US GDP +1.5% by 2035 | $4.4T | 2.5x | | Humlum-Vestergaard 2025 (after the fact) | chatbots: 3% time saved, no earnings effect | - | - | | IMF SDN 2024; ILO 2025 | 40% / 25% of jobs exposed | machine automates ~6% of all work | - | | PwC 2025 (new) | world +15% by 2035; 8% low-trust; 1% pessimistic | $43.5T / $23.2T / $2.9T | 0.25x / 0.47x / 3.8x | | Goldman 2023 | world +7% in 10 yrs | $20.3T | 0.54x | | Oxford Economics (new) | +0.6 pt/yr world growth (2030s) | - | 0.7x | | Aghion-Bunel 2024 | +0.8-1.3 pt/yr | $21-36T | 0.3-0.5x | | McKinsey 2023 | +0.1-0.6 pt/yr | $2.6-16T | 0.7-4x | | RAND 2025 (new) | agents add 2.6-3.8 pt/yr, to 2045 | - | ~0.15x | | Epoch GATE 2025 | 12%/yr growth at 40% of tasks automated | - | - | ##### Gaps over 2x **IMF, Acemoglu, PWBM:** machine median 2.5-3.4x higher; as written 9-12x. - **Price and capability.** These studies value today's AI, profitable on few tasks. The entry has agents doing 80% of office tasks at 8% of the wage from 2028. - **A channel they lack.** They count savings on existing work. The machine lets buyers more than triple the office work bought (999 to 3,276 million worker-years). Its elasticity is measured at 0.7-1.3 times the wage but used 9x below that range, and the only stop is the assumed one-agent-per-person limit. All $39.7T comes from those extra units. - **Spread.** The machine's 80% range reaches $0, like the Danish finding and PwC's pessimistic case. - **Bottleneck.** No estimate limits chips or power. The machine's chip sales grow 50% a year, beyond the IEA outlook, but its demand limit binds first. **RAND, GATE:** 7x or more above the machine. - They automate R&D and reinvest in compute, a channel the machine lacks. - They also assume most tasks are automated. ##### Which I trust more **For the likely 2035 effect:** IMF, Acemoglu and OECD. They rest on measured exposure and savings, as does the one after-the-fact study (small effects). The machine rests on 8 of 10 assumed key numbers and an extrapolated elasticity; its trust is low. **If the pitch's capability arrives:** the machine's median sits mid-range among the forward-looking estimates (OECD, Goldman, PwC's middle case, Oxford Economics). The as-written 13.7% is an upper bound that only PwC's top case reaches. ### Example: Human-level general-purpose robots **Pitch.** "Human-level general-purpose robots (new)" **Restated.** General-purpose robots that can do any physical task a person can, at human speed and reliability, sold as robot work at 5 int$ (2026, PPP) per hour of human-level physical work from 2028, against 14.04 int$ per hour for a human doing the same task; the number that can exist by 2035 is set by the fastest production ramp on record (China's electric cars, x1.69 a year). **Main sources** (strength; saved copy or search only): - IFR, World Robotics 2026 - Industrial Robots, Executive Summary. Copy of stage1-v2/agent4_bottlenecks/raw/ifr_wr2026_exec/e.txt (text of the PDF) (strength 1; saved) - IFR, World Robotics 2026 - Industrial Robots, Executive Summary (as s_ifr_inst): state of humanoids (strength 1; saved) - Electric car sales (IEA Global EV Outlook via Our World in Data). Copy of stage1-v2/v1/agent4_bottlenecks/raw/owid_ev_sales/electric-car-sales.csv (strength 1; saved) - Electric car sales (IEA via OWID), as s_owid_ev14: China 2023 (strength 1; saved) - Counterpoint Research, Global humanoid robot shipments soar nearly 300% YoY in H1 2026 (quote as recorded by stage1-v2 Agent 4, sources.csv S040; not saved) (strength 3; search only) - Morgan Stanley note (analysts led by Adam Jonas) as reported by Investing.com: 1 humanoid robot at $5/hour can do the work of 2 humans at $25/hour (search result only) (strength 3; search only) **Entry (core):** ```yaml price: value: 5.0 unit: 2026 int$ per hour of human-level physical work label: A sources: - s_ms_5h - s_optimus derivation: Batch run, no user to ask, so [A]. 5 int$ an hour is Morgan Stanley's figure for a humanoid's cost of work (strength 3, search result only) and the example p... next_best: name: A human worker doing the same physical task, at the model's world average pay per hour of physical work (ISCO 5-9), on course in 2035 price: value: 14.04 unit: 2026 int$ per hour of human-level physical work label: E sources: [] derivation: 'price:WAGE_PHYS 29,876.9 int$ per worker-year / price:HOURS 2,128 hours per worker-year = 14.040 (input_prices.csv: labour share of world output from PWT 11....' demand: - id: d1 good: K04 layer: ALL mode: supply_net quantity_unit: hours of physical work a year (humans and robots together) P0: use: next_best P1: use: price Q0: value: 6416600000000.0 unit: hours of physical work a year (humans and robots together) label: E sources: [] derivation: ((1 - price:COG_SHARE 0.25867) x O:K18 4,023.24 + O:K04 32.773) million worker-equivalents x price:HOURS 2,128 hours = (2,982.56 + 32.77) x 2.128e9 = 6.4166e... elasticity: value: -0.3 unit: '% change in hours of physical work bought per 1% change in their price' label: A sources: - s_hamermesh - s_lichter evidence_price_range: - 11.23 - 14.04 derivation: 'The own-wage elasticity of aggregate labour demand: Hamermesh''s consensus constant-output value -0.30 (range -0.15 to -0.75); Lichter, Peichl and Siegloch''s ...' limit: value: 12403000000000.0 unit: hours of physical work a year (humans and robots together) label: A sources: - s_ilo_care_hours description: 'Physical bound beyond the evidence: all physical work done on course (Q0, 6.4166e12 hours) plus all unpaid care work done today (ILO: 16.4 billion hours a da...' capacity_2035: value: 28792000000.0 unit: hours of physical work a year (humans and robots together) label: A sources: - s_counterpoint - s_owid_ev14 - s_owid_ev23 - s_ms_5h derivation: 'Robots: humanoid shipments of 50,000 in 2026 (Counterpoint, strength 3, [A]) growing at China''s electric-car sales growth 2014-2023, (8,200,000 / 74,000)^(1/...' changes: - id: ch1 kind: supply input: K04 from_demand: d1 units_per_model_unit: value: 2128000000.0 unit: hours of physical work per million worker-equivalents label: E sources: [] derivation: price:HOURS 2,128 hours per worker-year x 1e6 scale_with: none mechanism: The extra robot work buyers take at the capability's price (capped by capacity_2035) is added to the robot fleet (K04) on course and at record pace, so paths (a) and (b) count the same robots. - id: ch2 kind: supply input: K08 add: value: -5.496 unit: kt magnet rare earth elements per year label: A sources: - s_fai_magnets - s_counterpoint - s_owid_ev14 - s_owid_ev23 derivation: 'Robots built in 2035: 0.05 x 1.6872^9 = 5.5405 million; magnet rare earths per robot: middle of 0.57-1.3 kg NdPr plus middle of 35-79 g Dy = 0.935 + 0.057 = ...' scale_with: none mechanism: The motors of the robots built in 2035 use magnet rare earths that other uses would otherwise have, so the rare earth supply left for the rest of the economy falls by that amount. - id: ch3 kind: supply input: K21 add: value: -0.3382 unit: tn 2026 int$ (PPP) of capital stock in 2035 label: A sources: - s_optimus - s_counterpoint - s_owid_ev14 - s_owid_ev23 derivation: 13.530 million robots in service in 2035 x 25,000 int$ each (middle of Tesla's 20,000-30,000 target at scale, strength 3; a traded good, so market dollars ar... scale_with: none mechanism: 'The robot fleet is capital: the capital stock left for the rest of the economy falls by the robots'' value.' ``` **Comparison with published estimates** (after the run): #### robots_general: comparison with published estimates **Machine (world, 2035, $5 against $14.04 an hour):** median across draws $182B a year, which is 0.063% of world GDP and 0.01 growth points (80% range $0-379B). As written it is $244B (0.084%). **What sets the size:** the fleet, 13.5 million robots in service in 2035 (5.5 million built that year). Stage1-v5's record pace already counts each robot as one worker, so only each robot's second worker-equivalent is added. Counted from zero, the same fleet would give about $0.5T (my rough scaling). **What is compared:** with no published 2035 output effect, I compare fleet, sales and value per robot. All figures are from snippets only: unsaved, strength 3 at best. The entry's first recorded estimate is a reserved study, left out. | Estimate | Their figure | Machine | Machine / it | |---|---|---|---| | Acemoglu-Restrepo 2020 (journal) | +1 robot per 1,000 workers: local employment -0.2 pt, wages -0.42% | 3.4 robots per 1,000 workers; no unemployment | - | | Morgan Stanley (new) | ~13 m in use by 2035 | 13.5 m | 1.0x | | Goldman Sachs 2024 | 1.4 m shipped, $38bn (2035) | 5.5 m built, $139bn at $25,000 | 4.0x / 3.6x | | Goldman 2026 revision | 6.5 m, $138bn | as above | 0.85x / 1.0x | | Barclays 2026 (new) | $200bn (optimistic); China up to 24 m | $139bn; 13.5 m worldwide | 0.7x / 0.56x | | UBS (new) | ~2 m in operation | 13.5 m | 6.8x | | Bank of America (new; blog only) | 10 m | 13.5 m | 1.35x | | Morgan Stanley 2025 | $5/hour robot does 2 humans' work at $25/hour: NPV ~$200k | $18k a year per robot, ~$70k NPV | 0.35x | | Morgan Stanley; Citi 2024 | ~1 bn, $5tn; 650 m, $7tn (2050) | beyond 2035 | - | ##### Gaps over 2x - **Goldman 2024 and UBS (4-7x lower):** they expect pilot-stage humanoids to scale slowly; the entry assumes the capability from 2028 and China's electric-car ramp (x1.69 a year). That is spread and capacity, not value. - **Morgan Stanley's value per robot (2.9x the machine's):** - US pay: a $20 an hour saving, against $9 at the world wage. - The machine counts one of each robot's two worker-equivalents; the other is in the baseline. Counting both gives ~$140k, within 2x. - **Acemoglu-Restrepo:** local job and pay losses are a channel the machine lacks (it has full employment, and lower pay is a transfer). Applied naively, they mean -0.7 points of employment and -1.4% pay. - **The 2050 trillions:** these are market sizes for fleets 50-75x larger, so they say nothing about 2035. ##### Which I trust more **Fleet size:** neither. The bank forecasts span 1.4 to 24 million on unstated assumptions; the machine's stated record ramp lands mid-range. **Value:** the machine, cautiously: it is fleet times wage gap, and no source gives a 2035 output effect. Its trust is still low: 10 of 12 key numbers are assumed, and its largest unknowns (robots in 2035, work per robot) are where forecasts disagree. **Either way:** these robots add well under 1% of world GDP by 2035, because they are too few against 3 billion people doing physical work. ### Example: A cheap cure for most cancers **Pitch.** "A cheap cure for most cancers (new)" **Restated.** A treatment that cures the cancers of four-fifths of people with a new cancer diagnosis (those whose cancer types it works on; the rest keep today's care), given as one course together with the diagnosis it needs, sold from 2028 at 1,000 int$ (2026, PPP) per patient treated, against about 90,400 int$ per patient for today's cancer care (world average, on course in 2035). **Main sources** (strength; saved copy or search only): - Manning, Newhouse, Duan, Keeler, Leibowitz and Marquis, Health Insurance and the Demand for Medical Care: Evidence from a Randomized Experiment, American Economic Review 77(3), 1987 (abstract). Copy of stage1-v1/agent2_ratios/raw/rand_manning1987/manning.txt (strength 1; saved) - Manning et al. 1987 (as rand_abstract), p. 268: the three estimation methods (strength 1; saved) - Manning et al. 1987 (as rand_abstract), Table 8: arc elasticities for coinsurance ranges 0-25 and 25-95 percent (the price range the evidence covers) (strength 1; saved) - Barber, Gotham, Bygrave and Cepuch, Estimated Sustainable Cost-Based Prices for Diabetes Medicines, JAMA Network Open 2024;7(3):e243474. Copy of stage1-v2/v1/agent3_needs/raw/barber2024_jama_pdf/paper.txt (strength 2; saved) - UN World Population Prospects 2024, population by five-year age group, medium variant: World, 2035 rows (saved by the AI agents entry; extract of stage1-v2/baseline/raw/un_wpp2024_age5/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) (strength 2; saved) - IARC, Global cancer statistics 2024: GLOBOCAN estimates of incidence and mortality worldwide for 34 cancers in 186 countries (news release; Bray et al., CA Cancer J Clin, July 2026). Search snippet only (strength 1; search only) **Entry (core):** ```yaml price: value: 1000 unit: 2026 int$ per patient treated (diagnosis, one curative course and follow-up) label: A sources: - barber2024 - hcv_generic60 - hcv_launch85k derivation: 'Batch run, no user to ask, so [A]. ''Cheap'' is read as the price of a generic curative medicine plus the diagnosis needed to give it. Comparable: hepatitis C,...' next_best: name: 'Today''s cancer care (surgery, radiotherapy, chemotherapy and other medicines, hospital stays, follow-up and end-of-life care): world average spending per patient treated, on course in 2035, at 2026 prices' price: value: 90392.59 low: 63274.81 high: 126549.62 unit: 2026 int$ per patient treated (diagnosis, one curative course and follow-up) label: A sources: - ihe2020 - ihe2020_103bn - eu_cases2022 - efpia_ihe2025 - oecd_hs6 - oecd_ncd94 - iarc2024 - iarc2050 - who_access2019 - sullivan2015 derivation: World cancer spending / patients treated = derivation_inputs.cancer_share_health (0.05) x 1e9 / Q0 factor (553.14 patients per bn of C05) = 0.05 x 1e9 / 553.... demand: - id: d1 good: new:cancer_cure layer: C05 mode: cost quantity_unit: patients treated a year (people with a new cancer diagnosis given a full course of care) P0: use: next_best P1: use: price Q0: model: oc:C05 factor: value: 553.14 low: 436.0 high: 683.0 unit: patients treated a year per bn of C05 output (on course 2035) label: A sources: - iarc2024 - iarc2050 - who_access2019 - sullivan2015 derivation: 'Patients treated on course in 2035 / on-course C05 output: derivation_inputs.treated_share 0.70 x cases_2035 25.591 million = 17.914 million, / 32,385.0 bn (...' elasticity: value: -0.2 low: -0.1 high: -0.4 unit: '% change in patients treated per 1% change in the price of care' label: A sources: - rand_range - rand_abstract - rand_arc - goldman2010 - goldman2006 - jung2017 evidence_price_range: - 22598.15 - 90392.59 derivation: 'RAND Health Insurance Experiment (randomised, US 1974-82, strength 1): ''The price elasticity is approximately - 0.2''; three methods put it ''in the -0.1 to -0...' elasticity_alternatives: - value: -0.1 unit: '% change in patients treated per 1% change in the price of care' label: A sources: - rand_range derivation: Lower end of RAND's -0.1 to -0.2 range (cancer patients in rich countries are already treated whatever the price). - value: -0.72 unit: '% change in cancer-drug spending per 1% change in the price paid' label: A sources: - jung2017 derivation: Medicare Part D, specialty cancer drugs, elderly without low-income subsidy (Jung, Feldman and McBean 2017, snippet). A spending elasticity for patients payi... limit: value: 25590734 low: 23543475 high: 27637992 unit: patients treated a year (people with a new cancer diagnosis given a full course of care) label: A sources: - iarc2024 - iarc2050 derivation: derivation_inputs.cases_2035, 25.591 million new cancer cases in 2035 (GLOBOCAN 2024 path, snippets). Low and high -8% and +8%. description: 'Physical need: at most every person with a new cancer diagnosis in 2035 is treated (1.43 x Q0). On the curve this binds below about 15,200 int$ per patient (...' changes: - id: ch1 kind: recipe input: LAB layers: - C05 multiplier: value: 0.95055 unit: x today's work per unit of C05 output label: A sources: [] derivation: 1 - cancer_share_health x (1 - P1 / P0) = 1 - 0.05 x (1 - 1,000 / 90,392.6) = 0.95055 at the reference price, scaled by the 2035 spread (0.504) in the engine... scale_with: adoption mechanism: 'The cure replaces costly cancer care with a cheap course, so health care (C05) needs less work per unit of output: the labour model''s work need (robots K04, AI agents K03 and their compute and electricity) falls. One mechanism with d1, carried to path (b).' - id: ch2 kind: recipe input: K18 layers: - C05 multiplier: value: 0.95055 unit: x today's human workers per unit of C05 output label: A sources: [] derivation: 'As ch1: the same resource saving applied to the human workforce ratio, which the model keeps separate from the labour model''s work need.' scale_with: adoption mechanism: 'Oncologists, nurses and other staff no longer needed for long cancer treatments are freed, so C05 needs fewer human workers per unit of output (path b). Not a second count of ch1: ch1 changes the machine-work need, ch2 the human-worker need.' - id: ch3 kind: recipe input: K21 layers: - C05 multiplier: value: 0.95055 unit: x today's capital stock per unit of C05 output label: A sources: [] derivation: 'As ch1: radiotherapy machines, operating theatres and hospital beds used for cancer care are freed in the same proportion [A].' scale_with: adoption mechanism: Less hospital and radiotherapy capital is needed per unit of health output, so the capital stock (K21, third to bind in stage1-v5) goes further in path (b). ``` **Comparison with published estimates** (after the run): #### cancer_cure_cheap: comparison with published estimates **Machine (2035, 2026 int$):** $958B measured GDP (median economy, 0.33% of world output; draws' median $572B): $807B freed care spending, $151B extra patients; workers kept alive $192B (not added). Value beyond GDP is $3.6T: 3.2M deaths avoided (25.7%). The cure reaches 50.4% of new patients. All estimates were read only in search snippets: strength 3 at best. Ratio = machine / estimate. | Estimate (strongest first) | Their number | Machine's scale, 2035 | Machine | Ratio | |---|---|---|---|---| | Chen et al. 2023, world | 0.55% of GDP a year | x $290T x 0.504 = $0.80T (upper bound) | $0.96T | 1.2 | | OECD 2024, OECD only | EUR PPP 449bn care, 163bn work | $0.63T; work x 0.504 = $0.11T [EUR PPP \u2248 1.4 int$, A] | world care $1.62T; workers $0.19T | 2.6; 1.7 | | Lakdawalla et al. 2010, US | $82,000 per life-year | \u2248 2.3x US income [A] | 2.3x world income | 1.0 | | Murphy & Topel 2006, US | $50T a cure (new); $500bn per 1% cut | 3% a year, x 25.7% \u2248 $0.7T | US share \u2248 $0.6T [A] | 0.8 | | Lancet Oncology Commission 2015 | >$6T lost 2015-30 without surgery | $0.4T a year | labour $0.19T | 0.5 | | WHO 2020 | 7M lives a decade | 0.7M a year | 3.2M | 4.6 | | ACS/LIVESTRONG 2010 (new) | 1.5% of GDP, DALYs | x 25.7% = $1.1T | $3.6T | 3.2 | | Moore & Philipson 2026, advocacy (new) | US $185T over 35 years; "+1 growth point" | x 25.7% \u2248 $1.3T | $0.6T; 0.02 points | 0.45; 0.02 | ##### Where they differ by more than 2x - **OECD care, WHO:** different scope. The OECD is 39% of the machine's world spending, which is plausible, though the 5% cancer share may be high. WHO scales up today's care, not a cure. - **ACS:** different valuation. ACS uses about 1x income per DALY, discounted; the machine uses 2.3x over 15 years. IARC 2014 (new) gives $1.16T, or $2.5T with a value of statistical life, so the machine is at the high end. - **Lancet Commission:** losses build from 2015 and include lost capital. The cure starts in 2028, with no capital channel and its workers unadded. - **Moore & Philipson:** full US values of life; the growth claim has no stated mechanism. ##### Which I trust more On measured GDP the machine and Chen agree within 2x, through different channels. 84% of the machine's gain is freed spending, which rests on an assumed cancer share. Chen counts lost labour, which the machine leaves unadded, and care spending only as lost investment (split not in snippets). I trust Chen more: peer-reviewed, modelled by country, age and cancer. The machine's trust is low, with all 12 key numbers assumed. The price lies beyond the evidence, but the limit binds below 15,200 int$, so it matters little. On value beyond GDP, Lakdawalla and Murphy-Topel support the machine's value of a life-year, so $3.6T is the upper middle of a 2-3x range. ### Example: Moon travel at $100 a trip **Pitch.** "Moon travel at $100 a trip (new)" **Restated.** A return trip for one passenger from Earth's surface to the Moon's surface and back, about a week, with seat, air, food and water on board (lodging on the Moon not included), sold at 100 int$ (2026, PPP) per trip from 2030, against about 65 million int$ for the nearest product sold today, a seat on a private crewed orbital flight of several days. **Main sources** (strength; saved copy or search only): - InterVISTAS Consulting for IATA (2007), Estimating Air Travel Demand Elasticities, Figure 3-1 reproducing Gillen, Morrison and Stewart's meta-study; saved copy from stage1-v1/agent2_ratios/raw/intervistas_2007/iv.txt (strength 3; saved) - UN World Population Prospects 2024, population by five-year age group, medium variant: World, 2035 rows (copy of sources/ai_office_agents__un_wpp2024_world2035.txt, an extract of stage1-v2/baseline/raw/un_wpp2024_age5/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) (strength 1; saved) - Our World in Data, electric car sales (IEA Global EV Outlook data): World rows; copy of sources/ai_office_agents__owid_ev_sales.txt (strength 1; saved) - IEA, World Energy Outlook 2025 (electric car share of the car market); saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt (strength 1; saved) - IRENA, Renewable Power Generation Costs in 2024 (summary); saved copy from stage1-v2/agent6_cheap_inputs/raw/irena_rpgc2024/summary.txt (used in the energy flag) (strength 1; saved) - World Bank Commodity Price Data (Pink Sheet), annual nominal prices, natural gas columns 2015-2024; extract of stage1-v2/agent6_cheap_inputs/raw/wb_pinksheet/CMO-Historical-Data-Annual.xlsx (used in the energy flag) (strength 1; saved) **Entry (core):** ```yaml price: value: 100 unit: 2026 int$ per return trip (Earth's surface to the Moon's surface and back, one passenger) label: A sources: [] derivation: Given in the pitch ($100 a trip). Batch run, no user to ask, so per research.md the price is [A]. The pitch's dollars are read as 2026 international dollars ... next_best: name: 'A seat on a private crewed orbital spaceflight of several days (Axiom Space''s private astronaut missions to the ISS, about 55-70 million US$ a seat). It is the nearest product on sale: no private Moon trip has flown (Space Adventures'' circumlunar offer, quoted at about 150 million US$ a seat, has never flown).' price: value: 65000000 unit: '2026 int$ per seat (same unit as the price: one passenger, one trip)' label: A sources: - s_axiom_mid60 - s_axiom_55 - s_sa_moon low: 55000000 high: 150000000 derivation: Axiom's standard seat price is reported in the 'mid-$60 million' range (2025; search snippet only, so [A]); the first mission (2022) was estimated at 55 mill... demand: - id: d1 good: new:moon_trip layer: C06 mode: cost quantity_unit: return trips to the Moon a year (one passenger each) P0: use: next_best P1: use: price Q0: value: 12 unit: trips a year bought on course in 2035 at the next-best price (private crewed orbital seats) label: A sources: - s_private_flights - s_soyuz_tourists low: 5 high: 30 derivation: 'Private crewed orbital flights 2021-2025: Inspiration4 (2021), Ax-1 (2022), Ax-2 (2023), Ax-3 and Polaris Dawn (2024), Ax-4 and Fram2 (2025), seven flights w...' elasticity: value: -1.04 unit: '% change in trips per 1% change in price' label: A sources: - s_iv_gillen - s_gillen - s_sp_surveys - s_iaato - s_fred_cpi low: -0.78 high: -1.56 evidence_price_range: - 300 - 3000 derivation: 'The median fare elasticity of long-haul international leisure air travel in Gillen, Morrison and Stewart''s meta-study, reproduced in InterVISTAS (2007): -1.0...' limit: value: 3040000000.0 unit: return trips to the Moon a year (one passenger each) label: A sources: - s_wpp_2035 - s_yougov_moon - s_axios_moon description: 'Physical bound beyond the evidence: at most one week-long trip a year for each person who would like to go. 6.471 billion people aged 15-74 in 2035 (UN WPP 2...' changes: - id: ch1 kind: own_output from_demand: d1 layer: C06 needs: - input: K01 per_unit: value: 2.18e-05 unit: TWh per trip (TWh a year per trip a year) label: A sources: - s_escape - s_elevator low: 1.45e-06 high: 9.6e-05 derivation: 'Energy to lift a mass from Earth''s surface out of Earth''s gravity (escape speed 11.19 km/s: 62.6 MJ/kg) and back out of the Moon''s on the return (2.38 km/s: ...' scale_with: adoption mechanism: The extra Moon trips are new output of transport services (C06), computed by the model from the demand curve, and each extra trip uses the electricity that lifts its passenger and cabin out of Earth's and the Moon's gravity (assumed electric launch, see performance). Path (b) also gives the new output C06's average recipe (workers, capital, fuel per dollar of output). ``` **Comparison with published estimates** (after the run): #### moon_travel_100: comparison with published estimates **Machine (world, 2035, $100 a trip against $65M for an orbital seat today):** a gain of $0.96B as written and $2B as the median of the draws (80% range $0B to $94B), with 6.93% of the market served. Spending on space trips is about $0.82B: $0.09B on 0.92M trips at $100 and $0.73B on 11 seats at $65M. The gain is mostly what buyers would have paid above $100, not revenue; with everyone served it is $13.8B. **No published estimate covers trips at anything near $100. Every figure below was read only in search snippets (full texts would not open): each is strength 3 at best and unsaved.** | Estimate (strongest first) | Their number | Same scale as the machine | Ratio | |---|---|---|---| | Stated-preference surveys (Collins et al.; Abitzsch; set the entry's elasticity range) | 150,000 trips a year at $22,400; 20M at $2,240 (2026 int$) | the machine's curve gives 48,000 and 524,000 | theirs 3x and 38x | | WEF and McKinsey 2024; PwC 2021 (new) | space economy $1.8T in 2035; lunar economy $170B over 2020-2040 | trips only | scope | | UBS 2019 | space tourism $3B a year by 2030; rocket travel on Earth $20B | spending $0.82B | 3.7x; a channel | | Futron 2002 (checkable) | over $1B a year by 2021: 15,000 suborbital and 60 orbital passengers | actual about 20 and 5 a year | 100-1,000x too high | | Bottom-up count 2026 (new) | orbital tourism under $0.5B a year | on course: 12 seats, $0.78B | within 2x | | Future Market Insights | space tourism $5.1B in 2035 | $0.82B | 6x | **Why they differ** 1. *Price and measure.* The forecasts are revenue at today's prices ($0.45M-65M a seat), not a gain at $100. 2. *Scope.* UBS and FMI include suborbital hops, outside the machine's base of orbital seats; WEF and PwC cover satellites and cargo. 3. *Forecast record.* Futron was 100-1,000x too high on passengers. The bottom-up count agrees with the machine's anchor, which rests on seats actually sold. 4. *Surveys* record what people say, which runs high. If they are right, demand is more elastic than -1.04. The entry's -1.56 end gives the $94B top of the range. 5. *A missing channel.* A $100 trip implies about $0.3 a kg to the Moon. Satellites, travel on Earth and space industry would become cheap too, and UBS's $20B and WEF's $1.8T suggest that could dwarf the trips (separate capabilities). **Which I trust.** For spending at today's prices, the machine: it rests on seats actually sold, matches the bottom-up count, and forecasts have overstated this market before. For $100 trips I would not trust the central $1-2B within 10x. Nothing published exists at that price, the machine stretches an air-travel elasticity across six orders of magnitude, and $100 is below the energy a trip must use at today's prices. The 80% range is the honest answer. Copy instructionsPaste the entry back into the box under the map: the page validates it, shows every number for editing and runs it. To add it to the library: save it as capabilities/.yaml, run code/validate.py, then run code/c_runs.py. How stable the research is Each starter was researched twice by agents that could not see each other's work. Below: how far apart their answers were, at each run's own price and at a tenth of the next-best option's price (a price both can be compared at). Where they were more than 2x apart, research.md was tightened once ("Rules that keep two runs alike") and the starter was researched twice more, fresh. Idea | First check: run B / run A at its price | at a tenth of the next-best | Within 2x | After tightening: run D / run C | at a tenth | Within 2x | AI agents doing most office work | 0.50x | 0.56x | no | 0.50x | 0.69x | yes | A cheap cure for most cancers | 0.86x | 0.90x | yes | | | | Much faster clinical approval | 1.34x | 2.17x | no | 1.08x | 6.22x | no | Construction with far less labour and material per building | 0.56x | 0.57x | yes | | | | Electricity at a fraction of today's cost | 1.28x | 1.14x | yes | | | | Transformers and grid equipment built far faster | 0.76x | 2.96x | no | 1.49x | 2.64x | no | Moon travel at $100 a trip | 65.93x | 0.23x | no | one is zero | 1.51x | no | Much faster building permits and grid connections | 0.80x | 0.73x | yes | | | | Human-level general-purpose robots | 2.44x | 1.87x | no | 0.53x | 0.48x | no | Tradespeople trained far faster | 1.77x | 1.16x | yes | | | | Sources - pitch/consistency.csv (https://world.abundancemachines.si/data/v7/pitch/consistency.csv) - pitch/consistency_diffs.csv (https://world.abundancemachines.si/data/v7/pitch/consistency_diffs.csv) - pitch/consistency_repeat.csv (https://world.abundancemachines.si/data/v7/pitch/consistency_repeat.csv) - pitch/quick_band.csv (https://world.abundancemachines.si/data/v7/pitch/quick_band.csv) Quick instructions (translate.md) (https://world.abundancemachines.si/data/v7/pitch/translate.md) Model IDs (model_ids.md) (https://world.abundancemachines.si/data/v7/pitch/model_ids.md) Entry template (https://world.abundancemachines.si/data/v7/capabilities/_template.yaml)