# Meta-machine - Stage 1 v7: the economic machine For any idea pitched at a price: how much of the gap to doubling world output by 2035 it fills, what limits it, which input runs short next, and how far to trust it. Built on the stage1-v5 map. ## Model context - [Full text](https://world.abundancemachines.si/llms-full.txt) - [Model JSON](https://world.abundancemachines.si/data/model.json) - [Source manifest](https://world.abundancemachines.si/data/manifest.json) - [Download context](https://world.abundancemachines.si/context.zip) ## Explanations - [If an idea existed by 2035, how much of the gap would it fill?](https://world.abundancemachines.si/guide/start.txt) - [What is the 2026 starting point?](https://world.abundancemachines.si/guide/today.txt) - [What would doubling take?](https://world.abundancemachines.si/guide/target.txt) - [Where is the world on course to land?](https://world.abundancemachines.si/guide/growth.txt) - [Tier 1 - From baseline to the historical benchmark](https://world.abundancemachines.si/guide/tier-1.txt) - [Tier 2 - The gap beyond the historical benchmark](https://world.abundancemachines.si/guide/tier-2.txt) - [How to read the map](https://world.abundancemachines.si/guide/reading-the-map.txt) - [How output is divided among sectors](https://world.abundancemachines.si/guide/layers.txt) - [Food at home](https://world.abundancemachines.si/guide/layer-c01.txt) - [Clothing](https://world.abundancemachines.si/guide/layer-c02.txt) - [Shelter and utilities](https://world.abundancemachines.si/guide/layer-c03.txt) - [Household equipment](https://world.abundancemachines.si/guide/layer-c04.txt) - [Health care](https://world.abundancemachines.si/guide/layer-c05.txt) - [Mobility](https://world.abundancemachines.si/guide/layer-c06.txt) - [Communication](https://world.abundancemachines.si/guide/layer-c07.txt) - [Recreation](https://world.abundancemachines.si/guide/layer-c08.txt) - [Education](https://world.abundancemachines.si/guide/layer-c09.txt) - [Food service, lodging](https://world.abundancemachines.si/guide/layer-c10.txt) - [Personal and financial services](https://world.abundancemachines.si/guide/layer-c11.txt) - [Public services](https://world.abundancemachines.si/guide/layer-c12.txt) - [Built structures](https://world.abundancemachines.si/guide/layer-c13.txt) - [Productive equipment](https://world.abundancemachines.si/guide/layer-c14.txt) - [Knowledge and software](https://world.abundancemachines.si/guide/layer-c15.txt) - [Alcohol, tobacco, narcotics](https://world.abundancemachines.si/guide/layer-u1.txt) - [Net purchases abroad](https://world.abundancemachines.si/guide/layer-u2.txt) - [Inventories](https://world.abundancemachines.si/guide/layer-u3.txt) - [Net exports](https://world.abundancemachines.si/guide/layer-u4.txt) - [Accounting rows](https://world.abundancemachines.si/guide/layer-u.txt) - [Which inputs run short first?](https://world.abundancemachines.si/guide/shortages.txt) - [Physical machine labour (robots)](https://world.abundancemachines.si/guide/shortage-k04.txt) - [Cropland](https://world.abundancemachines.si/guide/shortage-k22.txt) - [Capital stock](https://world.abundancemachines.si/guide/shortage-k21.txt) - [Construction trades](https://world.abundancemachines.si/guide/shortage-k17.txt) - [Professional licensing](https://world.abundancemachines.si/guide/shortage-k16.txt) - [Human workforce](https://world.abundancemachines.si/guide/shortage-k18.txt) - [Copper](https://world.abundancemachines.si/guide/shortage-k06.txt) - [Electricity](https://world.abundancemachines.si/guide/shortage-k01.txt) - [Fuels](https://world.abundancemachines.si/guide/shortage-k02.txt) - [Machine cognition (AI agents)](https://world.abundancemachines.si/guide/shortage-k03.txt) - [AI compute](https://world.abundancemachines.si/guide/shortage-k05.txt) - [Lithium](https://world.abundancemachines.si/guide/shortage-k07.txt) - [Rare earths](https://world.abundancemachines.si/guide/shortage-k08.txt) - [Steel](https://world.abundancemachines.si/guide/shortage-k09.txt) - [Cement](https://world.abundancemachines.si/guide/shortage-k10.txt) - [Aluminium](https://world.abundancemachines.si/guide/shortage-k20.txt) - [Saving for investment](https://world.abundancemachines.si/guide/shortage-k11.txt) - [Building permission](https://world.abundancemachines.si/guide/shortage-k12.txt) - [Grid connection approval](https://world.abundancemachines.si/guide/shortage-k13.txt) - [Transformers and grid equipment](https://world.abundancemachines.si/guide/shortage-k14.txt) - [Clinical approval](https://world.abundancemachines.si/guide/shortage-k15.txt) - [Buyers for built structures](https://world.abundancemachines.si/guide/shortage-buy-c13.txt) - [Buyers for public services](https://world.abundancemachines.si/guide/shortage-buy-c12.txt) - [Seven items listed separately](https://world.abundancemachines.si/guide/excluded-inputs.txt) - [What the evidence labels mean](https://world.abundancemachines.si/guide/evidence.txt) - [How the model tests uncertainty](https://world.abundancemachines.si/guide/scenarios.txt) - [How v7 works](https://world.abundancemachines.si/guide/methods.txt) - [Which input thresholds come first?](https://world.abundancemachines.si/guide/picks.txt) - [Data and model sources](https://world.abundancemachines.si/guide/sources.txt) - [Ask your own AI](https://world.abundancemachines.si/guide/ask.txt) - [Ten starter ideas, ranked](https://world.abundancemachines.si/guide/ideas.txt) - [AI agents doing most office work](https://world.abundancemachines.si/guide/idea-ai-office-agents.txt) - [Construction with far less labour and material per building](https://world.abundancemachines.si/guide/idea-construction-efficient.txt) - [A cheap cure for most cancers](https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.txt) - [Much faster building permits and grid connections](https://world.abundancemachines.si/guide/idea-permits-grid-fast.txt) - [Human-level general-purpose robots](https://world.abundancemachines.si/guide/idea-robots-general.txt) - [Electricity at a fraction of today's cost](https://world.abundancemachines.si/guide/idea-electricity-cheap.txt) - [Transformers and grid equipment built far faster](https://world.abundancemachines.si/guide/idea-grid-equipment-fast.txt) - [Much faster clinical approval](https://world.abundancemachines.si/guide/idea-clinical-approval-fast.txt) - [Tradespeople trained far faster](https://world.abundancemachines.si/guide/idea-trades-training-fast.txt) - [Moon travel at $100 a trip](https://world.abundancemachines.si/guide/idea-moon-travel-100.txt) - [Pitch an idea](https://world.abundancemachines.si/guide/pitch.txt) - [How far to trust it: the machine's own benchmark](https://world.abundancemachines.si/guide/benchmark.txt) - [Testing the starting numbers and the arithmetic](https://world.abundancemachines.si/guide/tests.txt) - [Starting numbers](https://world.abundancemachines.si/guide/agent-1.txt) - [Number tests](https://world.abundancemachines.si/guide/agent-2.txt) - [What people buy](https://world.abundancemachines.si/guide/agent-3.txt) - [What inputs allow](https://world.abundancemachines.si/guide/agent-4.txt) - [Past cases](https://world.abundancemachines.si/guide/agent-5.txt) - [Idea research](https://world.abundancemachines.si/guide/agent-6.txt) - [Six research streams](https://world.abundancemachines.si/guide/agents.txt) ## Source tables - [data/compare_v4.csv](https://world.abundancemachines.si/data/compare_v4.csv) - [data/mc_cases.csv](https://world.abundancemachines.si/data/mc_cases.csv) - [data/mc_world.csv](https://world.abundancemachines.si/data/mc_world.csv) - [data/sector_split.csv](https://world.abundancemachines.si/data/sector_split.csv) - [data/sector_ranges.csv](https://world.abundancemachines.si/data/sector_ranges.csv) - [data/layers_v5_median.csv](https://world.abundancemachines.si/data/layers_v5_median.csv) - [data/breaking_points.csv](https://world.abundancemachines.si/data/breaking_points.csv) - [data/inputs_v5.csv](https://world.abundancemachines.si/data/inputs_v5.csv) - [data/not_inputs.csv](https://world.abundancemachines.si/data/not_inputs.csv) - [data/shortages_v5.csv](https://world.abundancemachines.si/data/shortages_v5.csv) - [data/on_course_path.csv](https://world.abundancemachines.si/data/on_course_path.csv) - [data/on_course_range.csv](https://world.abundancemachines.si/data/on_course_range.csv) - [data/ceiling_final.csv](https://world.abundancemachines.si/data/ceiling_final.csv) - [data/mc_sensitivity.csv](https://world.abundancemachines.si/data/mc_sensitivity.csv) - [data/checks_v5.csv](https://world.abundancemachines.si/data/checks_v5.csv) - [data/sources.csv](https://world.abundancemachines.si/data/sources.csv) - [data/summary.md](https://world.abundancemachines.si/data/summary.md) - [data/limits.md](https://world.abundancemachines.si/data/limits.md) - [data/code/s6_montecarlo.py](https://world.abundancemachines.si/data/code/s6_montecarlo.py) - [data/code/s7_rerun_v4.py](https://world.abundancemachines.si/data/code/s7_rerun_v4.py) - [data/code/s8_inputs.py](https://world.abundancemachines.si/data/code/s8_inputs.py) - [data/code/s11_summary.py](https://world.abundancemachines.si/data/code/s11_summary.py) - [data/v7/results/summary.csv](https://world.abundancemachines.si/data/v7/results/summary.csv) - [data/v7/results/runs.csv](https://world.abundancemachines.si/data/v7/results/runs.csv) - [data/v7/results/receipts.csv](https://world.abundancemachines.si/data/v7/results/receipts.csv) - [data/v7/results/sensitivity.csv](https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - [data/v7/results/pairs.csv](https://world.abundancemachines.si/data/v7/results/pairs.csv) - [data/v7/results/profit.csv](https://world.abundancemachines.si/data/v7/results/profit.csv) - [data/v7/results/knockons.csv](https://world.abundancemachines.si/data/v7/results/knockons.csv) - [data/v7/results/value_beyond.csv](https://world.abundancemachines.si/data/v7/results/value_beyond.csv) - [data/v7/results/no_capability.csv](https://world.abundancemachines.si/data/v7/results/no_capability.csv) - [data/v7/results/sources.csv](https://world.abundancemachines.si/data/v7/results/sources.csv) - [data/v7/retro/results.csv](https://world.abundancemachines.si/data/v7/retro/results.csv) - [data/v7/retro/known.csv](https://world.abundancemachines.si/data/v7/retro/known.csv) - [data/v7/retro/contamination.csv](https://world.abundancemachines.si/data/v7/retro/contamination.csv) - [data/v7/scorecard.csv](https://world.abundancemachines.si/data/v7/scorecard.csv) - [data/v7/published.csv](https://world.abundancemachines.si/data/v7/published.csv) - [data/v7/MANIFEST.csv](https://world.abundancemachines.si/data/v7/MANIFEST.csv) - [data/v7/numbers_a1.csv](https://world.abundancemachines.si/data/v7/numbers_a1.csv) - [data/v7/input_prices.csv](https://world.abundancemachines.si/data/v7/input_prices.csv) - [data/v7/checks/a2_tests.csv](https://world.abundancemachines.si/data/v7/checks/a2_tests.csv) - [data/v7/checks/a2_replacements.csv](https://world.abundancemachines.si/data/v7/checks/a2_replacements.csv) - [data/v7/checks/a4_breaking_points.csv](https://world.abundancemachines.si/data/v7/checks/a4_breaking_points.csv) - [data/v7/checks/a5_toys.csv](https://world.abundancemachines.si/data/v7/checks/a5_toys.csv) - [data/v7/checks/d_js_python.csv](https://world.abundancemachines.si/data/v7/checks/d_js_python.csv) - [data/v7/pitch/consistency.csv](https://world.abundancemachines.si/data/v7/pitch/consistency.csv) - [data/v7/pitch/quick_band.csv](https://world.abundancemachines.si/data/v7/pitch/quick_band.csv) - [data/v7/pitch/consistency_diffs.csv](https://world.abundancemachines.si/data/v7/pitch/consistency_diffs.csv) - [data/v7/pitch/consistency_repeat.csv](https://world.abundancemachines.si/data/v7/pitch/consistency_repeat.csv) - [data/v7/pitch/redteam.csv](https://world.abundancemachines.si/data/v7/pitch/redteam.csv) - [data/v7/pitch/source_check.csv](https://world.abundancemachines.si/data/v7/pitch/source_check.csv) - [data/v7/pitch/research.md](https://world.abundancemachines.si/data/v7/pitch/research.md) - [data/v7/pitch/translate.md](https://world.abundancemachines.si/data/v7/pitch/translate.md) - [data/v7/pitch/model_ids.md](https://world.abundancemachines.si/data/v7/pitch/model_ids.md) - [data/v7/capabilities/_template.yaml](https://world.abundancemachines.si/data/v7/capabilities/_template.yaml) - [data/v7/capabilities/ai_office_agents.yaml](https://world.abundancemachines.si/data/v7/capabilities/ai_office_agents.yaml) - [data/v7/capabilities/cancer_cure_cheap.yaml](https://world.abundancemachines.si/data/v7/capabilities/cancer_cure_cheap.yaml) - [data/v7/capabilities/clinical_approval_fast.yaml](https://world.abundancemachines.si/data/v7/capabilities/clinical_approval_fast.yaml) - [data/v7/capabilities/construction_efficient.yaml](https://world.abundancemachines.si/data/v7/capabilities/construction_efficient.yaml) - [data/v7/capabilities/electricity_cheap.yaml](https://world.abundancemachines.si/data/v7/capabilities/electricity_cheap.yaml) - [data/v7/capabilities/grid_equipment_fast.yaml](https://world.abundancemachines.si/data/v7/capabilities/grid_equipment_fast.yaml) - [data/v7/capabilities/moon_travel_100.yaml](https://world.abundancemachines.si/data/v7/capabilities/moon_travel_100.yaml) - [data/v7/capabilities/permits_grid_fast.yaml](https://world.abundancemachines.si/data/v7/capabilities/permits_grid_fast.yaml) - [data/v7/capabilities/robots_general.yaml](https://world.abundancemachines.si/data/v7/capabilities/robots_general.yaml) - [data/v7/capabilities/trades_training_fast.yaml](https://world.abundancemachines.si/data/v7/capabilities/trades_training_fast.yaml) If an idea existed by 2035, how much of the gap would it fill? https://world.abundancemachines.si/guide/start.html The world makes $224.3T in 2026. Twice that is $448.5T in 2035. On course it reaches $290.2T, which leaves $158.3T to fill. # | Idea | Share of the gap, median (80% range) | $ a year | Runs short next (share of the 1,000 runs) | Limit | Trust | Rank on sourced numbers alone | 1 | AI agents doing most office work (https://world.abundancemachines.si/guide/idea-ai-office-agents.html) | 6.7% (0.0% to 22.0%) | $10.9T | Cropland (69.3%) | buyers | low | 9 | 2 | Construction with far less labour and material per building (https://world.abundancemachines.si/guide/idea-construction-efficient.html) | 0.48% (0.0% to 4.1%) | $0.8T | Cropland (57.6%); middle case: Physical machine labour (robots) | buyers | low | 1 | 3 | A cheap cure for most cancers (https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html) | 0.35% (0.0% to 1.1%) | $0.6T | Cropland (53.7%); middle case: Physical machine labour (robots) | buyers | low | 2 | 4 | Much faster building permits and grid connections (https://world.abundancemachines.si/guide/idea-permits-grid-fast.html) | 0.18% (0.0% to 1.1%) | $0.3T | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 3 | 5 | Human-level general-purpose robots (https://world.abundancemachines.si/guide/idea-robots-general.html) | 0.11% (0.0% to 0.24%) | $0.2T | Cropland (54.8%); middle case: Physical machine labour (robots) | buyers | low | 9 | 6 | Electricity at a fraction of today's cost (https://world.abundancemachines.si/guide/idea-electricity-cheap.html) | 0.08% (0.0% to 0.17%) | $0.1T | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 4 | 7 | Transformers and grid equipment built far faster (https://world.abundancemachines.si/guide/idea-grid-equipment-fast.html) | 0.01% (0.0% to 0.05%) | $18B | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 6 | 8 | Much faster clinical approval (https://world.abundancemachines.si/guide/idea-clinical-approval-fast.html) | 0.01% (0.0% to 0.03%) | $16B | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 5 | 9 | Tradespeople trained far faster (https://world.abundancemachines.si/guide/idea-trades-training-fast.html) | 0.01% (0.0% to 0.06%) | $9B | Cropland (52.7%); middle case: Physical machine labour (robots) | buyers | low | 7 | 10 | Moon travel at $100 a trip (https://world.abundancemachines.si/guide/idea-moon-travel-100.html) | 0.00% (0.0% to 0.06%) | $2B | Cropland (51.9%); middle case: Physical machine labour (robots) | buyers | low | 8 | Each idea is described only as changes to model numbers: a demand curve, a recipe (input per unit of output), a supply, a removed cap. The machine then takes the smaller of two answers. What people buy (path a): on course, plus the saving on units bought anyway, plus the extra units bought as the price falls, valued at the average of the old and new price. What every input allows (path b): every layer raised toward its 2035 target in equal steps, until the first input passes its record-pace supply. The smaller one is what limits the result. Each result is the median across 1,000 stage1-v5 simulation draws. Its 80% range also covers the idea's own key numbers (within their stated range, or a band by label) and the starting numbers both ways. On five past cases pitched blind, the method landed within 2x of the known effect in 2 of 5 and tends to undercount. See the benchmark (https://world.abundancemachines.si/guide/benchmark.html) All ten ideas (https://world.abundancemachines.si/guide/ideas.html) - Pitch your own idea (https://world.abundancemachines.si/guide/pitch.html) - How it works (https://world.abundancemachines.si/guide/methods.html) Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - retro/results.csv (https://world.abundancemachines.si/data/v7/retro/results.csv) What is the 2026 starting point? https://world.abundancemachines.si/guide/today.html V5 starts with $224.3T of estimated annual world output. Purchasing power parity (PPP) adjusts for differences in what money buys. The map reports annual production at a common 2026 price basis. Sources - compare_v4.csv (https://world.abundancemachines.si/data/compare_v4.csv) What would doubling take? https://world.abundancemachines.si/guide/target.html The 2035 target is $448.5T, twice the 2026 estimate. That requires 8.0% annual compound growth over nine years. V5 records a fastest nine-year world growth rate of 4.3% from its historical series. The map splits the total among sectors using the income elasticity rule. Equal expansion, spending patterns in countries at similar incomes, and capital requirements are the other choices examined. Sources - sector_split.csv (https://world.abundancemachines.si/data/sector_split.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) - summary.md (https://world.abundancemachines.si/data/summary.md) Where is the world on course to land? https://world.abundancemachines.si/guide/growth.html The estimate is $290.2T in 2035, or 2.9% annual growth. V5 extends the IMF's October 2026 forecast to 2035 and adjusts it using errors in past nine-year forecasts. The middle 80% of the simulated outcomes spans $265.9T to $306.3T. Sources - on_course_path.csv (https://world.abundancemachines.si/data/on_course_path.csv) - on_course_range.csv (https://world.abundancemachines.si/data/on_course_range.csv) - mc_world.csv (https://world.abundancemachines.si/data/mc_world.csv) Tier 1 - From baseline to the historical benchmark https://world.abundancemachines.si/guide/tier-1.html The map allocates $28.0T above baseline up to the $318.3T benchmark. The benchmark uses fast growth among countries at similar incomes and checks that method against past periods. Reaching it would require faster expansion than the baseline assumes. The map fixes the baseline and historical benchmark at their separate medians. Subtracting those levels gives $28.0T of Tier 1. In each simulation the model subtracts that run's own levels first. The median of those differences is $30.2T. Measure | Central map case | Middle 80% of simulations | 2035 baseline | $290.2T | $265.9T to $306.3T | 2035 historical pace benchmark | $318.3T | $305.7T to $338.7T | Tier 1 | $28.0T | $8.4T to $56.8T | Tier 2 | $130.3T | $109.8T to $142.8T | Sources - mc_cases.csv (https://world.abundancemachines.si/data/mc_cases.csv) - mc_world.csv (https://world.abundancemachines.si/data/mc_world.csv) - ceiling_final.csv (https://world.abundancemachines.si/data/ceiling_final.csv) Tier 2 - The gap beyond the historical benchmark https://world.abundancemachines.si/guide/tier-2.html The doubling target is $130.3T above the central benchmark. The middle 80% of simulations spans $109.8T to $142.8T. To reach the chosen target above that benchmark, the economy would need ways to produce more with its inputs or scale supply faster. The benchmark is based on past country growth and the model's assumptions. Measure | Central map case | Middle 80% of simulations | 2035 baseline | $290.2T | $265.9T to $306.3T | 2035 historical pace benchmark | $318.3T | $305.7T to $338.7T | Tier 1 | $28.0T | $8.4T to $56.8T | Tier 2 | $130.3T | $109.8T to $142.8T | Sources - mc_cases.csv (https://world.abundancemachines.si/data/mc_cases.csv) - mc_world.csv (https://world.abundancemachines.si/data/mc_world.csv) - summary.md (https://world.abundancemachines.si/data/summary.md) How to read the map https://world.abundancemachines.si/guide/reading-the-map.html The streams carry the central scenario from the world total into the sectors. The red ruler gives input thresholds. Green is added output on the baseline path, blue is Tier 1, and yellow is Tier 2. At the 2035 target the model sets world net exports to zero. The accounting lane shows the signed change and draws ribbons for positive additions. Numbers by the red markers identify the first seven thresholds. Each percentage is the annual growth of the whole world at which that input first runs short. The side panel also lists inputs that only run short in other tests and those with no shortage by the target in any test. Read the input tests (https://world.abundancemachines.si/guide/shortages.html) - Read the methods (https://world.abundancemachines.si/guide/methods.html) How output is divided among sectors https://world.abundancemachines.si/guide/layers.html The map uses the central case and the income elasticity rule for the mix of sectors. Sector | 2026 | Baseline | Tier 1 | Tier 2 | 2035 target | Food at home (https://world.abundancemachines.si/guide/layer-c01.html) | $12.6T | $14.7T | $0.8T | $3.4T | $18.9T | Clothing (https://world.abundancemachines.si/guide/layer-c02.html) | $3.4T | $4.3T | $0.4T | $1.7T | $6.4T | Shelter and utilities (https://world.abundancemachines.si/guide/layer-c03.html) | $29.6T | $38.7T | $3.7T | $17.1T | $59.5T | Household equipment (https://world.abundancemachines.si/guide/layer-c04.html) | $3.8T | $5.0T | $0.5T | $2.2T | $7.6T | Health care (https://world.abundancemachines.si/guide/layer-c05.html) | $23.5T | $32.4T | $3.8T | $18.4T | $54.6T | Mobility (https://world.abundancemachines.si/guide/layer-c06.html) | $8.6T | $11.5T | $1.2T | $5.7T | $18.3T | Communication (https://world.abundancemachines.si/guide/layer-c07.html) | $4.3T | $5.7T | $0.6T | $2.8T | $9.2T | Recreation (https://world.abundancemachines.si/guide/layer-c08.html) | $6.0T | $8.4T | $1.0T | $5.1T | $14.5T | Education (https://world.abundancemachines.si/guide/layer-c09.html) | $16.7T | $21.1T | $1.7T | $7.7T | $30.5T | Food service, lodging (https://world.abundancemachines.si/guide/layer-c10.html) | $6.0T | $8.4T | $1.0T | $4.9T | $14.3T | Personal and financial services (https://world.abundancemachines.si/guide/layer-c11.html) | $15.9T | $22.1T | $2.7T | $13.0T | $37.7T | Public services (https://world.abundancemachines.si/guide/layer-c12.html) | $17.5T | $22.5T | $2.0T | $9.2T | $33.7T | Built structures (https://world.abundancemachines.si/guide/layer-c13.html) | $54.2T | $69.7T | $6.3T | $28.5T | $104.5T | Productive equipment (https://world.abundancemachines.si/guide/layer-c14.html) | $7.1T | $9.1T | $0.8T | $3.7T | $13.6T | Knowledge and software (https://world.abundancemachines.si/guide/layer-c15.html) | $7.2T | $9.3T | $0.8T | $3.8T | $13.9T | Alcohol, tobacco, narcotics (https://world.abundancemachines.si/guide/layer-u1.html) | $3.6T | $4.6T | $0.4T | $1.9T | $6.9T | Net purchases abroad (https://world.abundancemachines.si/guide/layer-u2.html) | -$0.1T | $0B | $0B | $0B | $0B | Inventories (https://world.abundancemachines.si/guide/layer-u3.html) | $2.3T | $2.9T | $0.3T | $1.2T | $4.4T | Net exports (https://world.abundancemachines.si/guide/layer-u4.html) | $2.2T | $0B | $0B | $0B | $0B | Four rules test different sector mixes. The values below each sector's headline show how much the gaps change when the split rule changes. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Food at home https://world.abundancemachines.si/guide/layer-c01.html The central scenario assigns $18.9T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $12.6T | Baseline growth | $2.1T | 2035 baseline | $14.7T | Tier 1 addition | $0.8T | Tier 2 addition | $3.4T | Chosen target | $18.9T | Across four sector rules | Low | High | 2035 target | $13.0T | $25.4T | Tier 1 | -$0.1T | $0.9T | Tier 2 | -$1.7T | $8.2T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Clothing https://world.abundancemachines.si/guide/layer-c02.html The central scenario assigns $6.4T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $3.4T | Baseline growth | $0.9T | 2035 baseline | $4.3T | Tier 1 addition | $0.4T | Tier 2 addition | $1.7T | Chosen target | $6.4T | Across four sector rules | Low | High | 2035 target | $4.4T | $6.8T | Tier 1 | $24B | $0.2T | Tier 2 | $17B | $2.2T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Shelter and utilities https://world.abundancemachines.si/guide/layer-c03.html The central scenario assigns $59.5T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $29.6T | Baseline growth | $9.1T | 2035 baseline | $38.7T | Tier 1 addition | $3.7T | Tier 2 addition | $17.1T | Chosen target | $59.5T | Across four sector rules | Low | High | 2035 target | $41.0T | $67.2T | Tier 1 | $0.4T | $1.9T | Tier 2 | $1.6T | $19.3T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Household equipment https://world.abundancemachines.si/guide/layer-c04.html The central scenario assigns $7.6T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $3.8T | Baseline growth | $1.2T | 2035 baseline | $5.0T | Tier 1 addition | $0.5T | Tier 2 addition | $2.2T | Chosen target | $7.6T | Across four sector rules | Low | High | 2035 target | $5.3T | $8.2T | Tier 1 | $44B | $0.3T | Tier 2 | $0.2T | $2.5T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Health care https://world.abundancemachines.si/guide/layer-c05.html The central scenario assigns $54.6T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $23.5T | Baseline growth | $8.9T | 2035 baseline | $32.4T | Tier 1 addition | $3.8T | Tier 2 addition | $18.4T | Chosen target | $54.6T | Across four sector rules | Low | High | 2035 target | $37.6T | $77.5T | Tier 1 | $0.6T | $1.6T | Tier 2 | $4.3T | $39.0T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Mobility https://world.abundancemachines.si/guide/layer-c06.html The central scenario assigns $18.3T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $8.6T | Baseline growth | $2.9T | 2035 baseline | $11.5T | Tier 1 addition | $1.2T | Tier 2 addition | $5.7T | Chosen target | $18.3T | Across four sector rules | Low | High | 2035 target | $12.6T | $18.3T | Tier 1 | $0.1T | $0.5T | Tier 2 | $0.9T | $6.3T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Communication https://world.abundancemachines.si/guide/layer-c07.html The central scenario assigns $9.2T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $4.3T | Baseline growth | $1.4T | 2035 baseline | $5.7T | Tier 1 addition | $0.6T | Tier 2 addition | $2.8T | Chosen target | $9.2T | Across four sector rules | Low | High | 2035 target | $6.3T | $9.4T | Tier 1 | $73B | $0.3T | Tier 2 | $0.5T | $3.1T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Recreation https://world.abundancemachines.si/guide/layer-c08.html The central scenario assigns $14.5T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $6.0T | Baseline growth | $2.4T | 2035 baseline | $8.4T | Tier 1 addition | $1.0T | Tier 2 addition | $5.1T | Chosen target | $14.5T | Across four sector rules | Low | High | 2035 target | $10.0T | $14.5T | Tier 1 | $0.2T | $0.4T | Tier 2 | $1.4T | $6.0T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Education https://world.abundancemachines.si/guide/layer-c09.html The central scenario assigns $30.5T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $16.7T | Baseline growth | $4.3T | 2035 baseline | $21.1T | Tier 1 addition | $1.7T | Tier 2 addition | $7.7T | Chosen target | $30.5T | Across four sector rules | Low | High | 2035 target | $21.0T | $34.6T | Tier 1 | $79B | $1.5T | Tier 2 | -$5.3T | $10.9T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Food service, lodging https://world.abundancemachines.si/guide/layer-c10.html The central scenario assigns $14.3T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $6.0T | Baseline growth | $2.4T | 2035 baseline | $8.4T | Tier 1 addition | $1.0T | Tier 2 addition | $4.9T | Chosen target | $14.3T | Across four sector rules | Low | High | 2035 target | $7.5T | $14.3T | Tier 1 | $92B | $0.4T | Tier 2 | $1.2T | $5.5T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Personal and financial services https://world.abundancemachines.si/guide/layer-c11.html The central scenario assigns $37.7T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $15.9T | Baseline growth | $6.2T | 2035 baseline | $22.1T | Tier 1 addition | $2.7T | Tier 2 addition | $13.0T | Chosen target | $37.7T | Across four sector rules | Low | High | 2035 target | $19.6T | $37.7T | Tier 1 | $0.2T | $1.1T | Tier 2 | $3.3T | $14.4T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Public services https://world.abundancemachines.si/guide/layer-c12.html The central scenario assigns $33.7T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $17.5T | Baseline growth | $5.0T | 2035 baseline | $22.5T | Tier 1 addition | $2.0T | Tier 2 addition | $9.2T | Chosen target | $33.7T | Across four sector rules | Low | High | 2035 target | $23.2T | $44.9T | Tier 1 | $0.2T | $1.1T | Tier 2 | $0.4T | $17.6T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Built structures https://world.abundancemachines.si/guide/layer-c13.html The central scenario assigns $104.5T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $54.2T | Baseline growth | $15.5T | 2035 baseline | $69.7T | Tier 1 addition | $6.3T | Tier 2 addition | $28.5T | Chosen target | $104.5T | Across four sector rules | Low | High | 2035 target | $65.7T | $197.1T | Tier 1 | $2.2T | $8.5T | Tier 2 | $8.2T | $119.1T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Productive equipment https://world.abundancemachines.si/guide/layer-c14.html The central scenario assigns $13.6T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $7.1T | Baseline growth | $2.0T | 2035 baseline | $9.1T | Tier 1 addition | $0.8T | Tier 2 addition | $3.7T | Chosen target | $13.6T | Across four sector rules | Low | High | 2035 target | $13.6T | $18.9T | Tier 1 | $0.3T | $0.5T | Tier 2 | $4.1T | $10.2T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Knowledge and software https://world.abundancemachines.si/guide/layer-c15.html The central scenario assigns $13.9T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $7.2T | Baseline growth | $2.1T | 2035 baseline | $9.3T | Tier 1 addition | $0.8T | Tier 2 addition | $3.8T | Chosen target | $13.9T | Across four sector rules | Low | High | 2035 target | $13.9T | $23.5T | Tier 1 | $0.2T | $0.5T | Tier 2 | $4.2T | $18.0T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Alcohol, tobacco, narcotics https://world.abundancemachines.si/guide/layer-u1.html The central scenario assigns $6.9T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $3.6T | Baseline growth | $1.0T | 2035 baseline | $4.6T | Tier 1 addition | $0.4T | Tier 2 addition | $1.9T | Chosen target | $6.9T | Across four sector rules | Low | High | 2035 target | $4.8T | $8.6T | Tier 1 | $32B | $0.2T | Tier 2 | $80B | $3.9T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Net purchases abroad https://world.abundancemachines.si/guide/layer-u2.html The central scenario assigns $0B of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | -$0.1T | Baseline growth | $0.1T | 2035 baseline | $0B | Tier 1 addition | $0B | Tier 2 addition | $0B | Chosen target | $0B | Across four sector rules | Low | High | 2035 target | $0B | $0B | Tier 1 | $0B | $0B | Tier 2 | $0B | $0B | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Inventories https://world.abundancemachines.si/guide/layer-u3.html The central scenario assigns $4.4T of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $2.3T | Baseline growth | $0.6T | 2035 baseline | $2.9T | Tier 1 addition | $0.3T | Tier 2 addition | $1.2T | Chosen target | $4.4T | Across four sector rules | Low | High | 2035 target | $2.8T | $4.6T | Tier 1 | $20B | $0.1T | Tier 2 | $50B | $1.9T | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Net exports https://world.abundancemachines.si/guide/layer-u4.html The central scenario assigns $0B of the 2035 world target to this layer. Measure | Annual output or addition | 2026 estimate | $2.2T | Baseline growth | -$2.2T | 2035 baseline | $0B | Tier 1 addition | $0B | Tier 2 addition | $0B | Chosen target | $0B | Across four sector rules | Low | High | 2035 target | $0B | $0B | Tier 1 | $0B | $0B | Tier 2 | $0B | $0B | These bounds compare the four allocation rules at the sector-split step. The map uses the median baseline and benchmark with the elasticity split. Sources - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) Accounting rows https://world.abundancemachines.si/guide/layer-u.html The map combines four small accounting lines into one lane. World net exports and net purchases abroad are set to zero in 2035. Moving net exports to zero reduces baseline growth in this lane. Signed amounts appear in the label, with a ribbon for each positive addition. Alcohol, tobacco, narcotics (https://world.abundancemachines.si/guide/layer-u1.html) Net purchases abroad (https://world.abundancemachines.si/guide/layer-u2.html) Inventories (https://world.abundancemachines.si/guide/layer-u3.html) Net exports (https://world.abundancemachines.si/guide/layer-u4.html) Sources - sector_split.csv (https://world.abundancemachines.si/data/sector_split.csv) Which inputs run short first? https://world.abundancemachines.si/guide/shortages.html The model raises every sector from today toward its target. The threshold is the world growth rate where an input first needs more than its record-pace supply. Input | Central case | Range when it breaks | Runs that break | Evidence | Physical machine labour (robots) (https://world.abundancemachines.si/guide/shortage-k04.html) | 4.3% | 3.4% to 7.9% | 41 / 42 | A | Cropland (https://world.abundancemachines.si/guide/shortage-k22.html) | 4.4% | 1.9% to 7.9% | 41 / 42 | A | Capital stock (https://world.abundancemachines.si/guide/shortage-k21.html) | 5.5% | 4.1% to 6.2% | 36 / 42 | A | Construction trades (https://world.abundancemachines.si/guide/shortage-k17.html) | 6.4% | 1.5% to 6.4% | 36 / 42 | E | Professional licensing (https://world.abundancemachines.si/guide/shortage-k16.html) | 7.7% | 6.3% to 7.8% | 36 / 42 | A | Human workforce (https://world.abundancemachines.si/guide/shortage-k18.html) | 7.9% | 1.2% to 7.9% | 36 / 42 | E | Copper (https://world.abundancemachines.si/guide/shortage-k06.html) | 8.0% | 8.0% to 8.0% | 42 / 42 | E | Electricity (https://world.abundancemachines.si/guide/shortage-k01.html) | No threshold by target | -- | 0 / 42 | A | Fuels (https://world.abundancemachines.si/guide/shortage-k02.html) | No threshold by target | 4.5% to 7.6% | 11 / 42 | E | Machine cognition (AI agents) (https://world.abundancemachines.si/guide/shortage-k03.html) | No threshold by target | -- | 0 / 42 | E | AI compute (https://world.abundancemachines.si/guide/shortage-k05.html) | No threshold by target | -- | 0 / 42 | A | Lithium (https://world.abundancemachines.si/guide/shortage-k07.html) | No threshold by target | -- | 0 / 42 | E | Rare earths (https://world.abundancemachines.si/guide/shortage-k08.html) | No threshold by target | -- | 0 / 42 | E | Steel (https://world.abundancemachines.si/guide/shortage-k09.html) | No threshold by target | 5.5% to 7.9% | 13 / 42 | E | Cement (https://world.abundancemachines.si/guide/shortage-k10.html) | No threshold by target | 5.6% to 8.0% | 10 / 42 | E | Aluminium (https://world.abundancemachines.si/guide/shortage-k20.html) | No threshold by target | -- | 0 / 42 | E | The central case uses the base way of producing. The ranges use six cases and seven production scenarios. Inputs can break in some scenarios and still reach the target in others. Read evidence labels (https://world.abundancemachines.si/guide/evidence.html) - See the seven exclusions (https://world.abundancemachines.si/guide/excluded-inputs.html) Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Physical machine labour (robots) https://world.abundancemachines.si/guide/shortage-k04.html In the central case this input first runs short at 4.3% annual world growth. Input measure | million worker-equivalents in 2035 | Required at the target | 1,223.853 | Baseline supply | 32.773 | Supply at record pace | 42.857 | Record-pace supply covers 3.5% of target need. The input runs short in 41 of 42 tests. Among the runs where it ran short, the threshold was 3.4% to 7.9%. Evidence label A. UNTESTED. Proposed test. Time-and-motion worker-equivalents of deployed humanoids; Counterpoint/IDC 2027 shipments to confirm the ramp Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Cropland https://world.abundancemachines.si/guide/shortage-k22.html In the central case this input first runs short at 4.4% annual world growth. Input measure | million ha of cropland in 2035 | Required at the target | 2,173.379 | Baseline supply | 1,628.046 | Supply at record pace | 1,688.875 | Record-pace supply covers 77.7% of target need. The input runs short in 41 of 42 tests. Among the runs where it ran short, the threshold was 1.9% to 7.9%. Evidence label A. UNTESTED. Proposed test. FAOSTAT crop output per ha and cropland by country 2000-2024, and the EXIOBASE crop footprint per $ of non-food output 1995-2022 (does it fall with income?) Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Capital stock https://world.abundancemachines.si/guide/shortage-k21.html In the central case this input first runs short at 5.5% annual world growth. Input measure | tn 2026 int$ (PPP) of capital stock in 2035 | Required at the target | 2,156.522 | Baseline supply | 1,502.073 | Supply at record pace | 1,748.364 | Record-pace supply covers 81.1% of target need. The input runs short in 36 of 42 tests. Among the runs where it ran short, the threshold was 4.1% to 6.2%. Evidence label A. UNTESTED. Proposed test. PWT 11.0 capital-output ratios by country 1990-2023 for economies growing 5%+ a year (does K/Y fall during fast growth?) Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Construction trades https://world.abundancemachines.si/guide/shortage-k17.html In the central case this input first runs short at 6.4% annual world growth. Input measure | million construction workers (ISIC F) in 2035 | Required at the target | 565.354 | Baseline supply | 380.178 | Supply at record pace | 495.099 | Record-pace supply covers 87.6% of target need. The input runs short in 36 of 42 tests. Among the runs where it ran short, the threshold was 1.5% to 6.4%. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Professional licensing https://world.abundancemachines.si/guide/shortage-k16.html In the central case this input first runs short at 7.7% annual world growth. Input measure | million machine worker-equivalents in 2035 | Required at the target | 1,776.179 | Baseline supply | 1,452.832 | Supply at record pace | 1,614.506 | Record-pace supply covers 90.9% of target need. The input runs short in 36 of 42 tests. Among the runs where it ran short, the threshold was 6.3% to 7.8%. Evidence label A. UNTESTED. Proposed test. OECD/EU cross-country licensing incidence; legal mapping of which tasks require a licensed person Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Human workforce https://world.abundancemachines.si/guide/shortage-k18.html In the central case this input first runs short at 7.9% annual world growth. Input measure | million workers in 2035 | Required at the target | 4,343.511 | Baseline supply | 4,023.24 | Supply at record pace | 4,316.6 | Record-pace supply covers 99.4% of target need. The input runs short in 36 of 42 tests. Among the runs where it ran short, the threshold was 1.2% to 7.9%. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Copper https://world.abundancemachines.si/guide/shortage-k06.html In the central case this input first runs short at 8.0% annual world growth. Input measure | million t refined copper per year | Required at the target | 50.888 | Baseline supply | 26.511 | Supply at record pace | 45.427 | Record-pace supply covers 89.3% of target need. The input runs short in 42 of 42 tests. Among the runs where it ran short, the threshold was 8.0% to 8.0%. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Electricity https://world.abundancemachines.si/guide/shortage-k01.html This input reaches the doubling target in the central case at its record pace. Input measure | TWh per year (gross generation) | Required at the target | 74,392.597 | Baseline supply | 44,274 | Supply at record pace | 93,251.9 | Record-pace supply covers 125.4% of target need. The input runs short in 0 of 42 tests. Evidence label A. UNTESTED. Proposed test. IEA WEO-2026 Annex A (STEPS generation 2035) and Ember monthly 2026 generation; IEA World Energy Balances by final-demand sector to replace the EXIOBASE monetary electricity multiplier Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Fuels https://world.abundancemachines.si/guide/shortage-k02.html This input reaches the doubling target in the central case at its record pace. Input measure | EJ per year (final consumption excl. electricity) | Required at the target | 447.271 | Baseline supply | 374 | Supply at record pace | 548.836 | Record-pace supply covers 122.7% of target need. The input runs short in 11 of 42 tests. Among the runs where it ran short, the threshold was 4.5% to 7.6%. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Machine cognition (AI agents) https://world.abundancemachines.si/guide/shortage-k03.html This input reaches the doubling target in the central case at its record pace. Input measure | million worker-equivalents in 2035 | Required at the target | 552.326 | Baseline supply | 310.266 | Supply at record pace | 45,732.6 | Record-pace supply covers 8280.0% of target need. The input runs short in 0 of 42 tests. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) AI compute https://world.abundancemachines.si/guide/shortage-k05.html This input reaches the doubling target in the central case at its record pace. Input measure | GW of AI chip TDP in service in 2035 | Required at the target | 150.431 | Baseline supply | 84.504 | Supply at record pace | 12,455.7 | Record-pace supply covers 8280.0% of target need. The input runs short in 0 of 42 tests. Evidence label A. UNTESTED. Proposed test. Epoch chip-sales update for 2027-28; TSMC CoWoS and HBM capacity plans to 2030 Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Lithium https://world.abundancemachines.si/guide/shortage-k07.html This input reaches the doubling target in the central case at its record pace. Input measure | kt lithium content per year | Required at the target | 1,207.787 | Baseline supply | 452.919 | Supply at record pace | 2,301.24 | Record-pace supply covers 190.5% of target need. The input runs short in 0 of 42 tests. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Rare earths https://world.abundancemachines.si/guide/shortage-k08.html This input reaches the doubling target in the central case at its record pace. Input measure | kt magnet rare earth elements per year | Required at the target | 212.897 | Baseline supply | 136.357 | Supply at record pace | 709.648 | Record-pace supply covers 333.3% of target need. The input runs short in 0 of 42 tests. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Steel https://world.abundancemachines.si/guide/shortage-k09.html This input reaches the doubling target in the central case at its record pace. Input measure | Mt crude steel per year | Required at the target | 2,888.399 | Baseline supply | 2,570.4 | Supply at record pace | 3,135.54 | Record-pace supply covers 108.6% of target need. The input runs short in 13 of 42 tests. Among the runs where it ran short, the threshold was 5.5% to 7.9%. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Cement https://world.abundancemachines.si/guide/shortage-k10.html This input reaches the doubling target in the central case at its record pace. Input measure | Mt cement per year | Required at the target | 5,543.658 | Baseline supply | 5,428.57 | Supply at record pace | 7,528.7 | Record-pace supply covers 135.8% of target need. The input runs short in 10 of 42 tests. Among the runs where it ran short, the threshold was 5.6% to 8.0%. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Aluminium https://world.abundancemachines.si/guide/shortage-k20.html This input reaches the doubling target in the central case at its record pace. Input measure | Mt aluminium per year | Required at the target | 209.054 | Baseline supply | 137 | Supply at record pace | 330.48 | Record-pace supply covers 158.1% of target need. The input runs short in 0 of 42 tests. Evidence label E. TESTED. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) Saving for investment https://world.abundancemachines.si/guide/shortage-k11.html V5 lists this item separately from the input thresholds. Accounting identity (v4: saving = investment at market prices). Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-k11.html) Building permission https://world.abundancemachines.si/guide/shortage-k12.html V5 lists this item separately from the input thresholds. Its need equals the output of layer c13 at every test point | its supply is in bn of c13 output: that layer's own record output. Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-k12.html) Grid connection approval https://world.abundancemachines.si/guide/shortage-k13.html V5 lists this item separately from the input thresholds. Its need equals the need of k01 at every test point (a copy; the first is kept). Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-k13.html) Transformers and grid equipment https://world.abundancemachines.si/guide/shortage-k14.html V5 lists this item separately from the input thresholds. Its need equals the need of k01, k13 at every test point (a copy; the first is kept). Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-k14.html) Clinical approval https://world.abundancemachines.si/guide/shortage-k15.html V5 lists this item separately from the input thresholds. Its need equals the output of layer c05 at every test point | its supply is in bn of c05 output: that layer's own record output. Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-k15.html) Buyers for built structures https://world.abundancemachines.si/guide/shortage-buy-c13.html V5 lists this item separately from the input thresholds. Its need equals the output of layer c13 at every test point | its need equals the need of k12 at every test point (a copy; the first is kept) | compares buyers' demand with the layer's target. Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-buy-c13.html) Buyers for public services https://world.abundancemachines.si/guide/shortage-buy-c12.html V5 lists this item separately from the input thresholds. Its need equals the output of layer c12 at every test point | compares buyers' demand with the layer's target. Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) See the v4 explanation (https://world.abundancemachines.si/archive/v4/guide/shortage-buy-c12.html) Seven items listed separately https://world.abundancemachines.si/guide/excluded-inputs.html V5 ranks physical inputs and resources alongside labour and capital. Saving for investment (https://world.abundancemachines.si/guide/shortage-k11.html) Building permission (https://world.abundancemachines.si/guide/shortage-k12.html) Grid connection approval (https://world.abundancemachines.si/guide/shortage-k13.html) Transformers and grid equipment (https://world.abundancemachines.si/guide/shortage-k14.html) Clinical approval (https://world.abundancemachines.si/guide/shortage-k15.html) Buyers for built structures (https://world.abundancemachines.si/guide/shortage-buy-c13.html) Buyers for public services (https://world.abundancemachines.si/guide/shortage-buy-c12.html) Sources - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) What the evidence labels mean https://world.abundancemachines.si/guide/evidence.html Each label describes how the recorded number was obtained. Label | Meaning | S | Read from a source | E | Estimated from sourced numbers | A | Assumption to test | Open an input to see the model's proposed test for an assumed threshold. Scenario counts describe the cases run by the model. Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - sources.csv (https://world.abundancemachines.si/data/sources.csv) How the model tests uncertainty https://world.abundancemachines.si/guide/scenarios.html V5 draws 20,000 combinations for the output estimates and tests input thresholds in 42 cases. Measure | Central map case | Middle 80% of simulations | 2035 baseline | $290.2T | $265.9T to $306.3T | 2035 historical pace benchmark | $318.3T | $305.7T to $338.7T | Tier 1 | $28.0T | $8.4T to $56.8T | Tier 2 | $130.3T | $109.8T to $142.8T | The map fixes the baseline and historical benchmark at their separate medians. Subtracting those levels gives $28.0T of Tier 1. In each simulation the model subtracts that run's own levels first. The median of those differences is $30.2T. Output simulations vary IMF errors, historical growth benchmarks, and sector allocations. The input grid combines six output cases with seven production scenarios. Scenario ranges and simulation percentiles summarize those different exercises. Sources - mc_world.csv (https://world.abundancemachines.si/data/mc_world.csv) - mc_sensitivity.csv (https://world.abundancemachines.si/data/mc_sensitivity.csv) - mc_cases.csv (https://world.abundancemachines.si/data/mc_cases.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) How v7 works https://world.abundancemachines.si/guide/methods.html v7 starts from the stage1-v5 map and asks, for any idea at a price, how much of the gap it would fill and what stops it. Each idea is described only as changes to model numbers: a demand curve, a recipe (input per unit of output), a supply, a removed cap. The machine then takes the smaller of two answers. What people buy (path a): on course, plus the saving on units bought anyway, plus the extra units bought as the price falls, valued at the average of the old and new price. What every input allows (path b): every layer raised toward its 2035 target in equal steps, until the first input passes its record-pace supply. The smaller one is what limits the result. Each result is the median across 1,000 stage1-v5 simulation draws. Its 80% range also covers the idea's own key numbers (within their stated range, or a band by label) and the starting numbers both ways. Three ways an idea's price fall is valued: a cheaper way to make each unit (cost), more units of an input that cost resources to make (supply, net of their cost), and more units that use nothing else (supply, gross). Only the share of buyers with the idea in 2035 takes it up. Testing the starting numbers and the arithmetic (https://world.abundancemachines.si/guide/tests.html) The benchmark on past cases (https://world.abundancemachines.si/guide/benchmark.html) Pitching an idea (https://world.abundancemachines.si/guide/pitch.html) The stage1-v5 layers v7 starts from (https://world.abundancemachines.si/guide/layers.html) The stage1-v5 input thresholds v7 reproduces (https://world.abundancemachines.si/guide/shortages.html) Uncertainty in the starting numbers (https://world.abundancemachines.si/guide/scenarios.html) Every choice and why (decisions.md) (https://github.com/sukanthoriginal/abundance-machines-v2/blob/stage1-v7/stage1-v7/decisions.md) Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) Which input thresholds come first? https://world.abundancemachines.si/guide/picks.html The model raises every sector from today toward its target. The threshold is the world growth rate where an input first needs more than its record-pace supply. Input | Central case | Range when it breaks | Runs that break | Evidence | Physical machine labour (robots) (https://world.abundancemachines.si/guide/shortage-k04.html) | 4.3% | 3.4% to 7.9% | 41 / 42 | A | Cropland (https://world.abundancemachines.si/guide/shortage-k22.html) | 4.4% | 1.9% to 7.9% | 41 / 42 | A | Capital stock (https://world.abundancemachines.si/guide/shortage-k21.html) | 5.5% | 4.1% to 6.2% | 36 / 42 | A | Construction trades (https://world.abundancemachines.si/guide/shortage-k17.html) | 6.4% | 1.5% to 6.4% | 36 / 42 | E | Professional licensing (https://world.abundancemachines.si/guide/shortage-k16.html) | 7.7% | 6.3% to 7.8% | 36 / 42 | A | Human workforce (https://world.abundancemachines.si/guide/shortage-k18.html) | 7.9% | 1.2% to 7.9% | 36 / 42 | E | Copper (https://world.abundancemachines.si/guide/shortage-k06.html) | 8.0% | 8.0% to 8.0% | 42 / 42 | E | Electricity (https://world.abundancemachines.si/guide/shortage-k01.html) | No threshold by target | -- | 0 / 42 | A | Fuels (https://world.abundancemachines.si/guide/shortage-k02.html) | No threshold by target | 4.5% to 7.6% | 11 / 42 | E | Machine cognition (AI agents) (https://world.abundancemachines.si/guide/shortage-k03.html) | No threshold by target | -- | 0 / 42 | E | AI compute (https://world.abundancemachines.si/guide/shortage-k05.html) | No threshold by target | -- | 0 / 42 | A | Lithium (https://world.abundancemachines.si/guide/shortage-k07.html) | No threshold by target | -- | 0 / 42 | E | Rare earths (https://world.abundancemachines.si/guide/shortage-k08.html) | No threshold by target | -- | 0 / 42 | E | Steel (https://world.abundancemachines.si/guide/shortage-k09.html) | No threshold by target | 5.5% to 7.9% | 13 / 42 | E | Cement (https://world.abundancemachines.si/guide/shortage-k10.html) | No threshold by target | 5.6% to 8.0% | 10 / 42 | E | Aluminium (https://world.abundancemachines.si/guide/shortage-k20.html) | No threshold by target | -- | 0 / 42 | E | Sources - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) Data and model sources https://world.abundancemachines.si/guide/sources.html These outputs are from the Stage 1 v7 calculation and the stage1-v5 files it starts from. v7 - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/pairs.csv (https://world.abundancemachines.si/data/v7/results/pairs.csv) - results/profit.csv (https://world.abundancemachines.si/data/v7/results/profit.csv) - results/knockons.csv (https://world.abundancemachines.si/data/v7/results/knockons.csv) - results/value_beyond.csv (https://world.abundancemachines.si/data/v7/results/value_beyond.csv) - results/no_capability.csv (https://world.abundancemachines.si/data/v7/results/no_capability.csv) - results/sources.csv (https://world.abundancemachines.si/data/v7/results/sources.csv) - retro/results.csv (https://world.abundancemachines.si/data/v7/retro/results.csv) - retro/known.csv (https://world.abundancemachines.si/data/v7/retro/known.csv) - retro/contamination.csv (https://world.abundancemachines.si/data/v7/retro/contamination.csv) - scorecard.csv (https://world.abundancemachines.si/data/v7/scorecard.csv) - published.csv (https://world.abundancemachines.si/data/v7/published.csv) - MANIFEST.csv (https://world.abundancemachines.si/data/v7/MANIFEST.csv) - numbers_a1.csv (https://world.abundancemachines.si/data/v7/numbers_a1.csv) - input_prices.csv (https://world.abundancemachines.si/data/v7/input_prices.csv) - checks/a2_tests.csv (https://world.abundancemachines.si/data/v7/checks/a2_tests.csv) - checks/a2_replacements.csv (https://world.abundancemachines.si/data/v7/checks/a2_replacements.csv) - checks/a4_breaking_points.csv (https://world.abundancemachines.si/data/v7/checks/a4_breaking_points.csv) - checks/a5_toys.csv (https://world.abundancemachines.si/data/v7/checks/a5_toys.csv) - checks/d_js_python.csv (https://world.abundancemachines.si/data/v7/checks/d_js_python.csv) - pitch/consistency.csv (https://world.abundancemachines.si/data/v7/pitch/consistency.csv) - pitch/quick_band.csv (https://world.abundancemachines.si/data/v7/pitch/quick_band.csv) - pitch/consistency_diffs.csv (https://world.abundancemachines.si/data/v7/pitch/consistency_diffs.csv) - pitch/consistency_repeat.csv (https://world.abundancemachines.si/data/v7/pitch/consistency_repeat.csv) - pitch/redteam.csv (https://world.abundancemachines.si/data/v7/pitch/redteam.csv) - pitch/source_check.csv (https://world.abundancemachines.si/data/v7/pitch/source_check.csv) - pitch/research.md (https://world.abundancemachines.si/data/v7/pitch/research.md) - pitch/translate.md (https://world.abundancemachines.si/data/v7/pitch/translate.md) - pitch/model_ids.md (https://world.abundancemachines.si/data/v7/pitch/model_ids.md) - capabilities/_template.yaml (https://world.abundancemachines.si/data/v7/capabilities/_template.yaml) - capabilities/ai_office_agents.yaml (https://world.abundancemachines.si/data/v7/capabilities/ai_office_agents.yaml) - capabilities/cancer_cure_cheap.yaml (https://world.abundancemachines.si/data/v7/capabilities/cancer_cure_cheap.yaml) - capabilities/clinical_approval_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/clinical_approval_fast.yaml) - capabilities/construction_efficient.yaml (https://world.abundancemachines.si/data/v7/capabilities/construction_efficient.yaml) - capabilities/electricity_cheap.yaml (https://world.abundancemachines.si/data/v7/capabilities/electricity_cheap.yaml) - capabilities/grid_equipment_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/grid_equipment_fast.yaml) - capabilities/moon_travel_100.yaml (https://world.abundancemachines.si/data/v7/capabilities/moon_travel_100.yaml) - capabilities/permits_grid_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/permits_grid_fast.yaml) - capabilities/robots_general.yaml (https://world.abundancemachines.si/data/v7/capabilities/robots_general.yaml) - capabilities/trades_training_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/trades_training_fast.yaml) Sources - compare_v4.csv (https://world.abundancemachines.si/data/compare_v4.csv) - mc_cases.csv (https://world.abundancemachines.si/data/mc_cases.csv) - mc_world.csv (https://world.abundancemachines.si/data/mc_world.csv) - sector_split.csv (https://world.abundancemachines.si/data/sector_split.csv) - sector_ranges.csv (https://world.abundancemachines.si/data/sector_ranges.csv) - layers_v5_median.csv (https://world.abundancemachines.si/data/layers_v5_median.csv) - breaking_points.csv (https://world.abundancemachines.si/data/breaking_points.csv) - inputs_v5.csv (https://world.abundancemachines.si/data/inputs_v5.csv) - not_inputs.csv (https://world.abundancemachines.si/data/not_inputs.csv) - shortages_v5.csv (https://world.abundancemachines.si/data/shortages_v5.csv) - on_course_path.csv (https://world.abundancemachines.si/data/on_course_path.csv) - on_course_range.csv (https://world.abundancemachines.si/data/on_course_range.csv) - ceiling_final.csv (https://world.abundancemachines.si/data/ceiling_final.csv) - mc_sensitivity.csv (https://world.abundancemachines.si/data/mc_sensitivity.csv) - checks_v5.csv (https://world.abundancemachines.si/data/checks_v5.csv) - sources.csv (https://world.abundancemachines.si/data/sources.csv) Model source on GitHub (https://github.com/sukanthoriginal/abundance-machines-v2/tree/stage1-v7/stage1-v7) Ask your own AI https://world.abundancemachines.si/guide/ask.html Share the reading index or paste the ready-made prompt into your assistant. A prompt you can copyRead https://world.abundancemachines.si/llms.txt for the Stage 1 v7 guide and source tables: the economic machine, which asks how much of the gap to doubling world output by 2035 an idea would fill at a given price, what limits it and which input runs short next. For full context use https://world.abundancemachines.si/llms-full.txt. For calculations use https://world.abundancemachines.si/data/model.json and the CSVs linked in the manifest. Explain the answer in plain English. Cite the file, row and units. Separate the median across the 1,000 simulation draws and its 80% range from the single median-economy receipt. Keep the evidence labels ([S] sourced, [E] estimated, [A] assumed), the trust badge and the benchmark on past cases explicit. My question is: Copy promptReading index (https://world.abundancemachines.si/llms.txt) Full context (https://world.abundancemachines.si/llms-full.txt) Model JSON (https://world.abundancemachines.si/data/model.json) Source manifest (https://world.abundancemachines.si/data/manifest.json) Download the context (https://world.abundancemachines.si/context.zip) Ten starter ideas, ranked https://world.abundancemachines.si/guide/ideas.html Each idea at its reference price: the share of the gap it fills, what limits it and which input runs short next. # | Idea | Share of the gap, median (80% range) | $ a year | Runs short next (share of the 1,000 runs) | Limit | Trust | Rank on sourced numbers alone | 1 | AI agents doing most office work (https://world.abundancemachines.si/guide/idea-ai-office-agents.html) | 6.7% (0.0% to 22.0%) | $10.9T | Cropland (69.3%) | buyers | low | 9 | 2 | Construction with far less labour and material per building (https://world.abundancemachines.si/guide/idea-construction-efficient.html) | 0.48% (0.0% to 4.1%) | $0.8T | Cropland (57.6%); middle case: Physical machine labour (robots) | buyers | low | 1 | 3 | A cheap cure for most cancers (https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html) | 0.35% (0.0% to 1.1%) | $0.6T | Cropland (53.7%); middle case: Physical machine labour (robots) | buyers | low | 2 | 4 | Much faster building permits and grid connections (https://world.abundancemachines.si/guide/idea-permits-grid-fast.html) | 0.18% (0.0% to 1.1%) | $0.3T | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 3 | 5 | Human-level general-purpose robots (https://world.abundancemachines.si/guide/idea-robots-general.html) | 0.11% (0.0% to 0.24%) | $0.2T | Cropland (54.8%); middle case: Physical machine labour (robots) | buyers | low | 9 | 6 | Electricity at a fraction of today's cost (https://world.abundancemachines.si/guide/idea-electricity-cheap.html) | 0.08% (0.0% to 0.17%) | $0.1T | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 4 | 7 | Transformers and grid equipment built far faster (https://world.abundancemachines.si/guide/idea-grid-equipment-fast.html) | 0.01% (0.0% to 0.05%) | $18B | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 6 | 8 | Much faster clinical approval (https://world.abundancemachines.si/guide/idea-clinical-approval-fast.html) | 0.01% (0.0% to 0.03%) | $16B | Cropland (52.6%); middle case: Physical machine labour (robots) | buyers | low | 5 | 9 | Tradespeople trained far faster (https://world.abundancemachines.si/guide/idea-trades-training-fast.html) | 0.01% (0.0% to 0.06%) | $9B | Cropland (52.7%); middle case: Physical machine labour (robots) | buyers | low | 7 | 10 | Moon travel at $100 a trip (https://world.abundancemachines.si/guide/idea-moon-travel-100.html) | 0.00% (0.0% to 0.06%) | $2B | Cropland (51.9%); middle case: Physical machine labour (robots) | buyers | low | 8 | Pairs of the top five Pair | Share of the gap together (80% range) | Together minus apart | Relation | Unlocks | Runs short next | AI agents doing most office work (https://world.abundancemachines.si/guide/idea-ai-office-agents.html) + Construction with far less labour and material per building (https://world.abundancemachines.si/guide/idea-construction-efficient.html) | 26.1% (0.0% to 23.2%) | -$0B | add up | | Cropland | AI agents doing most office work (https://world.abundancemachines.si/guide/idea-ai-office-agents.html) + A cheap cure for most cancers (https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html) | 25.7% (0.0% to 20.1%) | $0B | add up | | Cropland | AI agents doing most office work (https://world.abundancemachines.si/guide/idea-ai-office-agents.html) + Much faster building permits and grid connections (https://world.abundancemachines.si/guide/idea-permits-grid-fast.html) | 25.4% (0.0% to 21.6%) | $0B | add up | | Cropland | AI agents doing most office work (https://world.abundancemachines.si/guide/idea-ai-office-agents.html) + Human-level general-purpose robots (https://world.abundancemachines.si/guide/idea-robots-general.html) | 25.2% (0.0% to 20.0%) | $0B | add up | | Cropland | Construction with far less labour and material per building (https://world.abundancemachines.si/guide/idea-construction-efficient.html) + A cheap cure for most cancers (https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html) | 1.7% (0.0% to 4.3%) | $0B | add up | | Physical machine labour (robots) | Construction with far less labour and material per building (https://world.abundancemachines.si/guide/idea-construction-efficient.html) + Much faster building permits and grid connections (https://world.abundancemachines.si/guide/idea-permits-grid-fast.html) | 1.4% (0.0% to 4.4%) | -$0B | add up | | Physical machine labour (robots) | Construction with far less labour and material per building (https://world.abundancemachines.si/guide/idea-construction-efficient.html) + Human-level general-purpose robots (https://world.abundancemachines.si/guide/idea-robots-general.html) | 1.2% (0.0% to 3.8%) | -$0B | add up | | Physical machine labour (robots) | A cheap cure for most cancers (https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html) + Much faster building permits and grid connections (https://world.abundancemachines.si/guide/idea-permits-grid-fast.html) | 0.94% (0.0% to 1.7%) | $0B | add up | | Physical machine labour (robots) | A cheap cure for most cancers (https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html) + Human-level general-purpose robots (https://world.abundancemachines.si/guide/idea-robots-general.html) | 0.76% (0.0% to 1.2%) | $0B | add up | | Physical machine labour (robots) | Much faster building permits and grid connections (https://world.abundancemachines.si/guide/idea-permits-grid-fast.html) + Human-level general-purpose robots (https://world.abundancemachines.si/guide/idea-robots-general.html) | 0.49% (0.0% to 1.1%) | $0B | add up | | Physical machine labour (robots) | A pair overlaps when together it fills less than the two apart, needs each other when more, and adds up otherwise. A pair never counts shared output twice. Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/pairs.csv (https://world.abundancemachines.si/data/v7/results/pairs.csv) AI agents doing most office work https://world.abundancemachines.si/guide/idea-ai-office-agents.html AI agents that can do four-fifths of office (cognitive, ISCO 1-4) tasks at the quality of a trained worker, sold from 2028 at $5,000 per worker-year of office work (about $2.35 an hour), against $63,247 a year (about $29.70 an hour) for a human office worker in 2035. Result Measure | Value | Share of the gap filled, median across the draws | 6.7% | 80% range | 0.0% to 22.0% | Dollars a year in 2035 (median) | $10.9T | Growth points a year (median) | 0.44 | Median economy, the entry as written | 25.0%: $28.0T tier 1, $11.6T tier 2 | What people buy (path a), above on course | $39.7T | What inputs allow (path b), above on course | $41.6T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 69.3%; Construction trades in 27.9%; Physical machine labour (robots) in 2.8% | Runs short next, middle case (the receipt) | Cropland, then Physical machine labour (robots) | Share of its market using it in 2035 | 28.9% | Price against the next-best option | 5,000 against 63,247 (2026 int$ per worker-year of office (cognitive) work) | Value to people beyond measured GDP (not added) | $0.7T | Possible extra from unsourced knock-ons (not added) | $0B | Starting numbers both ways (A2): stage1-v5 / replaced | 25.0% / 25.0% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (8 of 10 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | ai_office_agents d1: supply_net on K03 (worker-years of office (cognitive) work a year) | 998,805,096 | 3,275,954,980 | 63,247 | 5,000 | $39.7T | b | ai_office_agents ch1: supply K03 | | | | | | b | ai_office_agents ch2: task_split | | | | | | result | path (a) on course + gains | | | | | $329.9T | result | path (b) most output before K22 passes its record-pace supply | | | | | $331.8T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $39.7T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 26.3% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 26.3% | 5.0% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | demand[0].elasticity | A | 8.5% | 26.3% | [A] now. Settled by a study of how much more people buy as the price falls, measured over this price range. | For the profit-machine: gross value added in 2035 $9.7T; price against the next-best option 7.9%; capital per dollar of output 2. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 63,247 | 0.0% (0.0% to 0.0%) | buyers | Cropland | no | 50,597 | 0.17% (0.0% to 0.93%) | buyers | Cropland | no | 37,948 | 0.84% (0.0% to 4.4%) | buyers | Cropland | yes | 25,299 | 2.4% (0.0% to 10.8%) | buyers | Cropland | yes | 15,812 | 4.2% (0.0% to 17.1%) | buyers | Cropland | yes | 9,487 | 5.6% (0.0% to 20.6%) | buyers | Cropland | yes | 6,325 | 6.4% (0.0% to 21.4%) | buyers | Cropland | yes | 5,000 | 6.7% (0.0% to 22.0%) | buyers | Cropland | yes | 3,162 | 7.2% (0.0% to 22.2%) | inputs | Cropland | yes | 1,265 | 7.4% (0.0% to 22.8%) | inputs | Cropland | yes | 632 | 7.5% (0.0% to 23.0%) | inputs | Cropland | yes | 63.2 | 7.6% (0.0% to 23.1%) | inputs | Cropland | yes | The research agent's comparison with published estimates # ai_office_agents: comparison with published estimates **Machine (world, 2035, $5,000 against $63,247 per worker-year):** median across draws $10.9T a year, which is 3.8% of on-course world GDP ($290.2T) and 0.44 growth points a year (80% range $0-37.1T). With the entry as written it is $39.7T (13.7%). **Scaling:** I apply each percentage to 2035 world GDP, compound growth rates over 2026-2035, and take GDP as TFP / 2/3. Only the IMF figure is saved. The rest come from snippets only: unsaved, strength 3 at best. | Estimate | Their figure | Machine's scale | Machine median / it | |---|---|---|---| | IMF WEO 2026 (saved) | TFP +0.8% in 10 yrs; upside +0.1-0.8 pt/yr | $3.5T; upside $2.6-21.5T | 3.1x | | Acemoglu 2025 | US GDP ~1% in 10 yrs | $3.2T | 3.4x | | OECD 2024 | US labour productivity +0.4-0.9 pt/yr | $10.6-24.4T | 0.45-1.0x | | PWBM 2025 | US GDP +1.5% by 2035 | $4.4T | 2.5x | | Humlum-Vestergaard 2025 (after the fact) | chatbots: 3% time saved, no earnings effect | - | - | | IMF SDN 2024; ILO 2025 | 40% / 25% of jobs exposed | machine automates ~6% of all work | - | | PwC 2025 (new) | world +15% by 2035; 8% low-trust; 1% pessimistic | $43.5T / $23.2T / $2.9T | 0.25x / 0.47x / 3.8x | | Goldman 2023 | world +7% in 10 yrs | $20.3T | 0.54x | | Oxford Economics (new) | +0.6 pt/yr world growth (2030s) | - | 0.7x | | Aghion-Bunel 2024 | +0.8-1.3 pt/yr | $21-36T | 0.3-0.5x | | McKinsey 2023 | +0.1-0.6 pt/yr | $2.6-16T | 0.7-4x | | RAND 2025 (new) | agents add 2.6-3.8 pt/yr, to 2045 | - | ~0.15x | | Epoch GATE 2025 | 12%/yr growth at 40% of tasks automated | - | - | ## Gaps over 2x **IMF, Acemoglu, PWBM:** machine median 2.5-3.4x higher; as written 9-12x. - **Price and capability.** These studies value today's AI, profitable on few tasks. The entry has agents doing 80% of office tasks at 8% of the wage from 2028. - **A channel they lack.** They count savings on existing work. The machine lets buyers more than triple the office work bought (999 to 3,276 million worker-years). Its elasticity is measured at 0.7-1.3 times the wage but used 9x below that range, and the only stop is the assumed one-agent-per-person limit. All $39.7T comes from those extra units. - **Spread.** The machine's 80% range reaches $0, like the Danish finding and PwC's pessimistic case. - **Bottleneck.** No estimate limits chips or power. The machine's chip sales grow 50% a year, beyond the IEA outlook, but its demand limit binds first. **RAND, GATE:** 7x or more above the machine. - They automate R&D and reinvest in compute, a channel the machine lacks. - They also assume most tasks are automated. ## Which I trust more **For the likely 2035 effect:** IMF, Acemoglu and OECD. They rest on measured exposure and savings, as does the one after-the-fact study (small effects). The machine rests on 8 of 10 assumed key numbers and an extrapolated elasticity; its trust is low. **If the pitch's capability arrives:** the machine's median sits mid-range among the forward-looking estimates (OECD, Goldman, PwC's middle case, Oxford Economics). The as-written 13.7% is an upper bound that only PwC's top case reaches. Sources Source | Strength | Saved copy | stage1-v7/input_prices.csv, row WAGE_COG (model file built from ILO earnings and employmen (https://sdmx.ilo.org/rest/data/ILO,DF_EAR_EMTA_SEX_OCU_CUR_NB,1.0/) | 1 | yes | Epoch AI, Data on AI chip sales, timelines_by_chip.csv (copy of stage1-v2/v1/agent4_bottle (https://epoch.ai/data/ai_chip_sales.zip) | 3 | yes | METR, METR-Horizon-v1.1 benchmark results (copy of stage1-v2/v1/agent1_frontier/raw/metr_t (https://metr.org/assets/benchmark_results_1_1.yaml) | 3 | yes | Electric car sales (IEA Global EV Outlook via Our World in Data) (copy of stage1-v2/v1/age (https://ourworldindata.org/grapher/electric-car-sales.csv?v=1&csvType=full&useColumnShortNames=true) | 1 | yes | IEA, World Energy Outlook 2025, chapter 1 (copy of stage1-v2/agent4_bottlenecks/raw/iea_we (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 2 | yes | UN World Population Prospects 2024, population by five-year age group, medium variant: Wor (https://population.un.org/wpp/assets/Excel%20Files/1_Indicator%20(Standard)/CSV_FILES/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) | 2 | yes | IMF, World Economic Outlook October 2026, Chapter 1, Box 1.2 scenario A (copy of stage1-v2 (https://www.imf.org/-/media/files/publications/weo/2026/october/english/ch1.pdf) | 2 | yes | IMF, World Economic Outlook October 2026, Chapter 1, upside risks (same saved copy) (https://www.imf.org/-/media/files/publications/weo/2026/october/english/ch1.pdf) | 2 | yes | Data-centre construction cost per MW (search-result summary of contractor and broker bench (https://www.datacentres.com/guides/data-centre-costs-explained) | 3 | search only | US Census Bureau, Business Trends and Outlook Survey: AI use by firms (search-result summa (https://census.gov/library/stories/2026/05/ai-use-businesses.html) | 1 | search only | Bick, Blandin and Deming, The Rapid Adoption of Generative AI, NBER Working Paper 32966 (s (https://www.nber.org/system/files/working_papers/w32966/w32966.pdf) | 2 | search only | Katz and Murphy (1992), Changes in relative wages, 1963-1987, QJE (as summarised in a sear (https://www.cesifo.org/DocDL/cesifo1_wp9212.pdf) | 1 | search only | Card (2009), Immigration and Inequality, AER Papers and Proceedings (search-result summary (https://davidcard.berkeley.edu/papers/immigration-and-inequality.pdf) | 1 | search only | Nordhaus (2021), Are We Approaching an Economic Singularity? Information Technology and th (https://www.nber.org/papers/w21547) | 1 | search only | Eloundou, Manning, Mishkin and Rock, GPTs are GPTs (arXiv 2303.10130; Science 2024) (searc (https://arxiv.org/abs/2303.10130) | 2 | search only | Collis and Brynjolfsson, AI's overlooked $97 billion contribution to the economy, WSJ 2025 (https://www.escoe.ac.uk/media/wall-street-journal-ais-overlooked-97-billion-contribution-to-the-economy/) | 3 | search only | Acemoglu, The Simple Macroeconomics of AI, Economic Policy 40(121), 2025 (NBER w32487) (se (https://econpapers.repec.org/RePEc:oup:ecpoli:v:40:y:2025:i:121:p:13-58.) | 2 | search only | Filippucci, Gal and Schief, Miracle or Myth? Assessing the macroeconomic productivity gain (https://oecdecoscope.blog/2024/11/26/miracle-or-myth-assessing-the-macroeconomic-productivity-gains-from-artificial-intelligence/) | 2 | search only | Penn Wharton Budget Model, The Projected Impact of Generative AI on Future Productivity Gr (https://budgetmodel.wharton.upenn.edu/issues/2025/9/8/projected-impact-of-generative-ai-on-future-productivity-growth) | 3 | search only | Aghion and Bunel, AI and Growth: Where Do We Stand? (2024); quote from the Aghion, Bunel a (https://www.gulf-times.com/article/698589/opinion/what-ai-means-for-growth-and-jobs) | 3 | search only | Goldman Sachs Research, Generative AI could raise global GDP by 7% (2023) (search-result s (https://www.goldmansachs.com/insights/articles/generative-ai-could-raise-global-gdp-by-7-percent) | 3 | search only | McKinsey, The economic potential of generative AI: The next productivity frontier (2023) ( (https://www.mckinsey.com/capabilities/tech-and-ai/our-insights/the-economic-potential-of-generative-ai-the-next-productivity-frontier) | 3 | search only | Epoch AI, GATE: An Integrated Assessment Model for AI Automation (arXiv 2503.04941) and fo (https://epoch.ai/blog/ai-and-explosive-growth-redux) | 3 | search only | Humlum and Vestergaard, Large Language Models, Small Labor Market Effects, NBER Working Pa (https://bfi.uchicago.edu/wp-content/uploads/2025/04/BFI_WP_2025-56-3.pdf) | 2 | search only | Cazzaniga and others, Gen-AI: Artificial Intelligence and the Future of Work, IMF Staff Di (https://www.imf.org/-/media/files/publications/sdn/2024/english/sdnea2024001.pdf.md) | 2 | search only | Gmyrek and others, Generative AI and jobs: A refined global index of occupational exposure (https://www.ilo.org/node/706766) | 2 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/ai_office_agents.yaml (https://world.abundancemachines.si/data/v7/capabilities/ai_office_agents.yaml) Construction with far less labour and material per building https://world.abundancemachines.si/guide/idea-construction-efficient.html Building methods (factory-made components, automated site work and design that puts material only where loads need it) that build any structure with half the construction labour and 30% less cement and steel per unit, available from 2028, so that a structure costing $1.00 to build today costs about $0.80 (2026 int$ per int$ of construction, C13, at today's methods and prices). Result Measure | Value | Share of the gap filled, median across the draws | 0.48% | 80% range | 0.0% to 4.1% | Dollars a year in 2035 (median) | $0.8T | Growth points a year (median) | 0.03 | Median economy, the entry as written | 1.1%: $1.7T tier 1, $0B tier 2 | What people buy (path a), above on course | $1.7T | What inputs allow (path b), above on course | $38.8T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 57.6%; Construction trades in 25.2%; Physical machine labour (robots) in 17.0%; Capital stock in 0.20% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 11.4% | Price against the next-best option | 0.8 against 1 (2026 int$ per int$ of construction (C13) at today's methods and prices) | Value to people beyond measured GDP (not added) | $23B | Possible extra from unsourced knock-ons (not added) | $1B | Starting numbers both ways (A2): stage1-v5 / replaced | 1.1% / 1.1% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (12 of 15 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | construction_efficient d1: cost on C13 ($ of construction (C13) a year, at today's methods and prices) | 69,696,885,958,744 | 70,730,856,188,661 | 1 | 0.8 | $1.7T | b | construction_efficient ch1: recipe K17 C13 | | | | | | b | construction_efficient ch2: recipe K18 C13 | | | | | | b | construction_efficient ch3: recipe LAB C13 | | | | | | b | construction_efficient ch4: recipe K09 C13 | | | | | | b | construction_efficient ch5: recipe K10 C13 | | | | | | b | construction_efficient ch6: supply K21 | | | | | | result | path (a) on course + gains | | | | | $291.9T | result | path (b) most output before K04 passes its record-pace supply | | | | | $329.0T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $1.7T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 7.5% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 5.5% | 0.29% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | next_best.price | E | 0.0% | 2.5% | [E] from sourced inputs. A second, independent measure of today's price of the next-best option would confirm it. | For the profit-machine: gross value added in 2035 $2.4T; price against the next-best option 80.0%; capital per dollar of output 0.7. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 1 | 0.0% (0.0% to 1.3%) | buyers | Physical machine labour (robots) | no | 0.8 | 0.48% (0.0% to 4.1%) | buyers | Physical machine labour (robots) | no | 0.6 | 1.3% (0.0% to 7.3%) | buyers | Physical machine labour (robots) | no | 0.4 | 2.1% (0.0% to 10.6%) | buyers | Physical machine labour (robots) | yes | 0.25 | 2.7% (0.0% to 13.4%) | buyers | Physical machine labour (robots) | yes | 0.15 | 3.1% (0.0% to 15.1%) | buyers | Physical machine labour (robots) | yes | 0.1 | 3.3% (0.0% to 15.8%) | buyers | Physical machine labour (robots) | yes | 0.05 | 3.6% (0.0% to 16.6%) | buyers | Physical machine labour (robots) | yes | 0.02 | 3.7% (0.0% to 16.9%) | buyers | Physical machine labour (robots) | yes | 0.01 | 3.7% (0.0% to 17.1%) | buyers | Physical machine labour (robots) | yes | 0.001 | 3.8% (0.0% to 17.3%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # construction_efficient: comparison with published estimates **Machine (world, 2035, price 0.80 of today's cost):** median across draws $768B a year, which is 0.26% of on-course world GDP and 0.03 growth points (80% range $0-6.6T). With the entry as written it is $1.68T (0.58%). **What it is made of:** the 20% saving on the 11.4% of construction using the method in 2035 ($1.58T), plus $97B of extra building. The labour and material cuts act only on path (b), which does not bind. At full uptake (80% of construction) the same price would give about $12T, 4% of world GDP. **Sources:** all figures are from search snippets only: unsaved, strength 3 at best. | Estimate (strongest first) | Their figure | Machine's same measure | Machine / it | |---|---|---|---| | Lule\xe5 University study, Sweden (new) | industrialised housebuilding ~19% cheaper, labour productivity +10% | price 0.80; labour per unit halved | 1.0x on price; labour cut 5x theirs | | Syverson (BuiltWorlds, 2023; title only) | US loses $2.8T a year, ~10% of GDP, to construction's lag since 1970 | 0.58% (as written), 0.26% (median) | 0.06x / 0.03x | | McKinsey Global Institute 2017 | catch-up adds $1.6T a year, ~2% of world GDP (no date) | $5.8T at 2035 scale | 0.29x as written, 0.13x median; ~2x at full uptake | | BCG for WEF 2016 (new) | digitalisation saves 13-21% of non-residential costs, $0.7-1.2T a year (~0.9-1.6% of GDP) | $2.7-4.6T at 2035 scale | 0.37-0.63x as written; 0.17-0.28x median | | McKinsey 2019, modular | costs up to 20% lower; up to $22bn a year saved, US and Europe, 2030 | price 0.80; world saving $1.58T | 1.0x on price; ~70x on dollars | | Bain (new) | up to 20% lower labour and material cost; on-site labour up to 30% lower | price 0.80; labour -50% | 1.0x; 1.7x | ## Gaps over 2x - **MGI and BCG (machine lower):** the gap is spread. Both are undated full potentials; the machine has 11.4% uptake in 2035 (from 2028, 11 years from 10% to 90%). At full uptake the machine is about 2x MGI, which is scope: the model's built-structures layer (PPP, 24% of world output) is larger than MGI's market-dollar spending (about $10T). - **Syverson (17-38x higher):** a 50-year counterfactual of compounding productivity growth, not a one-off 20% cut taken up by a ninth of buyers. - **McKinsey's $22bn (~70x lower):** scope. It covers modular buildings in two regions (a $130bn market); the entry covers all structures worldwide. - **Lule\xe5's labour figure:** the entry's halving of labour is far beyond the one measured case (+10% productivity). It does not move this result, but would if construction trades bound first. ## Which I trust more **The price:** the published figures, which support it: four independent sources put mature industrialised building at about 20% cheaper. **The 2035 dollars:** the machine, since the published dollar figures are undated potentials. Its trust is still low (12 of 15 key numbers assumed), and halving or doubling the spread pace moves the result between 5.5% and 0.3% of the gap. **Labour per unit:** the measured Swedish case; the entry's 50% cut is an upper bound. Sources Source | Strength | Saved copy | OECD Inter-Country Input-Output tables, 2023 edition, 2019, world construction (ISIC F) co (https://stats.oecd.org/wbos/fileview2.aspx?IDFile=d1ab2315-298c-4e93-9a81-c6f2273139fe) | 1 | yes | OECD ICIO 2023 edition, 2019, world construction: output row and the row of construction's (https://stats.oecd.org/wbos/fileview2.aspx?IDFile=d1ab2315-298c-4e93-9a81-c6f2273139fe) | 1 | yes | OECD ICIO 2023 edition, 2019, world construction's purchases of other non-metallic mineral (https://stats.oecd.org/wbos/fileview2.aspx?IDFile=d1ab2315-298c-4e93-9a81-c6f2273139fe) | 1 | yes | WIOD Socio Economic Accounts, November 2016 release: construction (F) rows of 43 countries (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD SEA 2016: nominal capital stock (K) and gross output (GO) of construction (F) and of (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD SEA 2016: China, construction, persons engaged (thousands), 2000-2014 (2009: 56358.08 (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD SEA 2016: China, construction, gross output volume index (2010 = 100), 2000-2014 (200 (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | Albouy, Ehrlich and Liu (2016), Housing Demand, Cost-of-Living Inequality, and the Afforda (https://www.nber.org/system/files/working_papers/w22816/w22816.pdf) | 2 | yes | Albouy, Ehrlich and Liu (2016), NBER w22816: the rise in the relative price of shelter sin (https://www.nber.org/system/files/working_papers/w22816/w22816.pdf) | 2 | yes | UNEP GlobalABC, Global Status Report for Buildings and Construction 2025-2026 (citing IEA (https://globalabc.org/resources/publications/global-status-report-buildings-and-construction-2025-2026) | 1 | yes | Moynihan and Allwood (2014), Utilization of structural steel in buildings, Proceedings of (https://pmc.ncbi.nlm.nih.gov/articles/PMC4075790) | 1 | search only | NAHB Eye on Housing, Manufactured Homes: An Alternative Means of Housing Supply (2025), re (https://eyeonhousing.org/2025/04/manufactured-homes-an-alternative-means-of-housing-supply/) | 3 | search only | China Daily (22 March 2021), reporting Ministry of Housing and Urban-Rural Development fig (https://www.chinadaily.com.cn/a/202103/22/WS6057f6a2a31024ad0bab0a1f.html) | 3 | search only | Global Construction Review, Why Sweden beats the world (citing Steinhardt and Manley, Quee (https://www.globalconstructionreview.com/why-sweden-beats-world) | 3 | search only | Building and Construction Authority, Singapore: Prefabricated Prefinished Volumetric Const (https://www1.bca.gov.sg/buildsg/productivity/design-for-manufacturing-and-assembly-dfma/prefabricated-prefinished-volumetric-construction-ppvc) | 3 | search only | CIN Magazine (22 October 2025), reporting a Steel Construction Institute study of a four-s (https://cinmagazine.co.uk/?p=4787) | 3 | search only | Goolsbee and Syverson (2023), The Strange and Awful Path of Productivity in the U.S. Const (https://www.nber.org/papers/w30845) | 1 | search only | International Labour Organization, Construction: a hazardous work; search snippet only (https://www.ilo.org/resource/construction-hazardous-work) | 1 | search only | OECD (2025), Mortality Risk Valuation in Policy Assessment; search summary only (https://www.oecd.org/en/publications/mortality-risk-valuation-in-policy-assessment_76ca89a2-en) | 2 | search only | Resources for the Future, Report 26-11 (EPA 2023 social cost of carbon in 2026 dollars); s (https://media.rff.org/documents/Report_26-11_Final.pdf) | 2 | search only | McKinsey Global Institute (2017), Reinventing construction: a route to higher productivity (https://www.mckinsey.com/capabilities/operations/our-insights/reinventing-construction-through-a-productivity-revolution) | 3 | search only | McKinsey (2019), Modular construction: from projects to products (consultancy: strength 3) (https://www.mckinsey.com/industries/real-estate/our-insights/modular-construction-from-projects-to-products) | 3 | search only | BuiltWorlds (2023), Construction's poor productivity costs U.S. economy $2.8 trillion per (https://builtworlds.com/news/constructions-poor-productivity-costs-u-s-economy-2-8-trillion-per-year-according-university-chicago-economist/) | 3 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/construction_efficient.yaml (https://world.abundancemachines.si/data/v7/capabilities/construction_efficient.yaml) A cheap cure for most cancers https://world.abundancemachines.si/guide/idea-cancer-cure-cheap.html A treatment that cures the cancers of four-fifths of people with a new cancer diagnosis (those whose cancer types it works on; the rest keep today's care), given as one course together with the diagnosis it needs, sold from 2028 at 1,000 int$ (2026, PPP) per patient treated, against about 90,400 int$ per patient for today's cancer care (world average, on course in 2035). Result Measure | Value | Share of the gap filled, median across the draws | 0.35% | 80% range | 0.0% to 1.1% | Dollars a year in 2035 (median) | $0.6T | Growth points a year (median) | 0.02 | Median economy, the entry as written | 0.61%: $1.0T tier 1, $0B tier 2 | What people buy (path a), above on course | $1.0T | What inputs allow (path b), above on course | $37.9T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 53.7%; Construction trades in 26.9%; Physical machine labour (robots) in 19.4% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 50.4% | Price against the next-best option | 1,000 against 90,393 (2026 int$ per patient treated (diagnosis, one curative course and follow-up)) | Value to people beyond measured GDP (not added) | $3.6T | Possible extra from unsourced knock-ons (not added) | $0.2T | Starting numbers both ways (A2): stage1-v5 / replaced | 0.61% / 0.61% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (12 of 12 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | cancer_cure_cheap d1: cost on new:cancer_cure (patients treated a year (people with a new cancer diagnosis given a full course of care)) | 17,913,426 | 21,782,103 | 90,393 | 1,000 | $1.0T | b | cancer_cure_cheap ch1: recipe LAB C05 | | | | | | b | cancer_cure_cheap ch2: recipe K18 C05 | | | | | | b | cancer_cure_cheap ch3: recipe K21 C05 | | | | | | result | path (a) on course + gains | | | | | $291.2T | result | path (b) most output before K04 passes its record-pace supply | | | | | $328.2T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $1.0T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 0.96% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 0.96% | 0.11% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | spread.max_share | A | 0.30% | 0.76% | [A] now. Settled by a study of the share of buyers who would ever switch (adoption studies). | For the profit-machine: gross value added in 2035 $7B; price against the next-best option 1.1%; capital per dollar of output 0.839. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 90,393 | 0.0% (0.0% to 0.16%) | buyers | Physical machine labour (robots) | no | 72,314 | 0.04% (0.0% to 0.31%) | buyers | Physical machine labour (robots) | no | 54,236 | 0.12% (0.0% to 0.48%) | buyers | Physical machine labour (robots) | no | 36,157 | 0.19% (0.0% to 0.66%) | buyers | Physical machine labour (robots) | no | 22,598 | 0.25% (0.0% to 0.82%) | buyers | Physical machine labour (robots) | yes | 13,559 | 0.29% (0.0% to 0.92%) | buyers | Physical machine labour (robots) | yes | 9,039 | 0.31% (0.0% to 0.97%) | buyers | Physical machine labour (robots) | yes | 4,520 | 0.34% (0.0% to 1.0%) | buyers | Physical machine labour (robots) | yes | 1,808 | 0.35% (0.0% to 1.1%) | buyers | Physical machine labour (robots) | yes | 1,000 | 0.35% (0.0% to 1.1%) | buyers | Physical machine labour (robots) | yes | 904 | 0.35% (0.0% to 1.1%) | buyers | Physical machine labour (robots) | yes | 90.4 | 0.36% (0.0% to 1.1%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # cancer_cure_cheap: comparison with published estimates **Machine (2035, 2026 int$):** $958B measured GDP (median economy, 0.33% of world output; draws' median $572B): $807B freed care spending, $151B extra patients; workers kept alive $192B (not added). Value beyond GDP is $3.6T: 3.2M deaths avoided (25.7%). The cure reaches 50.4% of new patients. All estimates were read only in search snippets: strength 3 at best. Ratio = machine / estimate. | Estimate (strongest first) | Their number | Machine's scale, 2035 | Machine | Ratio | |---|---|---|---|---| | Chen et al. 2023, world | 0.55% of GDP a year | x $290T x 0.504 = $0.80T (upper bound) | $0.96T | 1.2 | | OECD 2024, OECD only | EUR PPP 449bn care, 163bn work | $0.63T; work x 0.504 = $0.11T [EUR PPP \u2248 1.4 int$, A] | world care $1.62T; workers $0.19T | 2.6; 1.7 | | Lakdawalla et al. 2010, US | $82,000 per life-year | \u2248 2.3x US income [A] | 2.3x world income | 1.0 | | Murphy & Topel 2006, US | $50T a cure (new); $500bn per 1% cut | 3% a year, x 25.7% \u2248 $0.7T | US share \u2248 $0.6T [A] | 0.8 | | Lancet Oncology Commission 2015 | >$6T lost 2015-30 without surgery | $0.4T a year | labour $0.19T | 0.5 | | WHO 2020 | 7M lives a decade | 0.7M a year | 3.2M | 4.6 | | ACS/LIVESTRONG 2010 (new) | 1.5% of GDP, DALYs | x 25.7% = $1.1T | $3.6T | 3.2 | | Moore & Philipson 2026, advocacy (new) | US $185T over 35 years; "+1 growth point" | x 25.7% \u2248 $1.3T | $0.6T; 0.02 points | 0.45; 0.02 | ## Where they differ by more than 2x - **OECD care, WHO:** different scope. The OECD is 39% of the machine's world spending, which is plausible, though the 5% cancer share may be high. WHO scales up today's care, not a cure. - **ACS:** different valuation. ACS uses about 1x income per DALY, discounted; the machine uses 2.3x over 15 years. IARC 2014 (new) gives $1.16T, or $2.5T with a value of statistical life, so the machine is at the high end. - **Lancet Commission:** losses build from 2015 and include lost capital. The cure starts in 2028, with no capital channel and its workers unadded. - **Moore & Philipson:** full US values of life; the growth claim has no stated mechanism. ## Which I trust more On measured GDP the machine and Chen agree within 2x, through different channels. 84% of the machine's gain is freed spending, which rests on an assumed cancer share. Chen counts lost labour, which the machine leaves unadded, and care spending only as lost investment (split not in snippets). I trust Chen more: peer-reviewed, modelled by country, age and cancer. The machine's trust is low, with all 12 key numbers assumed. The price lies beyond the evidence, but the limit binds below 15,200 int$, so it matters little. On value beyond GDP, Lakdawalla and Murphy-Topel support the machine's value of a life-year, so $3.6T is the upper middle of a 2-3x range. Sources Source | Strength | Saved copy | Manning, Newhouse, Duan, Keeler, Leibowitz and Marquis, Health Insurance and the Demand fo (https://www.batz.ch/wp-content/uploads/Manning.pdf) | 1 | yes | Manning et al. 1987 (as rand_abstract), p. 268: the three estimation methods (https://www.batz.ch/wp-content/uploads/Manning.pdf) | 1 | yes | Manning et al. 1987 (as rand_abstract), Table 8: arc elasticities for coinsurance ranges 0 (https://www.batz.ch/wp-content/uploads/Manning.pdf) | 1 | yes | Barber, Gotham, Bygrave and Cepuch, Estimated Sustainable Cost-Based Prices for Diabetes M (https://jamanetwork.com/journals/jamanetworkopen/fullarticle/2816984) | 2 | yes | UN World Population Prospects 2024, population by five-year age group, medium variant: Wor (https://population.un.org/wpp/assets/Excel%20Files/1_Indicator%20(Standard)/CSV_FILES/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) | 2 | yes | IARC, Global cancer statistics 2024: GLOBOCAN estimates of incidence and mortality worldwi (https://www.iarc.who.int/news-events/global-cancer-statistics-2024-globocan-estimates-of-incidence-and-mortality-worldwide-for-34-cancers-in-186-countries/) | 1 | search only | IARC, Global cancer statistics 2024 (as iarc2024): projection to 2050. Search snippet only (https://www.iarc.who.int/news-events/global-cancer-statistics-2024-globocan-estimates-of-incidence-and-mortality-worldwide-for-34-cancers-in-186-countries/) | 2 | search only | Arise News, IARC: cancer cases set to rise 67% by 2050 as global prevention gaps persist ( (https://www.arise.tv/iarc-cancer-cases-set-to-rise-67-by-2050-as-global-prevention-gaps-persist/) | 3 | search only | Premature cancer mortality from GLOBOCAN 2022 (PMC12406598). Search snippet only (https://pmc.ncbi.nlm.nih.gov/articles/pmc12406598) | 1 | search only | Hofmarcher, Lindgren, Wilking and J\xf6nsson, The cost of cancer in Europe 2018, European Jou (https://ihe.se/wp-content/uploads/2020/10/IHE-Report-2020_6_.pdf) | 2 | search only | Hofmarcher et al. 2020 (as ihe2020): cancer health spending in Europe in 2018 (EU-27, Icel (https://ihe.se/wp-content/uploads/2020/10/IHE-Report-2020_6_.pdf) | 2 | search only | OECD and European Commission, Beating Cancer Inequalities in the EU (2024), executive summ (https://cancer-inequalities.jrc.ec.europa.eu/sites/default/files/oecd-ecir-executive-summary-5_2_2024_EN.pdf) | 1 | search only | EFPIA guest blog on the IHE Comparator Report on Cancer in Europe 2025. Search snippet onl (https://www.efpia.eu/news-events/the-efpia-view/blog-articles/cancer-care-is-becoming-more-efficient-better-outcomes-without-escalating-costs-guest-blog/) | 3 | search only | OECD, Tackling the impact of cancer on health, the economy and society (OECD Health Policy (https://www.oecd.org/en/publications/tackling-the-impact-of-cancer-on-health-the-economy-and-society_85e7c3ba-en.html) | 2 | search only | OECD, How can countries tackle the impact of cancer on health, the economy and society? (p (https://www.oecd.org/en/publications/how-can-countries-tackle-the-impact-of-cancer-on-health-the-economy-and-society_6fa94533-en/full-report.html) | 2 | search only | Estimates of non-communicable disease expenditure by disease phase, sex, and age group for (https://www.ncbi.nlm.nih.gov/pmc/articles/PMC12506150/) | 2 | search only | WHO, World Cancer Day 2020 release (WHO outlines steps to save 7 million lives from cancer (https://www.mlo-online.com/disease/cancer/article/21123987/who-outlines-steps-to-save-seven-million-lives-from-cancer) | 1 | search only | WHO, World Cancer Day 2020: at least 7 million lives could be saved from cancer over the n (https://www.inform.kz/en/at-least-7-mln-lives-could-be-saved-from-cancer-over-next-decade-who_a3611432) | 2 | search only | Sullivan et al., Global cancer surgery: delivering safe, affordable, and timely cancer sur (https://ascopost.com/issues/october-10-2015/over-three-quarters-of-people-with-cancer-worldwide-have-no-access-to-safe-surgery/) | 2 | search only | ecancer, Failure to train more cancer surgeons and strengthen surgical systems could cost (https://ecancer.org/en/news/7812-failure-to-train-more-cancer-surgeons-and-strengthen-surgical-systems-could-cost-the-global-economy-more-than-us-6-trillion-by-2030) | 2 | search only | Goldman et al., Prescription drug cost sharing and use of specialty cancer drugs, Health S (https://pmc.ncbi.nlm.nih.gov/articles/PMC2813440) | 1 | search only | Goldman, Joyce, Lawless, Crown and Willey, Benefit design and specialty drug use, Health A (https://www.rand.org/pubs/external_publications/EP20060911.html) | 1 | search only | Jung, Feldman and McBean, demand for specialty cancer drugs in Medicare Part D, Forum for (https://econpapers.repec.org/RePEc:bpj:fhecpo:v:20:y:2017:i:2:p:19:n:1) | 1 | search only | WHO, Over 1 million treated with highly effective hepatitis C medicines (27 October 2016). (https://www.who.int/en/news-room/detail/27-10-2016-over-1-million-treated-with-highly-effective-hepatitis-c-medicines) | 1 | search only | WHO, WHO highlights progress in accelerating access to hepatitis C diagnostics and treatme (https://www.who.int/news/item/27-01-2021-who-highlights-progress-in-accelerating-access-to-hepatitis-c-diagnostics-and-treatment-in-low-and-middle-income-countries) | 1 | search only | WHO Global Hepatitis Report 2024, as reported by MLO (WHO sounds alarm on viral hepatitis (https://www.mlo-online.com/disease/infectious-disease/news/55016826/who-sounds-alarm-on-viral-hepatitis-infections-claiming-3500-lives-each-day) | 1 | search only | O'Connor et al., Speed of adoption of immune checkpoint inhibitors of programmed cell deat (https://resources.flatiron.com/publications/speed-of-adoption-of-immune-checkpoint-inhibitors-of-programmed-cell-death-1-protein-and-comparison-of-patient-ages-in-clinical-practice-vs-pivotal-clinical-trial) | 1 | search only | AJMC, Study finds rapid uptake of anti-PD-1 agents following FDA approval (on O'Connor et (https://www.ajmc.com/newsroom/study-finds-rapid-uptake-of-anti8211pd1-agents-following-fda-approval) | 3 | search only | Chen et al., Estimates and Projections of the Global Economic Cost of 29 Cancers in 204 Co (https://pure.iiasa.ac.at/18641) | 2 | search only | Murphy and Topel, The Value of Health and Longevity, Journal of Political Economy 114(4), (https://www.nber.org/digest/dec05/value-health-and-longevity) | 2 | search only | Lakdawalla, Sun, Jena, Reyes, Goldman and Philipson, An economic evaluation of the war on (https://www.nber.org/papers/w15574) | 2 | search only | Chang, Robinson, Hammitt and Resch, Economics in 'Global Health 2035': a sensitivity analy (https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5370212/) | 2 | search only | Chang et al. 2017 (as jamison_vly): alternative assumptions. Search snippet only (https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5370212/) | 2 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/cancer_cure_cheap.yaml (https://world.abundancemachines.si/data/v7/capabilities/cancer_cure_cheap.yaml) Much faster building permits and grid connections https://world.abundancemachines.si/guide/idea-permits-grid-fast.html A permitting and grid-connection process that grants building permits in about 1 month and grid connections (and other major infrastructure approvals) in about 12 months, adopted by governments from 2027, so the cost of waiting falls from about 6.8 to about 1.6 cents per dollar of construction (2026 int$ of waiting cost per $ of construction, C13). Result Measure | Value | Share of the gap filled, median across the draws | 0.18% | 80% range | 0.0% to 1.1% | Dollars a year in 2035 (median) | $0.3T | Growth points a year (median) | 0.01 | Median economy, the entry as written | 0.33%: $0.5T tier 1, $0B tier 2 | What people buy (path a), above on course | $0.5T | What inputs allow (path b), above on course | $37.1T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 52.6%; Construction trades in 26.9%; Physical machine labour (robots) in 20.5% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 14.3% | Price against the next-best option | 0.0158 against 0.0675 (2026 int$ of waiting cost per $ of construction (C13)) | Value to people beyond measured GDP (not added) | $73B | Possible extra from unsourced knock-ons (not added) | $0B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.33% / 0.33% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (7 of 10 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | permits_grid_fast d1: cost on new:permit_wait ($ of construction (C13) a year, at today's construction prices) | 69,696,885,958,744 | 70,215,091,025,111 | 0.0675 | 0.0158 | $0.5T | b | permits_grid_fast ch1: supply K01 | | | | | | result | path (a) on course + gains | | | | | $290.7T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.3T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $0.5T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 2.1% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 1.6% | 0.09% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | next_best.price | A | 0.11% | 0.77% | [A] now. Settled by a study of today's price of the next-best option. | For the profit-machine: gross value added in 2035 $99B; price against the next-best option 23.3%; capital per dollar of output 0.5. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 0.0675 | 0.0% (0.0% to 0.32%) | buyers | Physical machine labour (robots) | no | 0.054 | 0.01% (0.0% to 0.49%) | buyers | Physical machine labour (robots) | no | 0.0405 | 0.06% (0.0% to 0.67%) | buyers | Physical machine labour (robots) | no | 0.027 | 0.13% (0.0% to 0.87%) | buyers | Physical machine labour (robots) | no | 0.0169 | 0.17% (0.0% to 1.1%) | buyers | Physical machine labour (robots) | no | 0.0158 | 0.18% (0.0% to 1.1%) | buyers | Physical machine labour (robots) | no | 0.0101 | 0.19% (0.0% to 1.2%) | buyers | Physical machine labour (robots) | no | 0.00675 | 0.21% (0.0% to 1.3%) | buyers | Physical machine labour (robots) | no | 0.00338 | 0.22% (0.0% to 1.4%) | buyers | Physical machine labour (robots) | no | 0.00135 | 0.23% (0.0% to 1.4%) | buyers | Physical machine labour (robots) | no | 0.000675 | 0.23% (0.0% to 1.4%) | buyers | Physical machine labour (robots) | no | 6.75e-05 | 0.23% (0.0% to 1.4%) | buyers | Physical machine labour (robots) | no | The research agent's comparison with published estimates # permits_grid_fast: comparison with published estimates **Machine (world, 2035, waiting cost 1.6 instead of 6.8 cents per $ of construction):** median across draws $291B a year, 0.10% of world GDP, 0.01 growth points (80% range $0-1.8T). As written: $527B (0.18%). **What it is made of:** the waiting saving on the 14.3% of construction reformed by 2035, about half from building permits (5 to 1 month) and half from grid and major-infrastructure approvals (45 to 12 months). At full uptake (90%) it would be $3.2T (1.1%): infrastructure $1.55T (0.54%), power projects alone about $0.8T. **Sources:** all figures are from search snippets only: unsaved, strength 3 at best. | Estimate (strongest first) | Their figure | Machine's same measure | Machine / it | |---|---|---|---| | CEA, Oct 2026 | US long-run GDP +0.28-0.56% if reviews fall from 4.2 to 2 years; +0.41-0.83% at 1 year | infrastructure part: 0.54% at full uptake; ~0.085% in 2035 | 0.65-1.3x; 0.1-0.2x in 2035 | | Hsieh-Moretti 2019 | US GDP +3.7% (2009) from looser land-use rules in three metros | 1.1% at full uptake; 0.18% in 2035 | 0.3x; 0.05x | | RFF, Power Delayed | US net cost of power-project delays $47bn (scenario total) | power part ~$0.8T a year (world, full uptake); a US tenth ~$80bn | >1.7x (theirs is a total) | | C2ES-cited study (new) | US transmission reform: $125bn of grid costs saved 2026-2040 (~$8bn a year) | as above | \u226510x | | Grid Strategies and Brattle (new) | fixing interconnection: ~$100bn of benefits; PJM delay costs up to $7bn in a year | as above | ~11x (PJM, yearly) | | McKinsey | $1.7-2.4T of cumulative US GDP forgone in federal permitting | a stock with no period: not convertible | - | ## Gaps over 2x - **CEA in 2035:** spread. The CEA is long-run full adoption; the machine reaches 14% of construction by 2035 (12 years from 10% to 90% [A]). At full uptake its infrastructure part is inside the CEA's range for a similar wait cut (38 months against 33). - **Hsieh-Moretti:** a channel the machine lacks: how much may be built where workers are most productive (zoning), not how fast. The model has no geography. - **Grid studies (machine 2-10x or more higher):** a different measure, and likely a machine overstatement. - The studies count electricity-system costs, US or regional, often cumulative. - The machine charges the return on the whole project's value for each month of waiting, though before construction only land, design and finance are tied up (red team RT16), so its grid part is probably too high. - Its extra electricity is not valued (power does not bind). ## Which I trust more **Major infrastructure:** both, since the CEA and the machine agree for a similar wait cut. **Grid connections:** the electricity-system studies; no study backs the machine's waiting cost for pre-construction queues. **Building permits (half the machine's gain):** no published GDP estimate exists; the machine rests on the practitioner rule of about 1% of cost a month (strength 3). **The 2035 number:** low trust (7 of 10 key numbers assumed); most of its uncertainty is how fast governments adopt the reform, which no estimate addresses. Sources Source | Strength | Saved copy | LBNL, Queued Up: 2026 Edition (Rand et al., June 2026); saved copy from stage1-v2/v1/agent (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | IEA, World Energy Outlook 2025; saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo20 (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025 (data-centre connection queues); saved copy from stage1-v2/ (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025 (data centres at risk of delay); saved copy from stage1-v2/ (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 2 | yes | IEA, World Energy Outlook 2025 (power investment); saved copy from stage1-v2/agent4_bottle (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | Albouy, Ehrlich and Liu (2016), Housing Demand, Cost-of-Living Inequality, and the Afforda (https://www.nber.org/system/files/working_papers/w22816/w22816.pdf) | 2 | yes | Albouy, Ehrlich and Liu (2016), NBER WP 22816, cross-metro estimate; saved copy from stage (https://www.nber.org/system/files/working_papers/w22816/w22816.pdf) | 2 | yes | IRENA, Renewable Power Generation Costs in 2024 (summary), Table S1; saved copy from stage (https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf) | 1 | yes | IRENA, Renewable Power Generation Costs in 2024 (summary), Table S1; saved copy from stage (https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf) | 1 | yes | IRENA, Renewable Power Generation Costs in 2024 (summary), capacity additions; saved copy (https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf) | 1 | yes | Soltas et al. (2026), permit records for 60 US cities 2000-2025 (Princeton / University of (https://www.multihousingnews.com/why-permitting-time-has-doubled-since-2000/) | 2 | search only | Soltas et al. (2026), as reported by Multi-Housing News; search snippet only (https://www.multihousingnews.com/why-permitting-time-has-doubled-since-2000/) | 2 | search only | World Bank, Doing Business 2020, United States economy profile (dealing with construction (https://subnational.doingbusiness.org/content/dam/doingBusiness/country/u/united-states/USA.pdf) | 1 | search only | World Bank, Doing Business 2012, Dealing with construction permits chapter; search snippet (https://www.doingbusiness.org/content/dam/doingBusiness/media/Annual-Reports/English/DB12-Chapters/Dealing-with-construction-permits.pdf) | 1 | search only | World Bank, Doing Business, Dealing with construction permits chapters (reform counts); se (https://subnational.doingbusiness.org/content/dam/doingBusiness/media/Annual-Reports/English/DB14-Chapters/DB14-Dealing-with-construction-permits.pdf) | 1 | search only | National League of Cities, Housing Supply Fact Sheet 5 (citing a Washington State study, a (https://www.nlc.org/wp-content/uploads/2025/09/Housing-Supply-Fact-Sheet-5.pdf) | 3 | search only | Sightline Institute, citing Seattle planners' analysis of permitting delay; search snippet (https://www.sightline.org/?p=61333) | 3 | search only | CBO Working Paper 2026-10, A Model for Estimating the Economic Effects of Changes in Permi (https://www.cbo.gov/publication/62517) | 2 | search only | Council of Economic Advisers, The Economic Benefits of Permitting Reform (October 2026); s (https://www.whitehouse.gov/research/2026/10/the-economic-benefits-of-permitting-reform/) | 2 | search only | McKinsey, Unlocking US federal permitting: A sustainable growth imperative; search snippet (https://www.mckinsey.com/industries/public-sector/our-insights/unlocking-us-federal-permitting-a-sustainable-growth-imperative) | 3 | search only | Hsieh and Moretti (2019), Housing Constraints and Spatial Misallocation, American Economic (https://eml.berkeley.edu//~moretti/growth.pdf) | 2 | search only | Resources for the Future, Power Delayed: the hidden costs of postponing power projects (Re (https://resources.org/resources-radio/power-delayed-the-hidden-costs-of-postponing-power-projects-with-mckenna-peplinski) | 2 | search only | Mayer and Somerville (2000), Land use regulation and new construction, Regional Science an (https://realestate.wharton.upenn.edu/wp-content/uploads/2017/03/331.pdf) | 1 | search only | Resources for the Future, Report 26-11 (EPA 2023 social cost of carbon in 2026 dollars); s (https://media.rff.org/documents/Report_26-11_Final.pdf) | 2 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/permits_grid_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/permits_grid_fast.yaml) Human-level general-purpose robots https://world.abundancemachines.si/guide/idea-robots-general.html General-purpose robots that can do any physical task a person can, at human speed and reliability, sold as robot work at 5 int$ (2026, PPP) per hour of human-level physical work from 2028, against 14.04 int$ per hour for a human doing the same task; the number that can exist by 2035 is set by the fastest production ramp on record (China's electric cars, x1.69 a year). Result Measure | Value | Share of the gap filled, median across the draws | 0.11% | 80% range | 0.0% to 0.24% | Dollars a year in 2035 (median) | $0.2T | Growth points a year (median) | 0.01 | Median economy, the entry as written | 0.15%: $0.2T tier 1, $0B tier 2 | What people buy (path a), above on course | $0.2T | What inputs allow (path b), above on course | $38.5T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 54.8%; Construction trades in 26.9%; Physical machine labour (robots) in 18.3% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 18.0% | Price against the next-best option | 5 against 14 (2026 int$ per hour of human-level physical work) | Value to people beyond measured GDP (not added) | $1B | Possible extra from unsourced knock-ons (not added) | $0B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.15% / 0.15% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (10 of 12 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | robots_general d1: supply_net on K04 (hours of physical work a year (humans and robots together)) | 6,416,600,000,000 | 6,445,392,000,000 | 14 | 5 | $0.2T | b | robots_general ch1: supply K04 | | | | | | b | robots_general ch2: supply K08 | | | | | | b | robots_general ch3: supply K21 | | | | | | result | path (a) on course + gains | | | | | $290.5T | result | path (b) most output before K04 passes its record-pace supply | | | | | $328.7T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $0.2T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | demand[0].capacity_2035 | A | 0.08% | 0.29% | [A] now. Settled by a study of how many units can be made and installed by 2035 (production ramps of similar products). | available_year | A | 0.16% | 0.0% | [A] now. Settled by a study of when it is available. | demand[0].limit | A | 0.0% | 0.15% | [A] now. Settled by a study of the physical limit of demand. | For the profit-machine: gross value added in 2035 $0.1T; price against the next-best option 35.6%; capital per dollar of output 1.18. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 14 | 0.0% (0.0% to 0.03%) | buyers | Physical machine labour (robots) | no | 11.2 | 0.02% (0.0% to 0.08%) | buyers | Physical machine labour (robots) | no | 8.42 | 0.06% (0.0% to 0.14%) | buyers | Physical machine labour (robots) | no | 5.62 | 0.10% (0.0% to 0.22%) | buyers | Physical machine labour (robots) | no | 5 | 0.11% (0.0% to 0.24%) | buyers | Physical machine labour (robots) | no | 3.51 | 0.14% (0.0% to 0.28%) | buyers | Physical machine labour (robots) | no | 2.11 | 0.16% (0.0% to 0.32%) | buyers | Physical machine labour (robots) | no | 1.4 | 0.17% (0.0% to 0.34%) | buyers | Physical machine labour (robots) | no | 0.702 | 0.18% (0.0% to 0.36%) | buyers | Physical machine labour (robots) | no | 0.281 | 0.19% (0.0% to 0.37%) | buyers | Physical machine labour (robots) | no | 0.14 | 0.19% (0.0% to 0.37%) | buyers | Physical machine labour (robots) | no | 0.014 | 0.19% (0.0% to 0.38%) | buyers | Physical machine labour (robots) | no | The research agent's comparison with published estimates # robots_general: comparison with published estimates **Machine (world, 2035, $5 against $14.04 an hour):** median across draws $182B a year, which is 0.063% of world GDP and 0.01 growth points (80% range $0-379B). As written it is $244B (0.084%). **What sets the size:** the fleet, 13.5 million robots in service in 2035 (5.5 million built that year). Stage1-v5's record pace already counts each robot as one worker, so only each robot's second worker-equivalent is added. Counted from zero, the same fleet would give about $0.5T (my rough scaling). **What is compared:** with no published 2035 output effect, I compare fleet, sales and value per robot. All figures are from snippets only: unsaved, strength 3 at best. The entry's first recorded estimate is a reserved study, left out. | Estimate | Their figure | Machine | Machine / it | |---|---|---|---| | Acemoglu-Restrepo 2020 (journal) | +1 robot per 1,000 workers: local employment -0.2 pt, wages -0.42% | 3.4 robots per 1,000 workers; no unemployment | - | | Morgan Stanley (new) | ~13 m in use by 2035 | 13.5 m | 1.0x | | Goldman Sachs 2024 | 1.4 m shipped, $38bn (2035) | 5.5 m built, $139bn at $25,000 | 4.0x / 3.6x | | Goldman 2026 revision | 6.5 m, $138bn | as above | 0.85x / 1.0x | | Barclays 2026 (new) | $200bn (optimistic); China up to 24 m | $139bn; 13.5 m worldwide | 0.7x / 0.56x | | UBS (new) | ~2 m in operation | 13.5 m | 6.8x | | Bank of America (new; blog only) | 10 m | 13.5 m | 1.35x | | Morgan Stanley 2025 | $5/hour robot does 2 humans' work at $25/hour: NPV ~$200k | $18k a year per robot, ~$70k NPV | 0.35x | | Morgan Stanley; Citi 2024 | ~1 bn, $5tn; 650 m, $7tn (2050) | beyond 2035 | - | ## Gaps over 2x - **Goldman 2024 and UBS (4-7x lower):** they expect pilot-stage humanoids to scale slowly; the entry assumes the capability from 2028 and China's electric-car ramp (x1.69 a year). That is spread and capacity, not value. - **Morgan Stanley's value per robot (2.9x the machine's):** - US pay: a $20 an hour saving, against $9 at the world wage. - The machine counts one of each robot's two worker-equivalents; the other is in the baseline. Counting both gives ~$140k, within 2x. - **Acemoglu-Restrepo:** local job and pay losses are a channel the machine lacks (it has full employment, and lower pay is a transfer). Applied naively, they mean -0.7 points of employment and -1.4% pay. - **The 2050 trillions:** these are market sizes for fleets 50-75x larger, so they say nothing about 2035. ## Which I trust more **Fleet size:** neither. The bank forecasts span 1.4 to 24 million on unstated assumptions; the machine's stated record ramp lands mid-range. **Value:** the machine, cautiously: it is fleet times wage gap, and no source gives a 2035 output effect. Its trust is still low: 10 of 12 key numbers are assumed, and its largest unknowns (robots in 2035, work per robot) are where forecasts disagree. **Either way:** these robots add well under 1% of world GDP by 2035, because they are too few against 3 billion people doing physical work. Sources Source | Strength | Saved copy | Graetz and Michaels, Robots at work: the impact on productivity and jobs, CentrePiece Summ (https://cep.lse.ac.uk/pubs/download/cp447.pdf) | 1 | yes | Graetz and Michaels, CentrePiece Summer 2015 (as s_gm_price): robots per hour worked 1993- (https://cep.lse.ac.uk/pubs/download/cp447.pdf) | 1 | yes | Graetz and Michaels, CentrePiece Summer 2015 (as s_gm_price): contribution to annual GDP g (https://cep.lse.ac.uk/pubs/download/cp447.pdf) | 1 | yes | Graetz and Michaels, CentrePiece Summer 2015 (as s_gm_price): contribution to labour produ (https://cep.lse.ac.uk/pubs/download/cp447.pdf) | 1 | yes | IFR, World Robotics 2026 - Industrial Robots, Executive Summary. Copy of stage1-v2/agent4_ (https://ifr.org/img/worldrobotics/Executive_Summary_WR_2026_-_Industrial_Robots.pdf) | 1 | yes | IFR, World Robotics 2026 - Industrial Robots, Executive Summary (as s_ifr_inst): state of (https://ifr.org/img/worldrobotics/Executive_Summary_WR_2026_-_Industrial_Robots.pdf) | 1 | yes | Electric car sales (IEA Global EV Outlook via Our World in Data). Copy of stage1-v2/v1/age (https://ourworldindata.org/grapher/electric-car-sales.csv?v=1&csvType=full&useColumnShortNames=true) | 1 | yes | Electric car sales (IEA via OWID), as s_owid_ev14: China 2023 (https://ourworldindata.org/grapher/electric-car-sales.csv?v=1&csvType=full&useColumnShortNames=true) | 1 | yes | Counterpoint Research, Global humanoid robot shipments soar nearly 300% YoY in H1 2026 (qu (https://counterpointresearch.com/en/insights/global-humanoid-robot-shipments-soar-nearly-300-percent-yoy-in-h1-2026) | 3 | search only | Morgan Stanley note (analysts led by Adam Jonas) as reported by Investing.com: 1 humanoid (https://ng.investing.com/news/stock-market-news/1-humanoid-robot-at-5hour-can-do-the-work-of-2-humans-at-25hour-ms-2053594) | 3 | search only | Digital Trends, Tesla Optimus Gen 2 price range (search result only) (https://digitaltrends.com/cool-tech/tesla-optimus-gen-2-price-range) | 3 | search only | Hamermesh, NBER chapter c10078 (consensus constant-output own-wage elasticity of aggregate (https://www.nber.org/chapters/c10078.pdf) | 1 | search only | Lichter, Peichl and Siegloch (2015), The own-wage elasticity of labor demand: a meta-regre (https://www.econlib.org/archives/2016/08/labor_demand_el.html) | 1 | search only | ILO (2018), Care work and care jobs for the future of decent work, press release (search r (https://www.ilo.org/resource/news/ilo-calls-urgent-action-prevent-looming-global-care-crisis) | 1 | search only | ILO (2024), Unpaid care work prevents 708 million women from participating in the labour m (https://www.ilo.org/resource/news/unpaid-care-work-prevents-708-million-women-participating-labour-market) | 1 | search only | ILO (2023), A call for safer and healthier working environments, news release (search resu (https://www.ilo.org/resource/news/nearly-3-million-people-die-work-related-accidents-and-diseases) | 1 | search only | OECD (2025), Mortality risk valuation in policy assessment: recommended VSL estimates for (https://www.oecd.org/en/publications/mortality-risk-valuation-in-policy-assessment_76ca89a2-en/full-report/recommended-vsl-estimates-for-policy-analysis_9b41dca3.html) | 2 | search only | Foundation for American Innovation (E. Alden), The robot boom has a magnet problem (quote (https://policygradients.thefai.org/p/the-robot-boom-has-a-magnet-problem) | 3 | search only | Goldman Sachs Research, The global market for robots could reach $38 billion by 2035 (Feb (https://www.goldmansachs.com/insights/articles/the-global-market-for-robots-could-reach-38-billion-by-2035) | 3 | search only | Origin of Bots, Goldman Sachs supercharges global humanoid robot forecast nearly 5x to 6.5 (https://www.originofbots.com/news/goldman-sachs-supercharges-global-humanoid-robot-forecast-nearly-5x-to-65-million-annual-units-by-2035) | 3 | search only | Morgan Stanley, Humanoids: a $5 trillion market (May 2025; search result only) (https://www.morganstanley.com/insights/articles/humanoid-robot-market-5-trillion-by-2050) | 3 | search only | Citi GPS, The rise of AI robots: humanoids are coming for you (Nov 2024; search result onl (https://www.citigroup.com/global/insights/the-rise-of-ai-robots-humanoids-are-coming-for-you) | 3 | search only | Acemoglu and Restrepo (2020), Robots and jobs: evidence from US labor markets, Journal of (https://econpapers.repec.org/RePEc:ucp:jpolec:doi:10.1086/705716) | 1 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/robots_general.yaml (https://world.abundancemachines.si/data/v7/capabilities/robots_general.yaml) Electricity at a fraction of today's cost https://world.abundancemachines.si/guide/idea-electricity-cheap.html Electricity delivered to homes, firms and machines anywhere at about $45 per MWh (2026 int$ per MWh delivered to final users), a third of today's average price of about $136 per MWh, made with far fewer resources per kWh (cheaper generation, storage and delivery), reaching 1% of the world's electricity in 2028. Result Measure | Value | Share of the gap filled, median across the draws | 0.08% | 80% range | 0.0% to 0.17% | Dollars a year in 2035 (median) | $0.1T | Growth points a year (median) | 0.01 | Median economy, the entry as written | 0.11%: $0.2T tier 1, $0B tier 2 | What people buy (path a), above on course | $0.2T | What inputs allow (path b), above on course | $37.2T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 52.6%; Construction trades in 26.9%; Physical machine labour (robots) in 20.5% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 4.5% | Price against the next-best option | 45.4 against 136 (2026 int$ per MWh of electricity delivered to final users) | Value to people beyond measured GDP (not added) | $0.1T | Possible extra from unsourced knock-ons (not added) | $0B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.11% / 0.11% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (10 of 12 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | electricity_cheap d1: cost on K01 (MWh of electricity delivered to final users a year) | 37,412,000,000 | 38,254,796,914 | 136 | 45.4 | $0.2T | b | electricity_cheap ch1: supply K01 | | | | | | b | electricity_cheap ch2: recipe K21 ALL | | | | | | b | electricity_cheap ch3: recipe LAB ALL | | | | | | b | electricity_cheap ch4: recipe K18 ALL | | | | | | result | path (a) on course + gains | | | | | $290.4T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.4T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $0.2T | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 2.6% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | E | 0.17% | 0.09% | [E] from Ember, Yearly electricity data (global release): World, 2015, Solar (share of generation, %, is the 10th field); extract of stage1-v2/agent6_cheap_inputs/raw/ember_yearly/release_generation_yearly_global.csv (strength 1); Ember, Yearly electricity data (global release): World, 2025, Solar; extract of stage1-v2/agent6_cheap_inputs/raw/ember_yearly/release_generation_yearly_global.csv (strength 1). A second, independent measure of how fast comparable products spread from 10% to 90% of buyers would confirm it. | spread.max_share | A | 0.06% | 0.11% | [A] now. Settled by a study of the share of buyers who would ever switch (adoption studies). | For the profit-machine: gross value added in 2035 $37B; price against the next-best option 33.3%; capital per dollar of output 2.56. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 136 | 0.0% (0.0% to 0.0%) | buyers | Physical machine labour (robots) | no | 109 | 0.02% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | no | 81.8 | 0.05% (0.0% to 0.09%) | buyers | Physical machine labour (robots) | no | 54.5 | 0.07% (0.0% to 0.15%) | buyers | Physical machine labour (robots) | no | 45.4 | 0.08% (0.0% to 0.17%) | buyers | Physical machine labour (robots) | no | 34.1 | 0.10% (0.0% to 0.20%) | buyers | Physical machine labour (robots) | yes | 20.4 | 0.12% (0.0% to 0.24%) | buyers | Physical machine labour (robots) | yes | 13.6 | 0.13% (0.0% to 0.27%) | buyers | Physical machine labour (robots) | yes | 6.82 | 0.15% (0.0% to 0.30%) | buyers | Physical machine labour (robots) | yes | 2.73 | 0.16% (0.0% to 0.32%) | buyers | Physical machine labour (robots) | yes | 1.36 | 0.16% (0.0% to 0.33%) | buyers | Physical machine labour (robots) | yes | 0.136 | 0.17% (0.0% to 0.34%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # electricity_cheap: comparison with published estimates **Machine (world, 2035, $45.43 against $136.3 per MWh, a 67% fall):** $182B a year as written, $139B as the median of the draws (80% range $0B to $271B). That is about 0.05% of on-course world GDP ($290T): 4.49% of the market has it, and buyers limit it. With every user on the new price, the same curve gives $4.0T, 1.39% of GDP. "Machine at their fall" applies that curve (spending of 1.76% of GDP, elasticity -0.37, all users) to each study's own price fall. **Every number below was read only in a search snippet (full texts would not open): each is strength 3 at best and unsaved.** | Estimate (strongest first) | Their number | Machine at their fall | Ratio | |---|---|---|---| | Hausman & Kellogg 2015, US shale gas (past case), about 47% cheaper | $74B a year to consumers, $48B net | counts the whole saving as resources | net = 0.65 x consumer gain | | Arkolakis & Walsh 2024, US, power 20-80% cheaper | real wages up 2-3% | 0.37-1.78% of GDP (0.99% at 50%) | theirs about 2.5x | | Mehrotra, discussion of that paper | wholesale prices fall only 10-20% | 0.27% at 15% | a price dispute | | Sense Partners for NZ MBIE | GDP elasticity to the electricity price of -0.02 to -0.04, so 1.3-2.7% at 67% (my extrapolation) | 1.39% | within 2x | | Arkolakis & Walsh 2022 draft, world, 76% cheaper | real wages up 6% | 1.65% | theirs 3.6x | | Way et al. 2022 (Joule), fast renewable transition | at least $12T saved to 2070 | none | whole energy system | **Why they differ** 1. *Spread.* Every study is long run, with all users on cheap power. In 2035 the machine has 4.49% of them (solar's world pace), so its result is 20 to over 100 times smaller. That is timing, not size. 2. *A missing channel.* Arkolakis and Walsh's gain comes from electricity-intensive industry moving to and growing in places with cheap sun. The machine counts no relocation. Even with Burke's US elasticity of -1.0 it gives 1.93% at a 67% fall. The 6% draft was replaced by the later paper, and the discussant thinks the price falls are too large. 3. *Transfers.* In the shale case, a third of the consumers' gain was the producers' loss. The machine treats the price as the resource cost, which is too high where cheap plants lower a price that expensive plants set (not mapped). **Which I trust.** For 2035 I trust the machine, because no estimate models the spread, which drives the result. With every user on the new price, the machine's 1.4% of GDP agrees with the NZ elasticity, and I trust it more than the 6% draft. It is probably low, by up to 2x, because it lacks the relocation channel. The machine's trust is low, and no estimate was read in full. Sources Source | Strength | Saved copy | IEA, World Energy Outlook 2025, Annex A, Table A.2a World total final consumption (Current (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025, Annex A, Table A.3a World electricity sector (gross genera (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025, Annex A, Table A.5a World economic and activity indicators (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 2 | yes | IEA, World Energy Outlook 2025, Annex A, Table A.5a, CO2 intensity of electricity generati (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 2 | yes | IEA, World Energy Outlook 2025, Annex B, Table B.4a Technology costs in selected regions ( (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 2 | yes | Our World in Data, energy dataset: Norway, 2024 (columns country, year, iso_code, populati (https://owid-public.owid.io/data/energy/owid-energy-data.csv) | 1 | yes | Ember, Yearly electricity data (global release): World, 2015, Solar (share of generation, (https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv) | 1 | yes | Ember, Yearly electricity data (global release): World, 2025, Solar; extract of stage1-v2/ (https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv) | 1 | yes | Ember, Yearly electricity data (global release): Netherlands, 2015, Solar; extract of stag (https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv) | 1 | yes | Ember, Yearly electricity data (global release): Netherlands, 2024, Solar; extract of stag (https://files.ember-energy.org/public-downloads/generation/outputs/release_generation_yearly_global.csv) | 1 | yes | WIOD Socio Economic Accounts (2016 release), 2014: industry D35 (electricity, gas, steam a (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | Labandeira, Labeaga and Lopez-Otero (2017), A meta-analysis on the price elasticity of ene (https://econpapers.repec.org/RePEc:eee:enepol:v:102:y:2017:i:c:p:549-568) | 1 | search only | Burke and Abayasekara (2018), The price elasticity of electricity demand in the United Sta (https://openresearch-repository.anu.edu.au/handle/1885/141161) | 1 | search only | Arkolakis and Walsh, Clean Growth (2022 draft; NBER working paper 31615, 2023); search sni (https://economics.yale.edu/sites/default/files/2022-11/Clean-Growth.pdf) | 2 | search only | Arkolakis and Walsh, The Economic Impacts of Clean Power, Brookings Papers on Economic Act (https://www.brookings.edu/wp-content/uploads/2024/09/3_ArkolakisWalsh.pdf) | 2 | search only | Hausman and Kellogg (2015), Welfare and Distributional Implications of Shale Gas, Brooking (https://www.nber.org/papers/w21115) | 1 | search only | US EPA (2023), Report on the Social Cost of Greenhouse Gases, as summarised in search resu (https://media.rff.org/documents/Report_26-11_Final.pdf) | 2 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/electricity_cheap.yaml (https://world.abundancemachines.si/data/v7/capabilities/electricity_cheap.yaml) Transformers and grid equipment built far faster https://world.abundancemachines.si/guide/idea-grid-equipment-fast.html Transformers, switchgear and other grid equipment made and delivered in about a month (today large power transformers take two to four years), available from 2028, so power plants, grid lines and data centres no longer stand idle waiting for their equipment: the waiting cost falls from about 6.0 to about 0.75 cents per dollar of equipment in those projects (2026 int$ of waiting cost per $ of equipment in grid-connected projects, C14). Result Measure | Value | Share of the gap filled, median across the draws | 0.01% | 80% range | 0.0% to 0.05% | Dollars a year in 2035 (median) | $18B | Growth points a year (median) | 0.00 | Median economy, the entry as written | 0.03%: $41B tier 1, $0B tier 2 | What people buy (path a), above on course | $41B | What inputs allow (path b), above on course | $37.1T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 52.6%; Construction trades in 26.9%; Physical machine labour (robots) in 20.5% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 56.7% | Price against the next-best option | 0.00751 against 0.06 (2026 int$ of waiting cost per $ of equipment in grid-connected power, grid and data-centre projects (C14)) | Value to people beyond measured GDP (not added) | $0.2T | Possible extra from unsourced knock-ons (not added) | $0B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.03% / 0.03% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (8 of 9 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | grid_equipment_fast d1: cost on new:equipment_wait ($ of equipment (C14) in grid-connected power, grid and data-centre projects a year, at today's equipment prices) | 1,340,353,101,811 | 1,377,009,292,274 | 0.06 | 0.00751 | $41B | b | grid_equipment_fast ch2: supply K21 | | | | | | result | path (a) on course + gains | | | | | $290.3T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.3T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $41B | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | next_best.price | A | 0.01% | 0.06% | [A] now. Settled by a study of today's price of the next-best option. | available_year | A | 0.04% | 0.0% | [A] now. Settled by a study of when it is available. | demand[0].Q0.factor | A | 0.01% | 0.05% | [A] now. Settled by a study of how many units each bn of output is. | For the profit-machine: gross value added in 2035 $2B; price against the next-best option 12.5%; capital per dollar of output 0.8. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 0.06 | 0.0% (0.0% to 0.01%) | buyers | Physical machine labour (robots) | no | 0.048 | 0.00% (0.0% to 0.02%) | buyers | Physical machine labour (robots) | no | 0.036 | 0.00% (0.0% to 0.03%) | buyers | Physical machine labour (robots) | no | 0.024 | 0.01% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | no | 0.015 | 0.01% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | no | 0.00901 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | 0.00751 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | 0.006 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | 0.003 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | 0.0012 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | 0.0006 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | 6e-05 | 0.01% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | no | The research agent's comparison with published estimates # grid_equipment_fast: comparison with published estimates **Machine (world, 2035):** the wait for grid equipment falls from 8 months to 1, priced at 0.75 cents per $ of equipment per month. With 56.7% of projects using it, that gives $41B a year as written, $18B as the median of the draws (80% range $0B to $78B), and under 0.02% of world GDP. Buyers limit it. With every project using it the gain is $72B, and about $143B if the structures half of each project (not mapped) were counted. **No published estimate of the GDP effect of grid-equipment delays was found. Every figure below was read only in search snippets (full texts would not open): each is strength 3 at best and unsaved.** | Estimate (strongest first) | Their number | Same scale as the machine | Ratio | |---|---|---|---| | IEA 2023, Grid Delay Case (world, all causes of grid delay) | +58 Gt CO2 to 2050 | about 2-3 Gt a year (my division, 2025-2050); machine 0.68 Gt in 2035 | IEA 3-4x higher | | IEA 2023, same report | outages cost about $100B a year (0.1% of GDP) | a channel the machine lacks (faster repairs) | not comparable | | Wood Mackenzie 2025, US | 30% of power-transformer demand unmet | machine's world on-course shortfall in 2035: 3.9% | size of the wait, not its cost | | Trade press 2025-26, plus analysts' delay costs (new) | 7 GW of US AI data centres delayed; $150-237M per GW-month | $13-20B a year of delay; machine at $11M per MW (JLL): $7B for whole projects, $3.5B for the equipment half | theirs 2-6x higher | **Why they differ** 1. *Scope.* The IEA case covers every cause of slow grids (lines, permits, queues, finance), not only equipment. The machine's CO2 also rests on 1,720.7 TWh that the red team removed as double counted (RT18), so that figure is shaky. 2. *Timing and spread.* The trade figures describe 2025-26, the peak of the shortage. In 2035, 57% of projects have the capability in the machine. 3. *Price of a month.* The data-centre figures count lost revenue from scarce AI compute (17% returns are quoted), including servers that sit waiting. The machine uses the economy's average 9% return on idle capital, and only on the equipment half. Part of the lost revenue is deferred rather than lost. 4. *Missing channels.* Reliability, the latent transformer limit near 7.8% growth, and data centres connected sooner (carried in permits_grid_fast) are all outside this entry. **Which I trust.** For the world in 2035, the machine: nothing published measures this effect, and the trade figures cover one country at the peak of a shortage. But the machine is probably low by 2 to 4 times, because it leaves out the structures half and prices waiting at the average return. The machine's trust is low, and its result is tens of billions of dollars a year either way. Sources Source | Strength | Saved copy | IEA, World Energy Outlook 2025 (investment in generation and grids); saved copy from stage (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025 (investment in data centres); saved copy from stage1-v2/age (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025, chapter 3 (grid investment needs, Current Policies Scenari (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 2 | yes | IEA, World Energy Outlook 2025, chapter 3 (grid supply chains); saved copy from stage1-v2/ (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025, chapter 4 (grids); saved copy from stage1-v2/agent4_bottle (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, World Energy Outlook 2025, chapter 1 (data centres); saved copy from stage1-v2/agent4 (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IEA, Global Critical Minerals Outlook 2026, chapter 3 (copper in transformers and cables); (https://iea.blob.core.windows.net/assets/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf) | 1 | yes | IEA, Global Critical Minerals Outlook 2026, chapter 3 (copper share of transformer price); (https://iea.blob.core.windows.net/assets/19c60aa0-ee07-4a20-a138-33c967ac5008/GlobalCriticalMineralsOutlook2026.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition (Rand et al., June 2026), interconnection agreement to comme (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition, interconnection agreement to commercial operation; saved co (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | LBNL, Queued Up: 2026 Edition, causes of long agreement-to-operation times; saved copy fro (https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf) | 1 | yes | Wood Mackenzie, power transformer lead times (Q2 2025 survey), as reported in search resul (https://www.woodmac.com/news/opinion/mind-the-gap-tackling-supply-chain-challenges-in-the-electric-td-sector/) | 3 | search only | Wood Mackenzie, 'Supply shortages and an inflexible market give rise to high power transfo (https://www.woodmac.com/news/opinion/supply-shortages-and-an-inflexible-market-give-rise-to-high-power-transformer-lead-times/) | 3 | search only | Wood Mackenzie, 'Supply shortages and an inflexible market give rise to high power transfo (https://www.woodmac.com/news/opinion/supply-shortages-and-an-inflexible-market-give-rise-to-high-power-transformer-lead-times/) | 3 | search only | Wood Mackenzie (September 2025), power and distribution transformer supply deficit, as rep (https://www.powermag.com/wp-content/uploads/2026/01/making-the-connection-executive-summary-september-2025.pdf) | 3 | search only | Wood Mackenzie, transformer market outlook, as reported in search results; search snippet (https://www.woodmac.com/news/opinion/supply-shortages-and-an-inflexible-market-give-rise-to-high-power-transformer-lead-times/) | 3 | search only | NREL (2024), Major Drivers of Long-Term Distribution Transformer Demand (NREL/TP-6A40-8765 (https://www.nrel.gov/docs/fy24osti/87653.pdf) | 2 | search only | Utility Dive, electric transformer shortage (NREL, NIAC), quoting a NEMA official; search (https://www.utilitydive.com/news/electric-transformer-shortage-nrel-niac/738947/) | 3 | search only | Trade press on distribution transformer procurement before the shortage; search snippet on (https://www.fastcompany.com/91442349/supply-chain-delays-transformers-push-power-grid) | 3 | search only | Virginia Transformer, Rincon (Georgia) expansion, as reported by Supply Chain Dive (press (https://www.supplychaindive.com/press-release/20251120-virginia-transformer-to-expand-georgia-transformer-plant-in-rincon-ga-to/) | 3 | search only | WEG US transformer capacity investment, as reported in search results; search snippet only (https://www.tdworld.com/utility-business/news/55412969/powering-the-grid-manufacturers-boost-north-american-transformer-supply-capabilities-through-stronger-domestic-investments) | 3 | search only | Siemens Energy large power transformer plant, Charlotte NC, as reported in search results; (https://enkiai.com/data-center/siemens-energy-power-transformer-2027-421m-nc-plant/) | 3 | search only | Hitachi Energy, Varennes (Quebec) transformer investment, as reported in search results; s (https://www.utilitydive.com/news/hitachi-energy-expands-transformer-factories-pennsylvania-virginia-mexico/728308/) | 3 | search only | Labandeira, Labeaga and Lopez-Otero (2017), A meta-analysis on the price elasticity of ene (https://econpapers.repec.org/RePEc:eee:enepol:v:102:y:2017:i:c:p:549-568) | 2 | search only | IEA (2023), Electricity Grids and Secure Energy Transitions, executive summary (Grid Delay (https://www.iea.org/reports/electricity-grids-and-secure-energy-transitions/executive-summary) | 2 | search only | EnkiAI, 'Power Transformer Shortages Delay 7 GW of AI Projects and 2,500 GW of Renewables (https://enkiai.com/data-center/grid-shortage-pjm-ercot-data/) | 3 | search only | Resources for the Future, Report 26-11 (EPA 2023 social cost of carbon in 2026 dollars); s (https://media.rff.org/documents/Report_26-11_Final.pdf) | 2 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/grid_equipment_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/grid_equipment_fast.yaml) Much faster clinical approval https://world.abundancemachines.si/guide/idea-clinical-approval-fast.html From 2028 the rules for testing and approving new medicines (trial requirements and regulatory review) let a new medicine go from its first human trial to approval in about 4 years instead of about 8, with the same trials run and reviewed faster, so the time cost of bringing one new medicine to patients (the return forgone on the money tied up in its development until approval) falls from about 1.66 to about 0.76 billion int$ (2026) per new medicine approved. Result Measure | Value | Share of the gap filled, median across the draws | 0.01% | 80% range | 0.0% to 0.03% | Dollars a year in 2035 (median) | $16B | Growth points a year (median) | 0.00 | Median economy, the entry as written | 0.03%: $42B tier 1, $0B tier 2 | What people buy (path a), above on course | $42B | What inputs allow (path b), above on course | $37.1T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 52.6%; Construction trades in 26.9%; Physical machine labour (robots) in 20.5% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 74.3% | Price against the next-best option | 758,414,458 against 1,659,496,921 (2026 int$ of time cost (return forgone on capital tied up in development until approval) per new medicine approved) | Value to people beyond measured GDP (not added) | $3.3T | Possible extra from unsourced knock-ons (not added) | $27B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.03% / 0.03% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (10 of 10 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | clinical_approval_fast d1: cost on new:faster_approval (new medicines approved a year (world)) | 60 | 64.2 | 1,659,496,921 | 758,414,458 | $42B | b | clinical_approval_fast ch1: recipe K21 C05 | | | | | | result | path (a) on course + gains | | | | | $290.3T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.3T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $42B | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | next_best.price | A | 0.01% | 0.04% | [A] now. Settled by a study of today's price of the next-best option. | available_year | A | 0.03% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 0.03% | 0.01% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | For the profit-machine: gross value added in 2035 $23B; price against the next-best option 45.7%; capital per dollar of output 1.3. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 1,659,496,921 | 0.0% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 1,327,597,537 | 0.00% (0.0% to 0.01%) | buyers | Physical machine labour (robots) | no | 995,698,153 | 0.01% (0.0% to 0.02%) | buyers | Physical machine labour (robots) | no | 758,414,458 | 0.01% (0.0% to 0.03%) | buyers | Physical machine labour (robots) | no | 663,798,768 | 0.01% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | no | 414,874,230 | 0.02% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | yes | 248,924,538 | 0.02% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | yes | 165,949,692 | 0.02% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | yes | 82,974,846 | 0.02% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | 33,189,938 | 0.02% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | 16,594,969 | 0.02% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | 1,659,497 | 0.02% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # clinical_approval_fast: comparison with published estimates **Machine (2035, 2026 int$):** Medicines are approved 3.96 years sooner, with 74.3% of medicines under the faster rules. Measured GDP: $42B (median economy; draws' median $16B), almost all time cost saved ($228M per medicine-year sooner, 176 medicine-years). Workers would add $27B (not added). Value beyond GDP is $3.3T: 44M DALYs, about 11M per year of speed-up. All estimates were read only in search snippets: strength 3 at best. Per-year figures scale linearly to 3.96 years. Ratio = machine / estimate. | Estimate (strongest first) | Their number | Machine's scale | Machine | Ratio | |---|---|---|---|---| | Philipson et al. 2008, PDUFA, after the fact (US) | 140-310k life-years; producers $7-11bn; 10 cohorts each about 1 year faster [A] | 14-31k per cohort-year x 25 (population, upper bound) = 0.35-0.8M; producers x 3.96 x 0.743 x 2.2 (world/US sales [A]) = $4.5-7bn | 11M DALYs; $42B | 15-30; 6-9 | | Wilmoth 2015, Health Econ. (new) | $60M to a firm per year less delay | per medicine-year | $228M | 3.8 | | Tufts CSDD 2024 (new) | $0.5-0.8M of sales per day of delay | $183-292M a year | $228M | 0.8-1.2 | | Philipson & Sun 2010 | a firm saves $40M per year less phase III; patients gain $8-19bn (trastuzumab), $0.3bn (rituximab, new) | per medicine-year; machine's US share \u2248 12% [A] | $228M; $2.3bn | 5.7; between | | Philipson 2026, advocacy | US $10T (1 year) to $49T (6 years) | \u2248 $33T x 3% \u2248 $1.0T a year | US $0.4T | 0.4 | Lichtenberg 2014 is not a check: its 1.27 years of life expectancy is an input of the entry. Smith, Newhouse and Freeland 2009 (technology drives 27-48% of spending growth) has no scale. ## Where they differ by more than 2x - **Measured GDP, 4-9x the firm figures.** The machine's price is DiMasi's mean capitalised cost per approval at a real 10.5%, failures included. The firm figures are for a typical drug, mostly at the review stage. Tufts' sales are shifted in time, not lost. The draws' median ($16B) is near Wilmoth's figure scaled up ($10.6B). - **Value beyond GDP, 15-30x PDUFA.** The machine credits half the fall in world DALY rates to new medicines. It treats every medicine in use as four years ahead (the entry's own upper bound), the world as served by the first approval, and leaves out harm from withdrawn medicines. PDUFA counted actual US life-years. - **Philipson 2026:** it uses US values of life for all future generations, and it is about 100x the same author's 2008 estimate per year of speed-up. ## Which I trust more On value beyond GDP I trust Philipson et al. 2008: it is peer-reviewed and after the fact. The machine's $3.3T is an upper bound, perhaps ten times too high. On measured GDP the machine counts the right channel at about 4x what firms report, so $10-16B is likelier than $42B. Every reading stays below 0.02% of world output. Sources Source | Strength | Saved copy | GBD 2023 Disease and Injury and Risk Factor Collaborators, Burden of 375 diseases and inju (https://www.ebi.ac.uk/europepmc/webservices/rest/search?query=EXT_ID:41092926%20AND%20SRC:MED&resultType=core&format=json) | 1 | yes | GBD 2023 (as gbd_dalys): fall in age-standardised DALY rates, 2010-2023 (https://www.ebi.ac.uk/europepmc/webservices/rest/search?query=EXT_ID:41092926%20AND%20SRC:MED&resultType=core&format=json) | 1 | yes | FRED series CPIAUCSL (US consumer price index, all urban consumers, monthly). Copy of stag (https://fred.stlouisfed.org/graph/fredgraph.csv?id=CPIAUCSL) | 1 | yes | UN World Population Prospects 2024, population by five-year age group, medium variant: Wor (https://population.un.org/wpp/assets/Excel%20Files/1_Indicator%20(Standard)/CSV_FILES/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) | 2 | yes | Tufts CSDD briefing on the R&D cost study (DiMasi, Grabowski and Hansen), 18 November 2014 (https://www.keionline.org/wp-content/uploads/2017/10/Tufts_CSDD_briefing_on_RD_cost_study_-_Nov_18,_2014..pdf) | 2 | search only | DiMasi, Grabowski and Hansen, Innovation in the pharmaceutical industry: New estimates of (https://econpapers.repec.org/RePEc:eee:jhecon:v:47:y:2016:i:c:p:20-33) | 2 | search only | US Department of Health and Human Services, ASPE, report on drug development times and cos (https://aspe.hhs.gov/sites/default/files/documents/ba3c3c99877862bac0b1d04460ad01b1/drug-development.pdf) | 1 | search only | Wouters, McKee and Luyten, Estimated Research and Development Investment Needed to Bring a (https://cir.nii.ac.jp/crid/1360294742031014784) | 1 | search only | RAPS, CDER approved 50 novel drugs in 2024 (record number of biosimilars). Search snippet (https://www.raps.org/resource/cder-approved-50-novel-drugs-in-2024-record-numbe.html) | 3 | search only | Pink Sheet (Citeline), Podium Finish: US FDA's 61 Novel Approvals In 2024 Fall Short Of 20 (https://insights.citeline.com/pink-sheet/pink-sheet-perspectives/podium-finish-us-fdas-61-novel-approvals-in-2024-fall-short-of-2023-peak-but-exceed-average-7C7X5A6I4RF6RCZSOQ25UOYZJA/link-JDZRCNKOIBGDTGBXDETPYZMEIM) | 3 | search only | FDA Voices, CDER brings many safe and effective therapies to patients and consumers in 202 (https://www.fda.gov/news-events/fda-voices/cder-brings-many-safe-and-effective-therapies-patients-and-consumers-2024) | 1 | search only | GAO, Food and Drug Administration: Effect of User Fees on Drug Approval Times, Withdrawals (https://www.gao.gov/assets/gao-02-958.pdf) | 1 | search only | GAO-02-958 (as gao_pdufa): priority applications. Search snippet only (https://www.govinfo.gov/content/pkg/GAOREPORTS-GAO-02-958/html/GAOREPORTS-GAO-02-958.htm) | 1 | search only | GAO, Operation Warp Speed: vaccine development timeline. Search snippet only (https://ows.gaoinnovations.gov/development) | 1 | search only | Dubois, de Mouzon, Scott Morton and Seabright, Market size and pharmaceutical innovation, (https://www.tse-fr.eu/articles/market-size-and-pharmaceutical-innovation) | 1 | search only | Congressional Budget Office, CBO's Simulation Model of New Drug Development (Working Paper (https://www.ohe.org/wp-content/uploads/2022/06/57010-New-Drug-Development.pdf) | 2 | search only | Acemoglu and Linn, Market Size in Innovation: Theory and Evidence from the Pharmaceutical (https://www.nber.org/papers/w10038) | 1 | search only | Lichtenberg, Pharmaceutical Innovation and Longevity Growth in 30 Developing and High-inco (https://www.nber.org/papers/w18235) | 1 | search only | Philipson, Berndt, Gottschalk and Sun, Cost-benefit analysis of the FDA: The case of the p (https://econpapers.repec.org/RePEc:eee:pubeco:v:92:y:2008:i:5-6:p:1306-1325) | 1 | search only | Philipson et al. (NBER w11724, earlier version of philipson2008): upper bound on harm from (https://www.nber.org/papers/w11724.pdf) | 1 | search only | Philipson and Sun, Cost of Caution: The Impact on Patients of Delayed Drug Approvals (Manh (https://manhattan.institute/article/cost-of-caution-the-impact-on-patients-of-delayed-drug-approvals) | 3 | search only | Fox Business on Philipson (2026), The Multi-Trillion Dollar Opportunity in Reforming the F (https://www.foxbusiness.com/politics/economist-says-one-fda-fix-could-save-lives-add-10-trillion-economy) | 3 | search only | Smith, Newhouse and Freeland, Income, insurance, and technology: why does health spending (https://www.hks.harvard.edu/publications/income-insurance-and-technology-why-does-health-spending-outpace-economic-growth) | 2 | search only | Chang, Robinson, Hammitt and Resch, Economics in 'Global Health 2035': a sensitivity analy (https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5370212/) | 2 | search only | Chang et al. 2017 (as jamison_vly): alternative assumptions. Search snippet only (https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5370212/) | 2 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/clinical_approval_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/clinical_approval_fast.yaml) Tradespeople trained far faster https://world.abundancemachines.si/guide/idea-trades-training-fast.html Training that brings a new entrant to a qualified construction trade (bricklayer, carpenter, electrician, plumber and the other craft trades, ISCO 7) in about six months of intensive full-time training instead of about three years of apprenticeship, available from 2028, at about $17,900 per tradesperson trained against about $33,300 today (2026 int$ of resources per tradesperson trained: the output the trainee does not produce while learning, compared with a qualified tradesperson, plus instruction). Result Measure | Value | Share of the gap filled, median across the draws | 0.01% | 80% range | 0.0% to 0.06% | Dollars a year in 2035 (median) | $9B | Growth points a year (median) | 0.00 | Median economy, the entry as written | 0.01%: $20B tier 1, $0B tier 2 | What people buy (path a), above on course | $20B | What inputs allow (path b), above on course | $37.2T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 52.7%; Construction trades in 26.9%; Physical machine labour (robots) in 20.4% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 14.4% | Price against the next-best option | 17,928 against 33,345 (2026 int$ of resources per tradesperson trained (output forgone while learning, against a qualified tradesperson, plus instruction)) | Value to people beyond measured GDP (not added) | $0B | Possible extra from unsourced knock-ons (not added) | $37B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.01% / 0.01% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (11 of 11 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | trades_training_fast d1: cost on new:trades_training (tradespeople (construction trades, ISCO 7) trained a year) | 8,415,848 | 8,654,271 | 33,345 | 17,928 | $20B | b | trades_training_fast ch1: supply K17 | | | | | | b | trades_training_fast ch2: supply K18 | | | | | | result | path (a) on course + gains | | | | | $290.2T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.4T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $20B | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | available_year | A | 0.07% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 0.06% | 0.00% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | next_best.price | A | 0.0% | 0.04% | [A] now. Settled by a study of today's price of the next-best option. | For the profit-machine: gross value added in 2035 $16B; price against the next-best option 53.8%; capital per dollar of output 1. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 33,345 | 0.0% (0.0% to 0.02%) | buyers | Physical machine labour (robots) | no | 26,676 | 0.00% (0.0% to 0.04%) | buyers | Physical machine labour (robots) | yes | 20,007 | 0.00% (0.0% to 0.05%) | buyers | Physical machine labour (robots) | yes | 17,928 | 0.01% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | 13,338 | 0.01% (0.0% to 0.07%) | buyers | Physical machine labour (robots) | yes | 8,336 | 0.01% (0.0% to 0.08%) | buyers | Physical machine labour (robots) | yes | 5,002 | 0.02% (0.0% to 0.10%) | buyers | Physical machine labour (robots) | yes | 3,334 | 0.02% (0.0% to 0.10%) | buyers | Physical machine labour (robots) | yes | 1,667 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | 667 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | 333 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | 33.3 | 0.02% (0.0% to 0.11%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # trades_training_fast: comparison with published estimates **Machine (2035, 2026 int$, price 17,928 against 33,345):** $20B measured GDP (median economy; 0.007% of world output; draws' median $9B): $18.6B training resources saved on 1.2M tradespeople, $1.6B from 0.24M extra trainees. Freed capital from delayed buildings: $37B (not added). Spread 14.4%. All estimates were read only in search snippets: strength 3 at best. None measures faster training itself. Ratio = machine / estimate. | Estimate (strongest first) | Their number | Machine's scale, 2035 | Machine | Ratio | |---|---|---|---|---| | Reed et al. 2012, Mathematica for US DOL, non-experimental (new) | apprenticeship's social net benefit >$49,000 per apprentice | \u2248 $22,700 at model pay (US trades pay 2.16x, ILO saved copy) | $7,700 per extra trainee | 0.34 | | NAHB-HBI 2025, US single-family | $10.8bn a year: delay $2.66bn, 19,000 homes lost $8.14bn; 2.5% of $433bn building (Census, new) | x 25% of world construction $69.7T [A] x 0.144: delay $15bn, lost output $47bn | delay $37B (not added); lost output none | 2.4; 0 | | Bring Back the Trades / F.W. Webb, advocacy (new) | US trades gap costs $326bn of GDP a year (\u22481.1% [A]) | 1.1% x $290T x 0.144 \u2248 $460bn | $20B (+$37B) | 0.04 (0.12) | | CITB 2025-29; ABC 2025 | need 1.8% (UK) and 3.5% (US, against ILO's 12.6M) of workers a year | sizes of need | on-course growth 2.3% a year; method adds 0.27% of workers by 2035 | | ## Where they differ by more than 2x - **Reed (3x):** cost mode values an extra trainee at half the price cut (training worth its cost at the margin); Reed finds it pays far more. At Reed's value the total rises only about $4B. - **NAHB delay (2.4x):** the machine's knock-on takes NAHB's own 1.98 months, so it is not an independent check. It values freed capital at about 9% a year; NAHB's carrying cost implies 3.7%. - **NAHB lost homes:** a channel the machine does not have. World construction labour does not bind in the median economy (buyers limit, $37T of room), and shortages of particular trades in one market have no model number. If such local shortages are common, the machine misses up to about $47B at the 2035 spread. - **Bring Back the Trades (25x):** it counts unfilled jobs at full output, as if new tradespeople were extra people rather than moved from other work. It covers all trades and is advocacy. - A 2012 English reform lengthening apprenticeships cut starts but raised earnings (Economics of Education Review 2019, new, no number): shorter training may lower skill, not mapped. ## Which I trust more No estimate covers the machine's main channel (three years of learning cut to six months), so $20B rests on its assumptions: all 11 key numbers assumed; the elasticity covers only the top tenth of the price range but drives only $1.6B. Where trade shortages hold up building, I trust NAHB's evidence that the machine misses a channel. With NAHB's delay and lost-output channels the gain could reach about four times $20B ($82B), under 0.03% of world output. I give the advocacy figure no weight. Sources Source | Strength | Saved copy | ILOSTAT, Employment by sex, economic activity and occupation (thousands), DF_EMP_TEMP_ECO_ (https://sdmx.ilo.org/rest/data/ILO,DF_EMP_TEMP_ECO_OCU_NB,1.0/{country}.A....?startPeriod=2015) | 1 | yes | ILOSTAT, Mean nominal monthly earnings of employees by sex and occupation, DF_EAR_EMTA_SEX (https://sdmx.ilo.org/rest/data/ILO,DF_EAR_EMTA_SEX_OCU_CUR_NB,1.0/{country}.A..SEX_T..?startPeriod=2015) | 1 | yes | Denning (2017), College on the Cheap: Consequences of Community College Tuition Reductions (https://www.aeaweb.org/research/texas-tuition-cuts-preview-free-community-college) | 1 | search only | Aepli, Wenzelmann, Wolter et al. (2024), The impact of hiring costs for skilled workers on (https://docs.iza.org/dp16919.pdf) | 2 | search only | Schoenfeld et al., Training in Germany: an investment to counter the skilled worker shorta (https://bibb.de/dienst/publikationen/de/download/16745) | 1 | search only | Delaware Department of Labor, apprenticeship page (US registered apprenticeship standards) (https://labor.delaware.gov/tag/veterans/?p=486) | 1 | search only | EU capacity4dev / GIZ guidance note on informal apprenticeship; search snippet only (an IL (https://capacity4dev.europa.eu/media/30337/download/63faad92-7dc1-4edc-a51f-9d87e5b8755a_en) | 3 | search only | US Bureau of Labor Statistics (1945), Employment Opportunities for Welders, Bulletin 844 ( (https://fraser.stlouisfed.org/files/docs/publications/bls/bls_0844_1945.pdf) | 1 | search only | NAHB press release (June 2025), New Study Reveals Significant Economic Impact of Housing I (https://www.nahb.org/news-and-economics/press-releases/2025/06/new-study-reveals-significant-economic-impact-of-housing-industry-labor-shortage) | 3 | search only | CITB Construction Workforce Outlook 2025-29 (as reported by the trade press); search snipp (https://www.citb.co.uk/cwo/reports/cwo_explained.pdf) | 3 | search only | Associated Builders and Contractors (January 2025), Construction Industry Must Attract 439 (https://constructionexec.com/article/construction-industry-must-attract-439-000-workers-in-2025) | 3 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/trades_training_fast.yaml (https://world.abundancemachines.si/data/v7/capabilities/trades_training_fast.yaml) Moon travel at $100 a trip https://world.abundancemachines.si/guide/idea-moon-travel-100.html A return trip for one passenger from Earth's surface to the Moon's surface and back, about a week, with seat, air, food and water on board (lodging on the Moon not included), sold at 100 int$ (2026, PPP) per trip from 2030, against about 65 million int$ for the nearest product sold today, a seat on a private crewed orbital flight of several days. Result Measure | Value | Share of the gap filled, median across the draws | 0.00% | 80% range | 0.0% to 0.06% | Dollars a year in 2035 (median) | $2B | Growth points a year (median) | 0.00 | Median economy, the entry as written | 0.00%: $1B tier 1, $0B tier 2 | What people buy (path a), above on course | $1B | What inputs allow (path b), above on course | $37.1T | What limits it | buyers | Runs short next, across the 1,000 runs | Cropland in 51.9%; Construction trades in 26.5%; Physical machine labour (robots) in 20.0%; Electricity in 1.6% | Runs short next, middle case (the receipt) | Physical machine labour (robots), then Cropland | Share of its market using it in 2035 | 6.9% | Price against the next-best option | 100 against 65,000,000 (2026 int$ per return trip (Earth's surface to the Moon's surface and back, one passenger)) | Value to people beyond measured GDP (not added) | $0B | Possible extra from unsourced knock-ons (not added) | $0B | Starting numbers both ways (A2): stage1-v5 / replaced | 0.00% / 0.00% | Trust | low: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (9 of 9 key numbers assumed); no key number rests on a saved source | Receipt Step | What | Units on course | Units with | Old price | New price | Gain | a | moon_travel_100 d1: cost on new:moon_trip (return trips to the Moon a year (one passenger each)) | 12 | 923,185 | 65,000,000 | 100 | $1B | b | moon_travel_100 ch1: own_output | | | | | | result | path (a) on course + gains | | | | | $290.2T | result | path (b) most output before K04 passes its record-pace supply | | | | | $327.3T | result | result = smallest of (a), (b), target; minus on course = gap filled (buyers limit) | | | | | $1B | What would change this answer Number | Label | Gap at low | Gap at high | Evidence that would settle it | demand[0].elasticity | A | 0.00% | 0.09% | [A] now. Settled by a study of how much more people buy as the price falls, measured over this price range. | available_year | A | 0.01% | 0.0% | [A] now. Settled by a study of when it is available. | spread.years_10_to_90 | A | 0.00% | 0.00% | [A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers. | For the profit-machine: gross value added in 2035 $0B; price against the next-best option 0.00%; capital per dollar of output 0.724. At other prices Price | Share of the gap, median (80% range) | Limit | Runs short next | Beyond the demand evidence | 65,000,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 52,000,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 39,000,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 26,000,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 16,250,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 9,750,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 6,500,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 3,250,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 1,300,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 650,000 | 0.00% (0.0% to 0.00%) | buyers | Physical machine labour (robots) | no | 65,000 | 0.00% (0.0% to 0.01%) | buyers | Physical machine labour (robots) | no | 100 | 0.00% (0.0% to 0.06%) | buyers | Physical machine labour (robots) | yes | The research agent's comparison with published estimates # moon_travel_100: comparison with published estimates **Machine (world, 2035, $100 a trip against $65M for an orbital seat today):** a gain of $0.96B as written and $2B as the median of the draws (80% range $0B to $94B), with 6.93% of the market served. Spending on space trips is about $0.82B: $0.09B on 0.92M trips at $100 and $0.73B on 11 seats at $65M. The gain is mostly what buyers would have paid above $100, not revenue; with everyone served it is $13.8B. **No published estimate covers trips at anything near $100. Every figure below was read only in search snippets (full texts would not open): each is strength 3 at best and unsaved.** | Estimate (strongest first) | Their number | Same scale as the machine | Ratio | |---|---|---|---| | Stated-preference surveys (Collins et al.; Abitzsch; set the entry's elasticity range) | 150,000 trips a year at $22,400; 20M at $2,240 (2026 int$) | the machine's curve gives 48,000 and 524,000 | theirs 3x and 38x | | WEF and McKinsey 2024; PwC 2021 (new) | space economy $1.8T in 2035; lunar economy $170B over 2020-2040 | trips only | scope | | UBS 2019 | space tourism $3B a year by 2030; rocket travel on Earth $20B | spending $0.82B | 3.7x; a channel | | Futron 2002 (checkable) | over $1B a year by 2021: 15,000 suborbital and 60 orbital passengers | actual about 20 and 5 a year | 100-1,000x too high | | Bottom-up count 2026 (new) | orbital tourism under $0.5B a year | on course: 12 seats, $0.78B | within 2x | | Future Market Insights | space tourism $5.1B in 2035 | $0.82B | 6x | **Why they differ** 1. *Price and measure.* The forecasts are revenue at today's prices ($0.45M-65M a seat), not a gain at $100. 2. *Scope.* UBS and FMI include suborbital hops, outside the machine's base of orbital seats; WEF and PwC cover satellites and cargo. 3. *Forecast record.* Futron was 100-1,000x too high on passengers. The bottom-up count agrees with the machine's anchor, which rests on seats actually sold. 4. *Surveys* record what people say, which runs high. If they are right, demand is more elastic than -1.04. The entry's -1.56 end gives the $94B top of the range. 5. *A missing channel.* A $100 trip implies about $0.3 a kg to the Moon. Satellites, travel on Earth and space industry would become cheap too, and UBS's $20B and WEF's $1.8T suggest that could dwarf the trips (separate capabilities). **Which I trust.** For spending at today's prices, the machine: it rests on seats actually sold, matches the bottom-up count, and forecasts have overstated this market before. For $100 trips I would not trust the central $1-2B within 10x. Nothing published exists at that price, the machine stretches an air-travel elasticity across six orders of magnitude, and $100 is below the energy a trip must use at today's prices. The 80% range is the honest answer. Sources Source | Strength | Saved copy | InterVISTAS Consulting for IATA (2007), Estimating Air Travel Demand Elasticities, Figure (https://www.iata.org/en/iata-repository/publications/economic-reports/estimating-air-travel-demand-elasticities---by-intervistas) | 3 | yes | UN World Population Prospects 2024, population by five-year age group, medium variant: Wor (https://population.un.org/wpp/assets/Excel%20Files/1_Indicator%20(Standard)/CSV_FILES/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) | 1 | yes | Our World in Data, electric car sales (IEA Global EV Outlook data): World rows; copy of so (https://ourworldindata.org/grapher/electric-car-sales.csv?v=1&csvType=full&useColumnShortNames=true) | 1 | yes | IEA, World Energy Outlook 2025 (electric car share of the car market); saved copy from sta (https://iea.blob.core.windows.net/assets/0a7a40a4-5dcb-4d6e-a7ad-76a1c90ec8eb/WorldEnergyOutlook2025.pdf) | 1 | yes | IRENA, Renewable Power Generation Costs in 2024 (summary); saved copy from stage1-v2/agent (https://www.irena.org/-/media/Files/IRENA/Agency/Publication/2025/Jul/IRENA_TEC_RPGC_in_2024_Summary_2025.pdf) | 1 | yes | World Bank Commodity Price Data (Pink Sheet), annual nominal prices, natural gas columns 2 (https://thedocs.worldbank.org/en/doc/5d903e848db1d1b83e0ec8f744e55570-0350012021/related/CMO-Historical-Data-Annual.xlsx) | 1 | yes | WIOD Socio Economic Accounts (November 2016 release), air transport (H51) value added, gro (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | WIOD Socio Economic Accounts (November 2016 release), air transport (H51), 2014; same extr (https://dataverse.nl/api/access/datafile/199095) | 1 | yes | FRED series CPIAUCSL (US consumer price index, all urban consumers, monthly); saved copy o (https://fred.stlouisfed.org/graph/fredgraph.csv?id=CPIAUCSL) | 1 | yes | Gillen, Morrison and Stewart (2003), Air Travel Demand Elasticities: Concepts, Issues and (https://www.fin.gc.ca/consultresp/Airtravel/airtravStdy_1e.html) | 1 | search only | The Wire (2025), on Axiom Mission 4 seat prices; search snippet only (https://thewire.in/space/know-your-spacemen-is-shubhanshu-shuklas-axiom-4-different-from-rakesh-sharmas-in-1984) | 3 | search only | Space.com (2018), Axiom's first private trip to the ISS; search snippet only (https://space.com/40893-axiom-private-space-station-trip-55-million.html) | 3 | search only | Spaceflight Now, Space Adventures' circumlunar Soyuz mission; search snippet only (https://spaceflightnow.com/news/n1406/15lunarsoyuz/) | 3 | search only | SpacePolicyOnline, Space Tourism Hitting Its Stride (count of Axiom private astronaut miss (https://spacepolicyonline.com/news/space-tourism-hitting-its-stride/) | 3 | search only | Space.com, The First Space Tourists (Space Adventures' Soyuz clients 2001-2009); search sn (https://www.space.com/11479-photos-space-tourists-pioneers-spaceflights.html) | 3 | search only | Collins et al. space tourism market surveys (Japan, US, 1993-1996) and Abitzsch's global d (https://spacefuture.com/archive/researching_the_space_tourism_market.shtml) | 3 | search only | IAATO, Report of the International Association of Antarctica Tour Operators 2023-24 (ATCM4 (https://iaato.org/download/report-of-the-international-association-of-antarctica-tour-operators-2023-24-atcm46_ip101_e_) | 1 | search only | YouGov (US), poll on visiting the Moon; search snippet only (https://yougov.com/en-us/articles/54648-americans-favorite-planet-other-than-earth-its-mars) | 3 | search only | Axios-SurveyMonkey poll (2022), Majority of Americans don't want to travel to the Moon; se (https://www.axios.com/2022/01/04/american-moon-travel-poll) | 3 | search only | Planetary data table citing the NASA Planetary Fact Sheet (escape velocities of Earth and (https://www.ajdesigner.com/reference/planetary-bodies/) | 1 | search only | Wikipedia, Space elevator economics (energy per kg lifted, with climber and power-beaming (https://en.wikipedia.org/wiki/Space_elevator_economics) | 3 | search only | Wikipedia, Starship HLS (mission profile: tanker flights per lunar landing); search snippe (https://en.wikipedia.org/wiki/Starship_HLS) | 3 | search only | SpaceX, Starship vehicle page (Super Heavy propellant capacity; the ship's is listed as 1, (https://www.spacex.com/vehicles/starship/) | 3 | search only | Jones (2018), The Recent Large Reduction in Space Launch Cost, ICES 2018 (NASA Ames); sear (https://ntrs.nasa.gov/citations/20200001093) | 2 | search only | Rodrigue, The Geography of Transport Systems, Air Transportation Growth and Economic Growt (https://transportgeography.org/contents/chapter5/air-transport/air-transport-economic-growth/) | 3 | search only | CNBC (2019), UBS on space travel and space tourism; search snippet only (https://www.cnbc.com/2019/03/18/ubs-space-travel-and-space-tourism-a-23-billion-business-in-a-decade.html) | 3 | search only | Globetrender (2019), Space tourism could generate US$3 billion a year by 2030 (UBS, long-d (https://globetrender.com/2019/03/31/space-tourism-economy-2030/) | 3 | search only | Future Market Insights, space tourism market forecast to 2035; search snippet only (https://www.fmiblog.com/?p=489248) | 3 | search only | Futron Corporation (2002), Space Tourism Market Study: orbital space travel and destinatio (https://www.americaspace.com/wp-content/uploads/space_docs/Space_Tourism_Market_Study_Futron_2002.pdf) | 3 | search only | World Economic Forum and McKinsey (2024), Space: The $1.8 Trillion Opportunity for Global (https://www.weforum.org/media/space-economy-set-to-triple-to-1-8-trillion-by-2035-new-research-reveals/) | 3 | search only | Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) - results/sensitivity.csv (https://world.abundancemachines.si/data/v7/results/sensitivity.csv) - results/runs.csv (https://world.abundancemachines.si/data/v7/results/runs.csv) - capabilities/moon_travel_100.yaml (https://world.abundancemachines.si/data/v7/capabilities/moon_travel_100.yaml) Pitch an idea https://world.abundancemachines.si/guide/pitch.html A pitch is a few sentences. An AI researches it into an entry; plain code does the arithmetic, so the same entry always gives the same result. Full: give an AI agent with web search the research instructions below and your pitch. It restates the pitch with a price and unit, researches every number with its source, writes the entry using only the model's IDs, and compares the machine's result with published estimates. Quick: give any AI the short instructions. Its numbers are marked [A] and the page shows them as rough, with the measured error band of quick entries. Research instructions (full path)# Research agent instructions: turn a pitch into a capability entry You are a research agent with web search. Someone has pitched an idea: a product, a discovery, a service or a rule change. Your job is to turn it into one capability entry (a YAML file) that the economic machine can run. You do the thinking and the research; plain code does the arithmetic. You never compute the economic result yourself, and you never type a dollar gain: you only describe what the idea changes in the model, with sources. The machine asks: if this capability existed at a given price by 2035, how much of the gap between where the world economy is heading ($290T on course in 2035) and twice today's output ($448.5T) would it fill, which input would run short next, and how far can that answer be trusted? It values capabilities as if they existed. It does not claim they can be built; that is checked later. Read these first (paths from the repository root): - `stage1-v7/pitch/model_ids.md`: every layer and input ID you may use, with its 2026, on-course 2035 and record-pace 2035 numbers and units, the labour model, and what one unit of an input earns. - `stage1-v7/capabilities/_template.yaml`: the entry format, field by field. - `stage1-v7/README.md`: how an entry is validated and run. - The five worked examples at the end of this file (once written). ## The five steps 1. **Restate the pitch** as one sentence with a price and its unit, for example "general-purpose robots that do any physical task a person can, at $5 per hour of work, sold from 2028". If the pitch has no price, no unit or no date and you cannot infer one from the pitch itself, ask the user for it instead of guessing. (In a batch run with no user, use the starter's own wording and mark the price [A].) 2. **Search** reports, studies and data for every field of the entry: - how much more people buy as the price falls (the price elasticity of demand), and over what price range the evidence covers; - comparable past cases (a product that fell in price, a rule that was changed) and what happened; - what the capability needs (energy, materials, workers, capital, land per unit); - how fast it could spread (adoption curves of similar products); - published estimates of its economic effect, with their scale (world or one country, years). Prefer, in this order: after-the-fact studies and official statistics (strength 1); peer-reviewed forecasts or models (strength 2); consultancy, press and company claims (strength 3, recorded but never the source of an effect size). 3. **Write the entry** using only the model's IDs. Every number has a value, unit, label, sources and, for an estimate, how it was made. Every source has its URL, access date, the exact sentence or table cell, a saved text copy and its strength. A number you cannot source is [A], and you say why you chose it. 4. **Add knock-on effects** the evidence points to, each as a model change with its mechanism and source (for example: a cure adds healthy working years, so the human workforce K18 rises by a stated number of workers). Unsourced knock-ons are allowed but are [A]: the machine shows them beside the result as "possible extra" and never adds them. 5. **List what you could not map** to a model number (`not_mapped`), in plain words. Refuse a pitch that breaks physics (perpetual motion, faster-than-light travel, more energy out than in, a price below the energy it must use at any plausible energy price is not a physics break but must be flagged in `performance`). Set `refused: true` and say which law it breaks and why. ## Labels and sources (the rules the validator enforces) - **[S] sourced**: you read the number in a saved copy of the source and the exact quote is in that copy. - **[E] estimated**: computed from sourced numbers; write the arithmetic in `derivation`. - **[A] assumed**: anything else. A number you only saw in a search-result snippet is [A]. A number from a strength-3 source used as the size of an effect is [A] (you may still record it, with its source). - **Saved copies.** Save a text copy of every page you take a number from in `stage1-v7/sources/.txt` and put its SHA-256 checksum (`sha256sum`) in the entry. Ways to get one, in order: 1. A copy already in the repository: many sources were saved by earlier stages under `stage1-v1/`, `stage1-v2/` and `stage1-v3/` (look for folders named `raw` with a `url.txt`; text copies are `.txt`, `page.html` or extracted PDF text). Copy the text file into `stage1-v7/sources/` and record the original path in `title`. 2. The fetch tool (WebFetch), asked to return the page's full text verbatim. Save what it returns. If it saves a PDF for you, extract its text with `pdftotext` and save that. 3. If neither works (in this environment the fetch tool may be unable to reach hosts, and downloading with curl, wget or scripts is not permitted), leave `saved_copy` empty. The number is then [A] until `code/fetch_sources.py` saves the page and `code/validate.py` finds the quote in it. Do not try to get round a blocked download. - The validator reopens every saved copy and looks for your quote (ignoring spaces, case and punctuation). A number whose quote is not found is downgraded to [A] with a warning. So quote exactly. - **Strength** of each source: 1 after-the-fact study (peer-reviewed) or official statistics; 2 peer-reviewed forecast or model; 3 consultancy, press or company claim. - Money: 2026 international dollars (PPP). Convert past prices with the US consumer price index (FRED CPIAUCSL is in `stage1-v2/agent6_cheap_inputs/raw/fred_CPIAUCSL`). For goods traded worldwide, market US dollars are used as international dollars ([E], say so); for local services (wages, care) convert with a PPP factor and say which. ## Demand mechanisms (path a: what people buy) Each mechanism is a demand curve for one good: a layer's product, an input, or a new product. `Q(p) = min(limit, Q0 x (p / P0) ^ elasticity)`, where Q0 is the units bought on course in 2035 at the old price P0. - **P0** is the old price. For a new product with no old price, P0 is the **next-best option's price** (what buyers use instead today), in the same unit as the capability's price. - **P1** is the capability's price (`use: price`). The runs sweep it from P0 down to near zero. - **Q0** comes from the model where you can (`model: "oc:"` is the layer's on-course 2035 output in bn, times a sourced `factor` converting it into units; `model: "O:"` is an input's on-course 2035 supply), otherwise a sourced number of units. - **elasticity** is the price elasticity of demand (negative), with `evidence_price_range`: the lowest and highest price the evidence covers, in the price unit. Outside that range the machine keeps the elasticity but stops at the `limit` and marks the result as beyond the evidence; the limit is a physical bound (number of people, hours in a day, physical need) and is usually [A]. - **mode**, the part that most often goes wrong: - `cost`: the capability makes each unit with fewer resources than the next-best (a cheaper recipe, a cheap cure that replaces an expensive treatment, cheaper electricity from cheaper plants). Gain = the saving on units bought anyway plus the extra units bought, valued at the average of the old and new price net of their cost. - `supply_net`: the capability adds units of an input that cost resources to make (robots, AI agents, more grid capacity). The units already supplied are not cheaper to make, so their lower price is a transfer, not a gain; the gain is what the extra units are worth (the average of the old and new price) minus their own cost P1. Give `capacity_2035`: how many units can exist by 2035, from production ramps of similar products. - `supply_gross`: units of an input that use nothing the economy would otherwise use (cured people back at work). Gain = what the extra units are worth. - Spread (`available_year`, `years_10_to_90`, `max_share`) sets the share of the market that has the capability in 2035, from adoption curves of comparable products (with sources). ## Model changes (path b: what every input allows) The machine raises every layer from today toward its 2035 target in equal steps and stops where the first input's need passes its record-pace supply. Your changes alter that, only through these kinds: - `recipe`: input per unit of a layer's output, as a multiplier. `input: LAB` is the labour model's work per unit (it moves robots K04, AI agents K03, AI compute K05, licensing K16 and machine electricity together). Scaled by the 2035 spread unless `scale_with: none`. - `supply`: units added to an input's 2035 supply (`add`, in the input's own unit), or extra growth a year (`growth_add`), or `from_demand: ` to add exactly the extra units a supply mechanism buys (use this for robots and AI agents, so paths a and b agree). - `cap`: a supply limit removed (for example K16 licensing for machine work). - `task_split`: the share of cognitive tasks AI agents take first (0 is v4's base split; 1 is v4's scenario S1, where people move to physical work). - `own_output`: a new product's output added to its layer (the machine computes it from the demand mechanism), with its own input needs per unit (for example propellant per Moon trip, as fuels K02). Rules: - An effect is never a dollar amount. If you find "adds $2 trillion to GDP", it goes in `published_estimates`. - Do not count one mechanism twice: one entry may not change the same model number by the same mechanism twice (for example both a `recipe` cut in labour for C13 and a `supply` of construction workers K17 for the same saving). A supply mechanism for robots plus `supply from_demand` on K04 is one mechanism carried to both paths, which is correct. - Work on K11-K15 (not inputs) must be expressed as a change to a real model number (see model_ids.md). - Use the layer the spending is in: a cancer cure is C05, a Moon trip is C06 or C08, office work is spread over the layers that employ office workers (use the labour model: `task_split`, `supply` of K03). - Do not make the result larger than the layers it touches: the validator rejects it. ## Rules that keep two runs alike (added after the consistency check) Two agents given the same pitch must write entries that give the same answer within 2x. The first consistency check (`pitch/consistency.csv`) found five of the ten starters 2x to 66x apart, almost all from numbers marked [A]: guessed elasticities, guessed spreads, demand curves stretched far below any evidence, and different framings of the same pitch. These rules fix how such numbers are chosen. They do not make the numbers better sourced; they make an unsourced number the same in every run, and its range then carries the uncertainty. Where a rule gives a default, label the number [A], write "research.md default" in its `derivation`, and give the stated alternatives. A sourced number always beats a default. 1. **Price unit.** Quote the price in the unit buyers pay for the next-best option today: an hour of work, a trip, a MWh, a treatment, a permit. If the next-best is quoted per year, convert to that unit and say how. 2. **Elasticity**, in this order: (a) one measured for this good or service in a study that covers part of the price sweep ([S] or [E]); (b) one measured for the closest substitute (say which and why); (c) otherwise the default: **-0.5** for things firms buy (energy, materials, equipment, hours of work by people or machines), **-1.0** for goods and services households buy; alternatives at half and twice the default. Do not choose any other unsourced value. 3. **Far below the evidence.** If the capability's price is more than 10 times below the lowest price the elasticity evidence covers (typical for a new product many times cheaper than today's option), do not stretch the curve. Give a second anchor: the units bought a year, in 2035, of the closest thing that is sold today at about the capability's price (for a $100 Moon trip: long-distance leisure trips at that price). Set the `limit` to that number and the elasticity from the two anchors, `ln(Q1 / Q0) / ln(P1 / P0)`, labelled [E] if both anchors are sourced and [A] otherwise, with the arithmetic in `derivation`. 4. **Spread.** `years_10_to_90` comes from the measured adoption curve of the closest past product (with its source). If you find none, use the default for its class: software and services sold online **8** years; consumer devices **12**; medicines once approved **10**; vehicles, machines and equipment firms buy **20**; buildings, energy supply and grids **25**; a rule change **5** years from the rule. `max_share` is 1.0 unless a source shows that part of the market cannot use it. `available_year` is the pitch's year; if it gives none, 2028 for something that exists as a working prototype today and 2030 otherwise. 5. **More of a physical thing in short supply** (more factories, more equipment, more machines). The good is the thing in short supply, in its own unit; the mode is `supply_net`; P0 is today's price of that thing; P1 its price once the shortage ends; `capacity_2035` comes from the ramp of factories in a comparable past build-out. The cost of waiting is a second, `cost` mechanism on a new good only where a source measures that cost, with elasticity 0 (it adds no units of its own). 6. **The capability's own needs.** Enter what its units need to make and run (energy, materials, capital) only where a source gives the need per unit: for a new product, as `needs` on its `own_output` change; for extra units of an input (robots, AI agents, grid equipment), as a negative `supply` add on the input they use up, with the per-unit need and the number of units in `derivation`. Needs you cannot source go in `not_mapped`. 7. **Faster rules** (approvals, permits, connections, licences). The good is the thing whose making gets cheaper (an approved medicine, a building, a connected power plant), in its own unit or per dollar of it; the mode is `cost`; the price is its full cost per unit including the cost of waiting (capital tied up x what capital earns x the time), so P0 uses today's wait and P1 the shorter one. Do not price the wait alone as a separate product. ## Output - `stage1-v7/capabilities/.yaml` (or the folder you are told), following `_template.yaml`. - `stage1-v7/sources/.txt` for every saved copy, and `stage1-v7/sources/pending.csv` rows (`source_id,url,why`) for pages you could not save. - `stage1-v7/pitch/logs/.md`: your research log: searches made, what each found, choices made and why, what you could not map. Write it early and update it as you go. - Run `python3 -B -I stage1-v7/code/validate.py stage1-v7/capabilities/.yaml` and fix every error before you finish. ## After the run: compare with published estimates When the machine has run your entry, you will be shown its result (gap filled, dollars, what limits it, the input that binds next). Then write, in the entry's log and in `stage1-v7/pitch/comparisons/.md`: - each published estimate you found, strongest sources first, put on the same scale as the result where possible (same year, world or the study's own scale, the same price); - where the machine and an estimate differ by more than 2x: why (different price, spread, scope, a bottleneck the estimate ignores, double counting in the estimate, a channel the machine does not have); - which you trust more and why. ## Worked examples Five starters, as their research agents wrote them (the full entries are in `stage1-v7/capabilities/`). Each shows the pitch, the main sources, the core of the entry (its demand mechanisms and model changes) and the agent's comparison with published estimates after the machine ran it. They show the three modes (cost, supply_net and a new product), a rule change written as real model numbers, and a price flagged as below its energy cost. They were written before the section "Rules that keep two runs alike" was added: where an example differs from those rules, follow the rules. ### Example: Much faster building permits and grid connections **Pitch.** "Much faster building permits and grid connections (unblocked)" **Restated.** A permitting and grid-connection process that grants building permits in about 1 month and grid connections (and other major infrastructure approvals) in about 12 months, adopted by governments from 2027, so the cost of waiting falls from about 6.8 to about 1.6 cents per dollar of construction (2026 int$ of waiting cost per $ of construction, C13). **Main sources** (strength; saved copy or search only): - LBNL, Queued Up: 2026 Edition (Rand et al., June 2026); saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_queued_up_2026/q.txt (strength 1; saved) - IEA, World Energy Outlook 2025; saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt (strength 1; saved) **Entry (core):** ```yaml price: value: 0.015761 unit: 2026 int$ of waiting cost per $ of construction (C13) label: A sources: - lbnl_small12 - soltas_sf derivation: 'Batch run, no user to ask: the price is assumed. Wait with the capability T1 = 0.9 x 1 month (building permits) + 0.1 x 12 months (grid connections and other...' next_best: name: 'Today''s permitting and grid-connection process: about 9 months of waiting averaged over world construction (about 5 months for building permits, about 45 months for grid connections and other major infrastructure approvals)' price: value: 0.067548 unit: 2026 int$ of waiting cost per $ of construction (C13) label: A sources: - lbnl_ia45 - db_us2020 - db2012_world - soltas_sf - iea_invest derivation: T0 = (1 - s_inf) x T_build + s_inf x T_infra = 0.9 x 5 + 0.1 x 45 = 9.0 months (derivation_inputs), times m_month = 0.0075053 = 0.067548. A, because T_build ... demand: - id: d1 good: new:permit_wait layer: C13 mode: cost quantity_unit: $ of construction (C13) a year, at today's construction prices P0: use: next_best P1: use: price Q0: model: oc:C13 factor: value: 1000000000.0 unit: $ of construction per bn of C13 output label: E sources: [] derivation: 'unit conversion: 1 bn = 1e9 $' elasticity: value: -0.0348 unit: '% change in construction bought per 1% change in the waiting cost' label: A sources: - albouy_ts derivation: Buyers respond to the full price of a structure, 1 + c (construction cost plus waiting cost). The elasticity with respect to the waiting cost c is the price ... evidence_price_range: - 0.0 - 0.067548 limit: value: 104600000000000.0 unit: $ of construction (C13) a year label: E sources: [] derivation: 'stage1-v5/not_inputs.csv: K12 record-pace supply 104,600 bn of C13 output (the layer''s own record output) x 1e9.' description: 'Construction cannot exceed the C13 layer''s record-pace output (stage1-v5). The evidence covers the whole sweep: removing the waiting cost lowers the full pri...' changes: - id: ch1 kind: supply input: K01 add: value: 3042 unit: TWh per year (gross generation) label: E sources: - iea_heldup - irena_solar - irena_wind - irena_adds derivation: 'The held-up projects connected: 1,700 GW (IEA, S) x 0.2043 (average capacity factor = 0.7982 x 0.17 + 0.2018 x 0.34, IRENA 2024 solar and onshore wind, mix o...' scale_with: adoption mechanism: 'Faster grid connections let generation that is built but waiting (or ready to build) feed the grid, so electricity supply K01 rises. Path (b) only: these units cost resources to make, so at today''s price they add nothing to path (a) (as research.md''s supply_net rule); stage1-v5 finds electricity does not bind before the target, so this change does not move the result on its own.' ``` **Comparison with published estimates** (after the run): #### permits_grid_fast: comparison with published estimates **Machine (world, 2035, waiting cost 1.6 instead of 6.8 cents per $ of construction):** median across draws $291B a year, 0.10% of world GDP, 0.01 growth points (80% range $0-1.8T). As written: $527B (0.18%). **What it is made of:** the waiting saving on the 14.3% of construction reformed by 2035, about half from building permits (5 to 1 month) and half from grid and major-infrastructure approvals (45 to 12 months). At full uptake (90%) it would be $3.2T (1.1%): infrastructure $1.55T (0.54%), power projects alone about $0.8T. **Sources:** all figures are from search snippets only: unsaved, strength 3 at best. | Estimate (strongest first) | Their figure | Machine's same measure | Machine / it | |---|---|---|---| | CEA, Oct 2026 | US long-run GDP +0.28-0.56% if reviews fall from 4.2 to 2 years; +0.41-0.83% at 1 year | infrastructure part: 0.54% at full uptake; ~0.085% in 2035 | 0.65-1.3x; 0.1-0.2x in 2035 | | Hsieh-Moretti 2019 | US GDP +3.7% (2009) from looser land-use rules in three metros | 1.1% at full uptake; 0.18% in 2035 | 0.3x; 0.05x | | RFF, Power Delayed | US net cost of power-project delays $47bn (scenario total) | power part ~$0.8T a year (world, full uptake); a US tenth ~$80bn | >1.7x (theirs is a total) | | C2ES-cited study (new) | US transmission reform: $125bn of grid costs saved 2026-2040 (~$8bn a year) | as above | \u226510x | | Grid Strategies and Brattle (new) | fixing interconnection: ~$100bn of benefits; PJM delay costs up to $7bn in a year | as above | ~11x (PJM, yearly) | | McKinsey | $1.7-2.4T of cumulative US GDP forgone in federal permitting | a stock with no period: not convertible | - | ##### Gaps over 2x - **CEA in 2035:** spread. The CEA is long-run full adoption; the machine reaches 14% of construction by 2035 (12 years from 10% to 90% [A]). At full uptake its infrastructure part is inside the CEA's range for a similar wait cut (38 months against 33). - **Hsieh-Moretti:** a channel the machine lacks: how much may be built where workers are most productive (zoning), not how fast. The model has no geography. - **Grid studies (machine 2-10x or more higher):** a different measure, and likely a machine overstatement. - The studies count electricity-system costs, US or regional, often cumulative. - The machine charges the return on the whole project's value for each month of waiting, though before construction only land, design and finance are tied up (red team RT16), so its grid part is probably too high. - Its extra electricity is not valued (power does not bind). ##### Which I trust more **Major infrastructure:** both, since the CEA and the machine agree for a similar wait cut. **Grid connections:** the electricity-system studies; no study backs the machine's waiting cost for pre-construction queues. **Building permits (half the machine's gain):** no published GDP estimate exists; the machine rests on the practitioner rule of about 1% of cost a month (strength 3). **The 2035 number:** low trust (7 of 10 key numbers assumed); most of its uncertainty is how fast governments adopt the reform, which no estimate addresses. ### Example: AI agents doing most office work **Pitch.** "AI agents doing most office work (new)" **Restated.** AI agents that can do four-fifths of office (cognitive, ISCO 1-4) tasks at the quality of a trained worker, sold from 2028 at $5,000 per worker-year of office work (about $2.35 an hour), against $63,247 a year (about $29.70 an hour) for a human office worker in 2035. **Main sources** (strength; saved copy or search only): - stage1-v7/input_prices.csv, row WAGE_COG (model file built from ILO earnings and employment by occupation, stage1-v2/agent6_cheap_inputs/raw/ilo_ear_ocu and ilo_emp_eco_ocu, and PWT 11.0) (strength 1; saved) - Epoch AI, Data on AI chip sales, timelines_by_chip.csv (copy of stage1-v2/v1/agent4_bottlenecks/raw/epoch_chip_sales/timelines_by_chip.csv) (strength 3; saved) - METR, METR-Horizon-v1.1 benchmark results (copy of stage1-v2/v1/agent1_frontier/raw/metr_th11/benchmark_results_1_1.yaml) (strength 3; saved) - Electric car sales (IEA Global EV Outlook via Our World in Data) (copy of stage1-v2/v1/agent4_bottlenecks/raw/owid_ev_sales/electric-car-sales.csv) (strength 1; saved) - IEA, World Energy Outlook 2025, chapter 1 (copy of stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt) (strength 2; saved) - UN World Population Prospects 2024, population by five-year age group, medium variant: World, 2035 rows (extract of stage1-v2/baseline/raw/un_wpp2024_age5/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) (strength 2; saved) **Entry (core):** ```yaml price: value: 5000 unit: 2026 int$ per worker-year of office (cognitive) work label: A sources: - epoch_chip_sales - dc_cost derivation: 'Chosen [A] (batch run, no user to ask). About 1.7x the hardware-and-power cost of one AI worker-equivalent with the model''s own ratios: 272.36 W of AI chips ...' next_best: name: 'A human office worker (ISCO 1-4 occupations): pay per worker-year of cognitive work, on course in 2035' price: value: 63246.58 unit: 2026 int$ per worker-year of office (cognitive) work label: E sources: - m_prices derivation: 'price:WAGE_COG in stage1-v7/input_prices.csv: on-course 2035 pay per worker (labour share 0.5338 of on-course output / on-course workers) split between cogni...' demand: - id: d1 good: K03 layer: ALL mode: supply_net quantity_unit: worker-years of office (cognitive) work a year P0: use: price:WAGE_COG P1: use: price Q0: value: 998805096 unit: worker-years of office (cognitive) work a year label: E sources: [] derivation: 'All cognitive work bought on course in 2035, by people and machines: the labour model''s work per bn of output (w) x each layer''s cognitive share x on-course ...' elasticity: value: -1.278 unit: '% change in units per 1% change in price' label: A sources: - katz_murphy - card2009 - nordhaus2021 evidence_price_range: - 44272.6 - 82220.6 derivation: With cognitive work combined with all other inputs at an elasticity of substitution sigma and other inputs held, the price elasticity of demand for cognitive... elasticity_alternatives: - value: -0.639 unit: '% change in units per 1% change in price' label: A sources: - nordhaus2021 derivation: 'sigma = 0.5 (cognitive work a complement of physical inputs): -0.5 / (1 - 0.2177).' - value: -2.556 unit: '% change in units per 1% change in price' label: A sources: - card2009 derivation: 'sigma = 2 (Card''s college versus high-school elasticity): -2 / (1 - 0.2177).' limit: value: 8885210184 unit: worker-years of office (cognitive) work a year label: A sources: - un_wpp description: 'Physical bound beyond the evidence: at most one full-time AI office worker for every person alive in 2035 (8,885 million people, UN WPP 2024 medium variant, ...' derivation: 'Sum of the 21 world age groups for 2035 in the saved UN WPP 2024 extract: 8,885,210 thousand people. The rule (one per person) is assumed.' capacity_2035: value: 3513800000 unit: worker-years of office (cognitive) work a year, beyond the on-course supply of K03 label: A sources: - epoch_chip_sales - owid_ev_sales - iea_weo25 derivation: 'AI chip power sold in the four complete quarters Q3-2025 to Q2-2026 (Epoch, saved copy): 1,979.0 + 2,349.2 + 2,669.7 + 3,221.7 = 10,219.6 MW (Q3-2026 is mark...' changes: - id: ch1 kind: supply input: K03 from_demand: d1 units_per_model_unit: value: 1000000 unit: worker-years per million worker-equivalents label: E sources: [] derivation: 'Unit conversion: K03 is counted in million worker-equivalents.' scale_with: none mechanism: The extra AI agents bought in path (a) are added to the supply of machine cognition (K03), on course and at the record pace, so paths (a) and (b) count the same agents (one mechanism carried to both paths). - id: ch2 kind: task_split share: value: 0.8 unit: share of cognitive tasks AI agents take first label: A sources: - eloundou2024 derivation: The pitch says most office work; read as four-fifths of office tasks where the agents are adopted. Eloundou et al. (search snippet) find that with LLM-powere... scale_with: adoption mechanism: Where firms adopt the agents, the agents take office tasks first and the people they free move to physical work, which lowers the need for robots (K04) on the path; the labour model adds the agents' own AI compute (K05) and electricity (K01) needs. ``` **Comparison with published estimates** (after the run): #### ai_office_agents: comparison with published estimates **Machine (world, 2035, $5,000 against $63,247 per worker-year):** median across draws $10.9T a year, which is 3.8% of on-course world GDP ($290.2T) and 0.44 growth points a year (80% range $0-37.1T). With the entry as written it is $39.7T (13.7%). **Scaling:** I apply each percentage to 2035 world GDP, compound growth rates over 2026-2035, and take GDP as TFP / 2/3. Only the IMF figure is saved. The rest come from snippets only: unsaved, strength 3 at best. | Estimate | Their figure | Machine's scale | Machine median / it | |---|---|---|---| | IMF WEO 2026 (saved) | TFP +0.8% in 10 yrs; upside +0.1-0.8 pt/yr | $3.5T; upside $2.6-21.5T | 3.1x | | Acemoglu 2025 | US GDP ~1% in 10 yrs | $3.2T | 3.4x | | OECD 2024 | US labour productivity +0.4-0.9 pt/yr | $10.6-24.4T | 0.45-1.0x | | PWBM 2025 | US GDP +1.5% by 2035 | $4.4T | 2.5x | | Humlum-Vestergaard 2025 (after the fact) | chatbots: 3% time saved, no earnings effect | - | - | | IMF SDN 2024; ILO 2025 | 40% / 25% of jobs exposed | machine automates ~6% of all work | - | | PwC 2025 (new) | world +15% by 2035; 8% low-trust; 1% pessimistic | $43.5T / $23.2T / $2.9T | 0.25x / 0.47x / 3.8x | | Goldman 2023 | world +7% in 10 yrs | $20.3T | 0.54x | | Oxford Economics (new) | +0.6 pt/yr world growth (2030s) | - | 0.7x | | Aghion-Bunel 2024 | +0.8-1.3 pt/yr | $21-36T | 0.3-0.5x | | McKinsey 2023 | +0.1-0.6 pt/yr | $2.6-16T | 0.7-4x | | RAND 2025 (new) | agents add 2.6-3.8 pt/yr, to 2045 | - | ~0.15x | | Epoch GATE 2025 | 12%/yr growth at 40% of tasks automated | - | - | ##### Gaps over 2x **IMF, Acemoglu, PWBM:** machine median 2.5-3.4x higher; as written 9-12x. - **Price and capability.** These studies value today's AI, profitable on few tasks. The entry has agents doing 80% of office tasks at 8% of the wage from 2028. - **A channel they lack.** They count savings on existing work. The machine lets buyers more than triple the office work bought (999 to 3,276 million worker-years). Its elasticity is measured at 0.7-1.3 times the wage but used 9x below that range, and the only stop is the assumed one-agent-per-person limit. All $39.7T comes from those extra units. - **Spread.** The machine's 80% range reaches $0, like the Danish finding and PwC's pessimistic case. - **Bottleneck.** No estimate limits chips or power. The machine's chip sales grow 50% a year, beyond the IEA outlook, but its demand limit binds first. **RAND, GATE:** 7x or more above the machine. - They automate R&D and reinvest in compute, a channel the machine lacks. - They also assume most tasks are automated. ##### Which I trust more **For the likely 2035 effect:** IMF, Acemoglu and OECD. They rest on measured exposure and savings, as does the one after-the-fact study (small effects). The machine rests on 8 of 10 assumed key numbers and an extrapolated elasticity; its trust is low. **If the pitch's capability arrives:** the machine's median sits mid-range among the forward-looking estimates (OECD, Goldman, PwC's middle case, Oxford Economics). The as-written 13.7% is an upper bound that only PwC's top case reaches. ### Example: Human-level general-purpose robots **Pitch.** "Human-level general-purpose robots (new)" **Restated.** General-purpose robots that can do any physical task a person can, at human speed and reliability, sold as robot work at 5 int$ (2026, PPP) per hour of human-level physical work from 2028, against 14.04 int$ per hour for a human doing the same task; the number that can exist by 2035 is set by the fastest production ramp on record (China's electric cars, x1.69 a year). **Main sources** (strength; saved copy or search only): - IFR, World Robotics 2026 - Industrial Robots, Executive Summary. Copy of stage1-v2/agent4_bottlenecks/raw/ifr_wr2026_exec/e.txt (text of the PDF) (strength 1; saved) - IFR, World Robotics 2026 - Industrial Robots, Executive Summary (as s_ifr_inst): state of humanoids (strength 1; saved) - Electric car sales (IEA Global EV Outlook via Our World in Data). Copy of stage1-v2/v1/agent4_bottlenecks/raw/owid_ev_sales/electric-car-sales.csv (strength 1; saved) - Electric car sales (IEA via OWID), as s_owid_ev14: China 2023 (strength 1; saved) - Counterpoint Research, Global humanoid robot shipments soar nearly 300% YoY in H1 2026 (quote as recorded by stage1-v2 Agent 4, sources.csv S040; not saved) (strength 3; search only) - Morgan Stanley note (analysts led by Adam Jonas) as reported by Investing.com: 1 humanoid robot at $5/hour can do the work of 2 humans at $25/hour (search result only) (strength 3; search only) **Entry (core):** ```yaml price: value: 5.0 unit: 2026 int$ per hour of human-level physical work label: A sources: - s_ms_5h - s_optimus derivation: Batch run, no user to ask, so [A]. 5 int$ an hour is Morgan Stanley's figure for a humanoid's cost of work (strength 3, search result only) and the example p... next_best: name: A human worker doing the same physical task, at the model's world average pay per hour of physical work (ISCO 5-9), on course in 2035 price: value: 14.04 unit: 2026 int$ per hour of human-level physical work label: E sources: [] derivation: 'price:WAGE_PHYS 29,876.9 int$ per worker-year / price:HOURS 2,128 hours per worker-year = 14.040 (input_prices.csv: labour share of world output from PWT 11....' demand: - id: d1 good: K04 layer: ALL mode: supply_net quantity_unit: hours of physical work a year (humans and robots together) P0: use: next_best P1: use: price Q0: value: 6416600000000.0 unit: hours of physical work a year (humans and robots together) label: E sources: [] derivation: ((1 - price:COG_SHARE 0.25867) x O:K18 4,023.24 + O:K04 32.773) million worker-equivalents x price:HOURS 2,128 hours = (2,982.56 + 32.77) x 2.128e9 = 6.4166e... elasticity: value: -0.3 unit: '% change in hours of physical work bought per 1% change in their price' label: A sources: - s_hamermesh - s_lichter evidence_price_range: - 11.23 - 14.04 derivation: 'The own-wage elasticity of aggregate labour demand: Hamermesh''s consensus constant-output value -0.30 (range -0.15 to -0.75); Lichter, Peichl and Siegloch''s ...' limit: value: 12403000000000.0 unit: hours of physical work a year (humans and robots together) label: A sources: - s_ilo_care_hours description: 'Physical bound beyond the evidence: all physical work done on course (Q0, 6.4166e12 hours) plus all unpaid care work done today (ILO: 16.4 billion hours a da...' capacity_2035: value: 28792000000.0 unit: hours of physical work a year (humans and robots together) label: A sources: - s_counterpoint - s_owid_ev14 - s_owid_ev23 - s_ms_5h derivation: 'Robots: humanoid shipments of 50,000 in 2026 (Counterpoint, strength 3, [A]) growing at China''s electric-car sales growth 2014-2023, (8,200,000 / 74,000)^(1/...' changes: - id: ch1 kind: supply input: K04 from_demand: d1 units_per_model_unit: value: 2128000000.0 unit: hours of physical work per million worker-equivalents label: E sources: [] derivation: price:HOURS 2,128 hours per worker-year x 1e6 scale_with: none mechanism: The extra robot work buyers take at the capability's price (capped by capacity_2035) is added to the robot fleet (K04) on course and at record pace, so paths (a) and (b) count the same robots. - id: ch2 kind: supply input: K08 add: value: -5.496 unit: kt magnet rare earth elements per year label: A sources: - s_fai_magnets - s_counterpoint - s_owid_ev14 - s_owid_ev23 derivation: 'Robots built in 2035: 0.05 x 1.6872^9 = 5.5405 million; magnet rare earths per robot: middle of 0.57-1.3 kg NdPr plus middle of 35-79 g Dy = 0.935 + 0.057 = ...' scale_with: none mechanism: The motors of the robots built in 2035 use magnet rare earths that other uses would otherwise have, so the rare earth supply left for the rest of the economy falls by that amount. - id: ch3 kind: supply input: K21 add: value: -0.3382 unit: tn 2026 int$ (PPP) of capital stock in 2035 label: A sources: - s_optimus - s_counterpoint - s_owid_ev14 - s_owid_ev23 derivation: 13.530 million robots in service in 2035 x 25,000 int$ each (middle of Tesla's 20,000-30,000 target at scale, strength 3; a traded good, so market dollars ar... scale_with: none mechanism: 'The robot fleet is capital: the capital stock left for the rest of the economy falls by the robots'' value.' ``` **Comparison with published estimates** (after the run): #### robots_general: comparison with published estimates **Machine (world, 2035, $5 against $14.04 an hour):** median across draws $182B a year, which is 0.063% of world GDP and 0.01 growth points (80% range $0-379B). As written it is $244B (0.084%). **What sets the size:** the fleet, 13.5 million robots in service in 2035 (5.5 million built that year). Stage1-v5's record pace already counts each robot as one worker, so only each robot's second worker-equivalent is added. Counted from zero, the same fleet would give about $0.5T (my rough scaling). **What is compared:** with no published 2035 output effect, I compare fleet, sales and value per robot. All figures are from snippets only: unsaved, strength 3 at best. The entry's first recorded estimate is a reserved study, left out. | Estimate | Their figure | Machine | Machine / it | |---|---|---|---| | Acemoglu-Restrepo 2020 (journal) | +1 robot per 1,000 workers: local employment -0.2 pt, wages -0.42% | 3.4 robots per 1,000 workers; no unemployment | - | | Morgan Stanley (new) | ~13 m in use by 2035 | 13.5 m | 1.0x | | Goldman Sachs 2024 | 1.4 m shipped, $38bn (2035) | 5.5 m built, $139bn at $25,000 | 4.0x / 3.6x | | Goldman 2026 revision | 6.5 m, $138bn | as above | 0.85x / 1.0x | | Barclays 2026 (new) | $200bn (optimistic); China up to 24 m | $139bn; 13.5 m worldwide | 0.7x / 0.56x | | UBS (new) | ~2 m in operation | 13.5 m | 6.8x | | Bank of America (new; blog only) | 10 m | 13.5 m | 1.35x | | Morgan Stanley 2025 | $5/hour robot does 2 humans' work at $25/hour: NPV ~$200k | $18k a year per robot, ~$70k NPV | 0.35x | | Morgan Stanley; Citi 2024 | ~1 bn, $5tn; 650 m, $7tn (2050) | beyond 2035 | - | ##### Gaps over 2x - **Goldman 2024 and UBS (4-7x lower):** they expect pilot-stage humanoids to scale slowly; the entry assumes the capability from 2028 and China's electric-car ramp (x1.69 a year). That is spread and capacity, not value. - **Morgan Stanley's value per robot (2.9x the machine's):** - US pay: a $20 an hour saving, against $9 at the world wage. - The machine counts one of each robot's two worker-equivalents; the other is in the baseline. Counting both gives ~$140k, within 2x. - **Acemoglu-Restrepo:** local job and pay losses are a channel the machine lacks (it has full employment, and lower pay is a transfer). Applied naively, they mean -0.7 points of employment and -1.4% pay. - **The 2050 trillions:** these are market sizes for fleets 50-75x larger, so they say nothing about 2035. ##### Which I trust more **Fleet size:** neither. The bank forecasts span 1.4 to 24 million on unstated assumptions; the machine's stated record ramp lands mid-range. **Value:** the machine, cautiously: it is fleet times wage gap, and no source gives a 2035 output effect. Its trust is still low: 10 of 12 key numbers are assumed, and its largest unknowns (robots in 2035, work per robot) are where forecasts disagree. **Either way:** these robots add well under 1% of world GDP by 2035, because they are too few against 3 billion people doing physical work. ### Example: A cheap cure for most cancers **Pitch.** "A cheap cure for most cancers (new)" **Restated.** A treatment that cures the cancers of four-fifths of people with a new cancer diagnosis (those whose cancer types it works on; the rest keep today's care), given as one course together with the diagnosis it needs, sold from 2028 at 1,000 int$ (2026, PPP) per patient treated, against about 90,400 int$ per patient for today's cancer care (world average, on course in 2035). **Main sources** (strength; saved copy or search only): - Manning, Newhouse, Duan, Keeler, Leibowitz and Marquis, Health Insurance and the Demand for Medical Care: Evidence from a Randomized Experiment, American Economic Review 77(3), 1987 (abstract). Copy of stage1-v1/agent2_ratios/raw/rand_manning1987/manning.txt (strength 1; saved) - Manning et al. 1987 (as rand_abstract), p. 268: the three estimation methods (strength 1; saved) - Manning et al. 1987 (as rand_abstract), Table 8: arc elasticities for coinsurance ranges 0-25 and 25-95 percent (the price range the evidence covers) (strength 1; saved) - Barber, Gotham, Bygrave and Cepuch, Estimated Sustainable Cost-Based Prices for Diabetes Medicines, JAMA Network Open 2024;7(3):e243474. Copy of stage1-v2/v1/agent3_needs/raw/barber2024_jama_pdf/paper.txt (strength 2; saved) - UN World Population Prospects 2024, population by five-year age group, medium variant: World, 2035 rows (saved by the AI agents entry; extract of stage1-v2/baseline/raw/un_wpp2024_age5/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) (strength 2; saved) - IARC, Global cancer statistics 2024: GLOBOCAN estimates of incidence and mortality worldwide for 34 cancers in 186 countries (news release; Bray et al., CA Cancer J Clin, July 2026). Search snippet only (strength 1; search only) **Entry (core):** ```yaml price: value: 1000 unit: 2026 int$ per patient treated (diagnosis, one curative course and follow-up) label: A sources: - barber2024 - hcv_generic60 - hcv_launch85k derivation: 'Batch run, no user to ask, so [A]. ''Cheap'' is read as the price of a generic curative medicine plus the diagnosis needed to give it. Comparable: hepatitis C,...' next_best: name: 'Today''s cancer care (surgery, radiotherapy, chemotherapy and other medicines, hospital stays, follow-up and end-of-life care): world average spending per patient treated, on course in 2035, at 2026 prices' price: value: 90392.59 low: 63274.81 high: 126549.62 unit: 2026 int$ per patient treated (diagnosis, one curative course and follow-up) label: A sources: - ihe2020 - ihe2020_103bn - eu_cases2022 - efpia_ihe2025 - oecd_hs6 - oecd_ncd94 - iarc2024 - iarc2050 - who_access2019 - sullivan2015 derivation: World cancer spending / patients treated = derivation_inputs.cancer_share_health (0.05) x 1e9 / Q0 factor (553.14 patients per bn of C05) = 0.05 x 1e9 / 553.... demand: - id: d1 good: new:cancer_cure layer: C05 mode: cost quantity_unit: patients treated a year (people with a new cancer diagnosis given a full course of care) P0: use: next_best P1: use: price Q0: model: oc:C05 factor: value: 553.14 low: 436.0 high: 683.0 unit: patients treated a year per bn of C05 output (on course 2035) label: A sources: - iarc2024 - iarc2050 - who_access2019 - sullivan2015 derivation: 'Patients treated on course in 2035 / on-course C05 output: derivation_inputs.treated_share 0.70 x cases_2035 25.591 million = 17.914 million, / 32,385.0 bn (...' elasticity: value: -0.2 low: -0.1 high: -0.4 unit: '% change in patients treated per 1% change in the price of care' label: A sources: - rand_range - rand_abstract - rand_arc - goldman2010 - goldman2006 - jung2017 evidence_price_range: - 22598.15 - 90392.59 derivation: 'RAND Health Insurance Experiment (randomised, US 1974-82, strength 1): ''The price elasticity is approximately - 0.2''; three methods put it ''in the -0.1 to -0...' elasticity_alternatives: - value: -0.1 unit: '% change in patients treated per 1% change in the price of care' label: A sources: - rand_range derivation: Lower end of RAND's -0.1 to -0.2 range (cancer patients in rich countries are already treated whatever the price). - value: -0.72 unit: '% change in cancer-drug spending per 1% change in the price paid' label: A sources: - jung2017 derivation: Medicare Part D, specialty cancer drugs, elderly without low-income subsidy (Jung, Feldman and McBean 2017, snippet). A spending elasticity for patients payi... limit: value: 25590734 low: 23543475 high: 27637992 unit: patients treated a year (people with a new cancer diagnosis given a full course of care) label: A sources: - iarc2024 - iarc2050 derivation: derivation_inputs.cases_2035, 25.591 million new cancer cases in 2035 (GLOBOCAN 2024 path, snippets). Low and high -8% and +8%. description: 'Physical need: at most every person with a new cancer diagnosis in 2035 is treated (1.43 x Q0). On the curve this binds below about 15,200 int$ per patient (...' changes: - id: ch1 kind: recipe input: LAB layers: - C05 multiplier: value: 0.95055 unit: x today's work per unit of C05 output label: A sources: [] derivation: 1 - cancer_share_health x (1 - P1 / P0) = 1 - 0.05 x (1 - 1,000 / 90,392.6) = 0.95055 at the reference price, scaled by the 2035 spread (0.504) in the engine... scale_with: adoption mechanism: 'The cure replaces costly cancer care with a cheap course, so health care (C05) needs less work per unit of output: the labour model''s work need (robots K04, AI agents K03 and their compute and electricity) falls. One mechanism with d1, carried to path (b).' - id: ch2 kind: recipe input: K18 layers: - C05 multiplier: value: 0.95055 unit: x today's human workers per unit of C05 output label: A sources: [] derivation: 'As ch1: the same resource saving applied to the human workforce ratio, which the model keeps separate from the labour model''s work need.' scale_with: adoption mechanism: 'Oncologists, nurses and other staff no longer needed for long cancer treatments are freed, so C05 needs fewer human workers per unit of output (path b). Not a second count of ch1: ch1 changes the machine-work need, ch2 the human-worker need.' - id: ch3 kind: recipe input: K21 layers: - C05 multiplier: value: 0.95055 unit: x today's capital stock per unit of C05 output label: A sources: [] derivation: 'As ch1: radiotherapy machines, operating theatres and hospital beds used for cancer care are freed in the same proportion [A].' scale_with: adoption mechanism: Less hospital and radiotherapy capital is needed per unit of health output, so the capital stock (K21, third to bind in stage1-v5) goes further in path (b). ``` **Comparison with published estimates** (after the run): #### cancer_cure_cheap: comparison with published estimates **Machine (2035, 2026 int$):** $958B measured GDP (median economy, 0.33% of world output; draws' median $572B): $807B freed care spending, $151B extra patients; workers kept alive $192B (not added). Value beyond GDP is $3.6T: 3.2M deaths avoided (25.7%). The cure reaches 50.4% of new patients. All estimates were read only in search snippets: strength 3 at best. Ratio = machine / estimate. | Estimate (strongest first) | Their number | Machine's scale, 2035 | Machine | Ratio | |---|---|---|---|---| | Chen et al. 2023, world | 0.55% of GDP a year | x $290T x 0.504 = $0.80T (upper bound) | $0.96T | 1.2 | | OECD 2024, OECD only | EUR PPP 449bn care, 163bn work | $0.63T; work x 0.504 = $0.11T [EUR PPP \u2248 1.4 int$, A] | world care $1.62T; workers $0.19T | 2.6; 1.7 | | Lakdawalla et al. 2010, US | $82,000 per life-year | \u2248 2.3x US income [A] | 2.3x world income | 1.0 | | Murphy & Topel 2006, US | $50T a cure (new); $500bn per 1% cut | 3% a year, x 25.7% \u2248 $0.7T | US share \u2248 $0.6T [A] | 0.8 | | Lancet Oncology Commission 2015 | >$6T lost 2015-30 without surgery | $0.4T a year | labour $0.19T | 0.5 | | WHO 2020 | 7M lives a decade | 0.7M a year | 3.2M | 4.6 | | ACS/LIVESTRONG 2010 (new) | 1.5% of GDP, DALYs | x 25.7% = $1.1T | $3.6T | 3.2 | | Moore & Philipson 2026, advocacy (new) | US $185T over 35 years; "+1 growth point" | x 25.7% \u2248 $1.3T | $0.6T; 0.02 points | 0.45; 0.02 | ##### Where they differ by more than 2x - **OECD care, WHO:** different scope. The OECD is 39% of the machine's world spending, which is plausible, though the 5% cancer share may be high. WHO scales up today's care, not a cure. - **ACS:** different valuation. ACS uses about 1x income per DALY, discounted; the machine uses 2.3x over 15 years. IARC 2014 (new) gives $1.16T, or $2.5T with a value of statistical life, so the machine is at the high end. - **Lancet Commission:** losses build from 2015 and include lost capital. The cure starts in 2028, with no capital channel and its workers unadded. - **Moore & Philipson:** full US values of life; the growth claim has no stated mechanism. ##### Which I trust more On measured GDP the machine and Chen agree within 2x, through different channels. 84% of the machine's gain is freed spending, which rests on an assumed cancer share. Chen counts lost labour, which the machine leaves unadded, and care spending only as lost investment (split not in snippets). I trust Chen more: peer-reviewed, modelled by country, age and cancer. The machine's trust is low, with all 12 key numbers assumed. The price lies beyond the evidence, but the limit binds below 15,200 int$, so it matters little. On value beyond GDP, Lakdawalla and Murphy-Topel support the machine's value of a life-year, so $3.6T is the upper middle of a 2-3x range. ### Example: Moon travel at $100 a trip **Pitch.** "Moon travel at $100 a trip (new)" **Restated.** A return trip for one passenger from Earth's surface to the Moon's surface and back, about a week, with seat, air, food and water on board (lodging on the Moon not included), sold at 100 int$ (2026, PPP) per trip from 2030, against about 65 million int$ for the nearest product sold today, a seat on a private crewed orbital flight of several days. **Main sources** (strength; saved copy or search only): - InterVISTAS Consulting for IATA (2007), Estimating Air Travel Demand Elasticities, Figure 3-1 reproducing Gillen, Morrison and Stewart's meta-study; saved copy from stage1-v1/agent2_ratios/raw/intervistas_2007/iv.txt (strength 3; saved) - UN World Population Prospects 2024, population by five-year age group, medium variant: World, 2035 rows (copy of sources/ai_office_agents__un_wpp2024_world2035.txt, an extract of stage1-v2/baseline/raw/un_wpp2024_age5/WPP2024_PopulationByAge5GroupSex_Medium.csv.gz) (strength 1; saved) - Our World in Data, electric car sales (IEA Global EV Outlook data): World rows; copy of sources/ai_office_agents__owid_ev_sales.txt (strength 1; saved) - IEA, World Energy Outlook 2025 (electric car share of the car market); saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo2025/weo2025.txt (strength 1; saved) - IRENA, Renewable Power Generation Costs in 2024 (summary); saved copy from stage1-v2/agent6_cheap_inputs/raw/irena_rpgc2024/summary.txt (used in the energy flag) (strength 1; saved) - World Bank Commodity Price Data (Pink Sheet), annual nominal prices, natural gas columns 2015-2024; extract of stage1-v2/agent6_cheap_inputs/raw/wb_pinksheet/CMO-Historical-Data-Annual.xlsx (used in the energy flag) (strength 1; saved) **Entry (core):** ```yaml price: value: 100 unit: 2026 int$ per return trip (Earth's surface to the Moon's surface and back, one passenger) label: A sources: [] derivation: Given in the pitch ($100 a trip). Batch run, no user to ask, so per research.md the price is [A]. The pitch's dollars are read as 2026 international dollars ... next_best: name: 'A seat on a private crewed orbital spaceflight of several days (Axiom Space''s private astronaut missions to the ISS, about 55-70 million US$ a seat). It is the nearest product on sale: no private Moon trip has flown (Space Adventures'' circumlunar offer, quoted at about 150 million US$ a seat, has never flown).' price: value: 65000000 unit: '2026 int$ per seat (same unit as the price: one passenger, one trip)' label: A sources: - s_axiom_mid60 - s_axiom_55 - s_sa_moon low: 55000000 high: 150000000 derivation: Axiom's standard seat price is reported in the 'mid-$60 million' range (2025; search snippet only, so [A]); the first mission (2022) was estimated at 55 mill... demand: - id: d1 good: new:moon_trip layer: C06 mode: cost quantity_unit: return trips to the Moon a year (one passenger each) P0: use: next_best P1: use: price Q0: value: 12 unit: trips a year bought on course in 2035 at the next-best price (private crewed orbital seats) label: A sources: - s_private_flights - s_soyuz_tourists low: 5 high: 30 derivation: 'Private crewed orbital flights 2021-2025: Inspiration4 (2021), Ax-1 (2022), Ax-2 (2023), Ax-3 and Polaris Dawn (2024), Ax-4 and Fram2 (2025), seven flights w...' elasticity: value: -1.04 unit: '% change in trips per 1% change in price' label: A sources: - s_iv_gillen - s_gillen - s_sp_surveys - s_iaato - s_fred_cpi low: -0.78 high: -1.56 evidence_price_range: - 300 - 3000 derivation: 'The median fare elasticity of long-haul international leisure air travel in Gillen, Morrison and Stewart''s meta-study, reproduced in InterVISTAS (2007): -1.0...' limit: value: 3040000000.0 unit: return trips to the Moon a year (one passenger each) label: A sources: - s_wpp_2035 - s_yougov_moon - s_axios_moon description: 'Physical bound beyond the evidence: at most one week-long trip a year for each person who would like to go. 6.471 billion people aged 15-74 in 2035 (UN WPP 2...' changes: - id: ch1 kind: own_output from_demand: d1 layer: C06 needs: - input: K01 per_unit: value: 2.18e-05 unit: TWh per trip (TWh a year per trip a year) label: A sources: - s_escape - s_elevator low: 1.45e-06 high: 9.6e-05 derivation: 'Energy to lift a mass from Earth''s surface out of Earth''s gravity (escape speed 11.19 km/s: 62.6 MJ/kg) and back out of the Moon''s on the return (2.38 km/s: ...' scale_with: adoption mechanism: The extra Moon trips are new output of transport services (C06), computed by the model from the demand curve, and each extra trip uses the electricity that lifts its passenger and cabin out of Earth's and the Moon's gravity (assumed electric launch, see performance). Path (b) also gives the new output C06's average recipe (workers, capital, fuel per dollar of output). ``` **Comparison with published estimates** (after the run): #### moon_travel_100: comparison with published estimates **Machine (world, 2035, $100 a trip against $65M for an orbital seat today):** a gain of $0.96B as written and $2B as the median of the draws (80% range $0B to $94B), with 6.93% of the market served. Spending on space trips is about $0.82B: $0.09B on 0.92M trips at $100 and $0.73B on 11 seats at $65M. The gain is mostly what buyers would have paid above $100, not revenue; with everyone served it is $13.8B. **No published estimate covers trips at anything near $100. Every figure below was read only in search snippets (full texts would not open): each is strength 3 at best and unsaved.** | Estimate (strongest first) | Their number | Same scale as the machine | Ratio | |---|---|---|---| | Stated-preference surveys (Collins et al.; Abitzsch; set the entry's elasticity range) | 150,000 trips a year at $22,400; 20M at $2,240 (2026 int$) | the machine's curve gives 48,000 and 524,000 | theirs 3x and 38x | | WEF and McKinsey 2024; PwC 2021 (new) | space economy $1.8T in 2035; lunar economy $170B over 2020-2040 | trips only | scope | | UBS 2019 | space tourism $3B a year by 2030; rocket travel on Earth $20B | spending $0.82B | 3.7x; a channel | | Futron 2002 (checkable) | over $1B a year by 2021: 15,000 suborbital and 60 orbital passengers | actual about 20 and 5 a year | 100-1,000x too high | | Bottom-up count 2026 (new) | orbital tourism under $0.5B a year | on course: 12 seats, $0.78B | within 2x | | Future Market Insights | space tourism $5.1B in 2035 | $0.82B | 6x | **Why they differ** 1. *Price and measure.* The forecasts are revenue at today's prices ($0.45M-65M a seat), not a gain at $100. 2. *Scope.* UBS and FMI include suborbital hops, outside the machine's base of orbital seats; WEF and PwC cover satellites and cargo. 3. *Forecast record.* Futron was 100-1,000x too high on passengers. The bottom-up count agrees with the machine's anchor, which rests on seats actually sold. 4. *Surveys* record what people say, which runs high. If they are right, demand is more elastic than -1.04. The entry's -1.56 end gives the $94B top of the range. 5. *A missing channel.* A $100 trip implies about $0.3 a kg to the Moon. Satellites, travel on Earth and space industry would become cheap too, and UBS's $20B and WEF's $1.8T suggest that could dwarf the trips (separate capabilities). **Which I trust.** For spending at today's prices, the machine: it rests on seats actually sold, matches the bottom-up count, and forecasts have overstated this market before. For $100 trips I would not trust the central $1-2B within 10x. Nothing published exists at that price, the machine stretches an air-travel elasticity across six orders of magnitude, and $100 is below the energy a trip must use at today's prices. The 80% range is the honest answer. Copy instructionsPaste the entry back into the box under the map: the page validates it, shows every number for editing and runs it. To add it to the library: save it as capabilities/.yaml, run code/validate.py, then run code/c_runs.py. How stable the research is Each starter was researched twice by agents that could not see each other's work. Below: how far apart their answers were, at each run's own price and at a tenth of the next-best option's price (a price both can be compared at). Where they were more than 2x apart, research.md was tightened once ("Rules that keep two runs alike") and the starter was researched twice more, fresh. Idea | First check: run B / run A at its price | at a tenth of the next-best | Within 2x | After tightening: run D / run C | at a tenth | Within 2x | AI agents doing most office work | 0.50x | 0.56x | no | 0.50x | 0.69x | yes | A cheap cure for most cancers | 0.86x | 0.90x | yes | | | | Much faster clinical approval | 1.34x | 2.17x | no | 1.08x | 6.22x | no | Construction with far less labour and material per building | 0.56x | 0.57x | yes | | | | Electricity at a fraction of today's cost | 1.28x | 1.14x | yes | | | | Transformers and grid equipment built far faster | 0.76x | 2.96x | no | 1.49x | 2.64x | no | Moon travel at $100 a trip | 65.93x | 0.23x | no | one is zero | 1.51x | no | Much faster building permits and grid connections | 0.80x | 0.73x | yes | | | | Human-level general-purpose robots | 2.44x | 1.87x | no | 0.53x | 0.48x | no | Tradespeople trained far faster | 1.77x | 1.16x | yes | | | | Sources - pitch/consistency.csv (https://world.abundancemachines.si/data/v7/pitch/consistency.csv) - pitch/consistency_diffs.csv (https://world.abundancemachines.si/data/v7/pitch/consistency_diffs.csv) - pitch/consistency_repeat.csv (https://world.abundancemachines.si/data/v7/pitch/consistency_repeat.csv) - pitch/quick_band.csv (https://world.abundancemachines.si/data/v7/pitch/quick_band.csv) Quick instructions (translate.md) (https://world.abundancemachines.si/data/v7/pitch/translate.md) Model IDs (model_ids.md) (https://world.abundancemachines.si/data/v7/pitch/model_ids.md) Entry template (https://world.abundancemachines.si/data/v7/capabilities/_template.yaml) How far to trust it: the machine's own benchmark https://world.abundancemachines.si/guide/benchmark.html Five past capabilities whose real effect is known from after-the-fact studies, pitched blind and frozen before any 2035 result. Past capability | What was measured | Machine (80% range) | Known | Within 2x | Inside the range | Auckland Unitary Plan upzoning (terraced houses and apartments allowed on most residential land) | additional dwellings consented over five years, % of the region's dwelling stock | 2.2 (0 to 8.95) | 5.07 [S] | no | yes | Generative-AI reply and documentation assistant for customer-support chat agents (2020-2021) | % more issues resolved per hour | 11.6 (0 to 16.5) | 14 [A] | yes | yes | Cheaper grid connections for rural Kenyan households near a transformer (2014-2015) | % of unconnected households taking a grid connection at $171 (from $398) | 34.8 (4.29 to 100) | 23.7 [S] | yes | yes | Industrial robots spreading in 17 rich countries, 1993-2007 (retro-pitch, blind) | percentage points a year of labour productivity growth | 0.000893 (0.000167 to 0.00441) | 0.36 [S] | no | no | App-based ride hailing (UberX) in the United States, 2015 | bn US$ of consumer surplus in 2015 | 0.773 (0 to 4.96) | 6.76 [S] | no | no | Scorecard Score | Value | Better is | retro-pitches within 2x of the known effect | 2 of 5 | higher | known effect inside the machine's 80% range | 3 of 5 (aim: about 80%) | closer to 0.8 | median machine / known (retro) | 0.43 | closer to 1 | two independent research runs within 2x of each other (at the reference price and at a tenth of the next-best) | 5 of 10 starters | higher | after research.md was tightened: repeat runs within 2x of each other (starters that had moved more than 2x) | 1 of 5 starters | higher | quick-path error band (quick / full, median and 80% range) | median 1.44, 80% of starters 0.30 to 19.99 | narrower, median closer to 1 | share of starting-number tests passing (A2) | 94% of 52 tests | higher | no-capability match with stage1-v5 (A4) | largest breaking-point difference 3.0e-16 a year | 1 (exact) | The machine tends to undercount: it counts robots as extra worker-hours and misses their effect on the workers who remain, and for a new product its gain stops at the next-best option's price. Several agents saw the studies' answers in search summaries (none used them), so treat the benchmark as near-blind. What leaked into the blind searches Past capability | What appeared | What the agent did | Auckland Unitary Plan upzoning (terraced houses and apartments allowed on most residential land) | Three searches surfaced forbidden material: the upzoned land share quoted from the after-the-fact study and later papers; Auckland consent counts after 2016; and, unasked, the study's own count of extra consents. The agent also recalled the study's headline from training. | Key numbers were settled before the last leak (logged in pitch/logs/retro_auckland_upzoning.md). The demand limit was chosen after seeing post-2016 counts but does not bind at the entry's price. None of the leaked numbers is used. | Generative-AI reply and documentation assistant for customer-support chat agents (2020-2021) | Two search summaries showed results of the forbidden study (a productivity percentage and a chat-duration result). The model was trained on text that includes the study. | Neither used. Method and central values were worked out before the first search but written into the log just after the first leak, as the log says (pitch/logs/retro_genai_support.md). | Cheaper grid connections for rural Kenyan households near a transformer (2014-2015) | Three searches showed the forbidden study's findings in words (demand falls sharply with price; few connections at the partial subsidies). | None used; method, central values and most ranges were fixed before the clearest leak (pitch/logs/retro_kenya_connections.md). Ethiopian voucher evidence was dropped because its numbered versions are from 2014-2015. | Industrial robots spreading in 17 rich countries, 1993-2007 (retro-pitch, blind) | The forbidden study's PDF link appeared in a search result; post-1993 robot price indices (IFR 1990-2005, Karlsson 2001, UN/ECE 2003) and later robot stock counts appeared. No search showed the study's answer. The agent knows the study's result from training. | None of these used (pitch/logs/retro_robots.md). The entry avoids robots_general.yaml, which cites the forbidden study. | App-based ride hailing (UberX) in the United States, 2015 | None from the forbidden study. Some post-2014 items appeared in search results (a 2015 Reuters leak, a 2015 Manhattan Institute brief, 2015-2016 taxi data). The 18% tip figure was seen on a 2015 page quoting the 2014 TLC Fact Book. | None of the post-2014 items used; the Fact Book itself is cited for the tip (pitch/logs/retro_uber.md). | Sources - retro/results.csv (https://world.abundancemachines.si/data/v7/retro/results.csv) - retro/known.csv (https://world.abundancemachines.si/data/v7/retro/known.csv) - scorecard.csv (https://world.abundancemachines.si/data/v7/scorecard.csv) - MANIFEST.csv (https://world.abundancemachines.si/data/v7/MANIFEST.csv) Testing the starting numbers and the arithmetic https://world.abundancemachines.si/guide/tests.html Before any idea runs, the stage1-v5 starting numbers are tested against history and the model is checked against hand-worked answers. Sense, record and history tests (A2) ran on every recipe and supply number the data allow. Fuels: v3alt. Lithium: kept (no sourced alternative fails fewer tests). Human workforce: kept (no sourced alternative fails fewer tests). With no idea switched on, the model gives exactly stage1-v5's breaking points: the same inputs, order and growth rates (A4). Thirty toy economies, placebos and the same-idea-twice test match their hand-worked answers (A5). The page's JavaScript model gives the Python model's results on every idea, pair and toy economy. Sources - checks/a2_tests.csv (https://world.abundancemachines.si/data/v7/checks/a2_tests.csv) - checks/a2_replacements.csv (https://world.abundancemachines.si/data/v7/checks/a2_replacements.csv) - checks/a4_breaking_points.csv (https://world.abundancemachines.si/data/v7/checks/a4_breaking_points.csv) - checks/a5_toys.csv (https://world.abundancemachines.si/data/v7/checks/a5_toys.csv) - checks/d_js_python.csv (https://world.abundancemachines.si/data/v7/checks/d_js_python.csv) Starting numbers https://world.abundancemachines.si/guide/agent-1.html stage1-v5's layers, recipes and supplies. The 2026 map, the 2035 target and the input needs, read unchanged. Read the explanation (https://world.abundancemachines.si/guide/layers.html) Sources - numbers_a1.csv (https://world.abundancemachines.si/data/v7/numbers_a1.csv) Number tests https://world.abundancemachines.si/guide/agent-2.html Sense, record and history tests. Each starting number checked against what countries have done. Read the explanation (https://world.abundancemachines.si/guide/tests.html) Sources - checks/a2_tests.csv (https://world.abundancemachines.si/data/v7/checks/a2_tests.csv) What people buy https://world.abundancemachines.si/guide/agent-3.html Demand at the idea's price. Savings on units bought anyway plus the extra units bought. Read the explanation (https://world.abundancemachines.si/guide/methods.html) Sources - results/receipts.csv (https://world.abundancemachines.si/data/v7/results/receipts.csv) What inputs allow https://world.abundancemachines.si/guide/agent-4.html The breaking-point path with the idea. Where the first input runs short with the idea in place. Read the explanation (https://world.abundancemachines.si/guide/shortages.html) Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) Past cases https://world.abundancemachines.si/guide/agent-5.html Five capabilities pitched blind. Scored against after-the-fact studies and frozen. Read the explanation (https://world.abundancemachines.si/guide/benchmark.html) Sources - retro/results.csv (https://world.abundancemachines.si/data/v7/retro/results.csv) Idea research https://world.abundancemachines.si/guide/agent-6.html Ten starters researched and checked. Red-teamed, source-checked and researched twice. Read the explanation (https://world.abundancemachines.si/guide/ideas.html) Sources - results/summary.csv (https://world.abundancemachines.si/data/v7/results/summary.csv) Six research streams https://world.abundancemachines.si/guide/agents.html Follow the evidence that goes into the machine. Starting numbers (https://world.abundancemachines.si/guide/agent-1.html) Number tests (https://world.abundancemachines.si/guide/agent-2.html) What people buy (https://world.abundancemachines.si/guide/agent-3.html) What inputs allow (https://world.abundancemachines.si/guide/agent-4.html) Past cases (https://world.abundancemachines.si/guide/agent-5.html) Idea research (https://world.abundancemachines.si/guide/agent-6.html) Model JSON { "version": "stage1-v7", "output_unit": "billion 2026 international dollars (PPP), annual output", "world": { "today": 224261.881, "growth": 65949.94628252547, "on_course": 290211.8272825255, "target": 448523.76200000005, "tier1": 28044.294404733057, "tier2": 130267.64031274151, "ceiling": 318256.12168725854, "gap": 158311.93471747456, "target_rate": 0.08005973889230611 }, "ideas": [ { "id": "ai_office_agents", "name": "AI agents doing most office work", "category": "new", "price": "5000.0", "price_unit": "2026 int$ per worker-year of office (cognitive) work", "next_best": "A human office worker (ISCO 1-4 occupations): pay per worker-year of cognitive work, on course in 2035", "next_best_price": "63246.58", "price_vs_next_best": "0.07905565802925628", "adoption_2035": "0.2887437126042044", "gap_share": "0.2504866651028194", "gap_share_p10": "0.0", "gap_share_p50": "0.06681172005557569", "gap_share_p90": "0.2200153820357699", "tier1_share": "0.17714580050317236", "tier1_share_p10": "0.0", "tier1_share_p90": "0.1778971854526242", "tier2_share": "0.07334086459964707", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0307910672139362", "gap_bn": "39655.02857335546", "gap_bn_p10": "0.0", "gap_bn_p90": "37057.449448139814", "tier1_bn": "28044.294404732995", "tier2_bn": "11610.734168622468", "gap_bn_p50": "10943.74034497366", "tier1_share_p50": "0.06185048857389897", "tier2_share_p50": "0.0", "growth_pts_p50": "0.0043922382874104215", "growth_pts": "0.01474911249420674", "growth_pts_p10": "0.0", "growth_pts_p90": "0.01387835855305184", "path_a_bn": "329866.855855881", "path_b_bn": "331787.1728833837", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "39655.02857335546", "path_b_room_bn": "41575.345600858156", "limited_by": "buyers", "share_draws_inputs_limit": "0.675", "binds_next": "K22", "binds_next_name": "Cropland", "binds_after": "K04", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.693", "share_draws_most": "0.693", "binds_next_shares": "K22:0.693 K17:0.279 K04:0.028", "beyond_evidence": "True", "share_draws_beyond_evidence": "1.0", "possible_extra_bn": "0.0", "gap_share_v5_numbers": "0.2504866651028194", "gap_share_replaced_numbers": "0.2504866651028194", "binds_next_replaced_numbers": "K22", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.23183556989222606", "gap_share_sourced_only": "0.0", "measured_gdp_gained_bn": "39655.02857335546", "value_beyond_gdp_bn": "682.9633518778246", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (8 of 10 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "8", "n_key_numbers": "10", "rank": "1", "rank_sourced_only": "9" }, { "id": "construction_efficient", "name": "Construction with far less labour and material per building", "category": "efficient", "price": "0.8", "price_unit": "2026 int$ per int$ of construction (C13) at today's methods and prices", "next_best": "Today's construction methods (site-built, today's labour and material per unit), at today's prices", "next_best_price": "1.0", "price_vs_next_best": "0.8", "adoption_2035": "0.11361216812329283", "gap_share": "0.010619072788295823", "gap_share_p10": "0.0", "gap_share_p50": "0.004789108954191013", "gap_share_p90": "0.04089232186007777", "tier1_share": "0.010619072788295823", "tier1_share_p10": "0.0", "tier1_share_p90": "0.04068205162889917", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "1681.1259580207989", "gap_bn_p10": "0.0", "gap_bn_p90": "6630.370904054092", "tier1_bn": "1681.1259580207989", "tier2_bn": "0.0", "gap_bn_p50": "767.8926359534671", "tier1_share_p50": "0.004533452980926575", "tier2_share_p50": "0.0", "growth_pts_p50": "0.00030389635313754493", "growth_pts": "0.000660643416276141", "growth_pts_p10": "0.0", "growth_pts_p90": "0.0026189330877660183", "path_a_bn": "291892.95324054634", "path_b_bn": "328986.10722496297", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "1681.1259580207989", "path_b_room_bn": "38774.279942437424", "limited_by": "buyers", "share_draws_inputs_limit": "0.174", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.17", "share_draws_most": "0.576", "binds_next_shares": "K22:0.576 K17:0.252 K04:0.170 K21:0.002", "beyond_evidence": "False", "share_draws_beyond_evidence": "0.0", "possible_extra_bn": "0.72780936603125", "gap_share_v5_numbers": "0.010619072788295823", "gap_share_replaced_numbers": "0.010619072788295823", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.011504810872398947", "gap_share_sourced_only": "0.010003559541289151", "measured_gdp_gained_bn": "1681.1259580207989", "value_beyond_gdp_bn": "23.313216898899686", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (12 of 15 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "12", "n_key_numbers": "15", "rank": "2", "rank_sourced_only": "1" }, { "id": "cancer_cure_cheap", "name": "A cheap cure for most cancers", "category": "new", "price": "1000.0", "price_unit": "2026 int$ per patient treated (diagnosis, one curative course and follow-up)", "next_best": "Today's cancer care (surgery, radiotherapy, chemotherapy and other medicines, hospital stays, follow-up and end-of-life care): world average spending per patient treated, on course in 2035, at 2026 prices", "next_best_price": "90392.59", "price_vs_next_best": "0.011062853714004655", "adoption_2035": "0.5039106114416398", "gap_share": "0.006051779114145938", "gap_share_p10": "0.0", "gap_share_p50": "0.0035147683164075275", "gap_share_p90": "0.010755650909706375", "tier1_share": "0.006051779114145938", "tier1_share_p10": "0.0", "tier1_share_p90": "0.010734729524574447", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "958.0688600432477", "gap_bn_p10": "0.0", "gap_bn_p90": "1777.442648244737", "tier1_bn": "958.0688600432477", "tier2_bn": "0.0", "gap_bn_p50": "571.9727876910765", "tier1_share_p50": "0.0034540698539913366", "tier2_share_p50": "0.0", "growth_pts_p50": "0.0002310071125621871", "growth_pts": "0.0003769143847620615", "growth_pts_p10": "0.0", "growth_pts_p90": "0.0007136802044544587", "path_a_bn": "291169.8961425688", "path_b_bn": "328156.0492104826", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "958.0688600432477", "path_b_room_bn": "37944.221927957085", "limited_by": "buyers", "share_draws_inputs_limit": "0.224", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.194", "share_draws_most": "0.537", "binds_next_shares": "K22:0.537 K17:0.269 K04:0.194", "beyond_evidence": "True", "share_draws_beyond_evidence": "1.0", "possible_extra_bn": "191.50451850125", "gap_share_v5_numbers": "0.006051779114145938", "gap_share_replaced_numbers": "0.006051779114145938", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.0067642759114243745", "gap_share_sourced_only": "0.0050970633594003955", "measured_gdp_gained_bn": "958.0688600432477", "value_beyond_gdp_bn": "3627.037679989018", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (12 of 12 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "12", "n_key_numbers": "12", "rank": "3", "rank_sourced_only": "2" }, { "id": "permits_grid_fast", "name": "Much faster building permits and grid connections", "category": "unblocked", "price": "0.015761", "price_unit": "2026 int$ of waiting cost per $ of construction (C13)", "next_best": "Today's permitting and grid-connection process: about 9 months of waiting averaged over world construction (about 5 months for building permits, about 45 months for grid connections and other major infrastructure approvals)", "next_best_price": "0.067548", "price_vs_next_best": "0.23333037247586902", "adoption_2035": "0.14312411648673018", "gap_share": "0.0033273219007260253", "gap_share_p10": "0.0", "gap_share_p50": "0.0017509724697387988", "gap_share_p90": "0.011291631595859596", "tier1_share": "0.0033273219007260253", "tier1_share_p10": "0.0", "tier1_share_p90": "0.011291631595859596", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "526.7547675317619", "gap_bn_p10": "0.0", "gap_bn_p90": "1823.4166115358764", "tier1_bn": "526.7547675317619", "tier2_bn": "0.0", "gap_bn_p50": "291.25478371282225", "tier1_share_p50": "0.0017104105976957608", "tier2_share_p50": "0.0", "growth_pts_p50": "0.00011590299020702854", "growth_pts": "0.00020736751966410338", "growth_pts_p10": "0.0", "growth_pts_p90": "0.0007344071583444967", "path_a_bn": "290738.5820500573", "path_b_bn": "327345.2465355186", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "526.7547675317619", "path_b_room_bn": "37133.41925299307", "limited_by": "buyers", "share_draws_inputs_limit": "0.218", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.205", "share_draws_most": "0.526", "binds_next_shares": "K22:0.526 K17:0.269 K04:0.205", "beyond_evidence": "False", "share_draws_beyond_evidence": "0.0", "possible_extra_bn": "0.0", "gap_share_v5_numbers": "0.0033273219007260253", "gap_share_replaced_numbers": "0.0033273219007260253", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.0036453535181205023", "gap_share_sourced_only": "0.0032631218397689695", "measured_gdp_gained_bn": "526.7547675317619", "value_beyond_gdp_bn": "73.16504834801647", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (7 of 10 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "7", "n_key_numbers": "10", "rank": "4", "rank_sourced_only": "3" }, { "id": "robots_general", "name": "Human-level general-purpose robots", "category": "new", "price": "5.0", "price_unit": "2026 int$ per hour of human-level physical work", "next_best": "A human worker doing the same physical task, at the model's world average pay per hour of physical work (ISCO 5-9), on course in 2035", "next_best_price": "14.04", "price_vs_next_best": "0.3561253561253562", "adoption_2035": "0.17960801983907312", "gap_share": "0.0015414866265072368", "gap_share_p10": "0.0", "gap_share_p50": "0.0011220205991298458", "gap_share_p90": "0.0023853142116344716", "tier1_share": "0.0015414866265072368", "tier1_share_p10": "0.0", "tier1_share_p90": "0.0023739033720197675", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "244.0357301834738", "gap_bn_p10": "0.0", "gap_bn_p90": "378.9766080916394", "tier1_bn": "244.0357301834738", "tier2_bn": "0.0", "gap_bn_p50": "182.4982009656378", "tier1_share_p50": "0.0011012095865950934", "tier2_share_p50": "0.0", "growth_pts_p50": "7.355585852075741e-05", "growth_pts": "9.611109137841467e-05", "growth_pts_p10": "0.0", "growth_pts_p90": "0.00015212929408419117", "path_a_bn": "290455.863012709", "path_b_bn": "328727.60911269876", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "244.0357301834738", "path_b_room_bn": "38515.78183017322", "limited_by": "buyers", "share_draws_inputs_limit": "0.214", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.183", "share_draws_most": "0.548", "binds_next_shares": "K22:0.548 K17:0.269 K04:0.183", "beyond_evidence": "False", "share_draws_beyond_evidence": "0.366", "possible_extra_bn": "0.0", "gap_share_v5_numbers": "0.0015414866265072368", "gap_share_replaced_numbers": "0.0015414866265072368", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.0016330868127474953", "gap_share_sourced_only": "0.0", "measured_gdp_gained_bn": "244.0357301834738", "value_beyond_gdp_bn": "1.480688515553319", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (10 of 12 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "10", "n_key_numbers": "12", "rank": "5", "rank_sourced_only": "9" }, { "id": "electricity_cheap", "name": "Electricity at a fraction of today's cost", "category": "efficient", "price": "45.43", "price_unit": "2026 int$ per MWh of electricity delivered to final users", "next_best": "Today's grid electricity, delivered to final users (all sectors)", "next_best_price": "136.3", "price_vs_next_best": "0.3333088774761555", "adoption_2035": "0.04491353640127627", "gap_share": "0.0011470329341436416", "gap_share_p10": "0.0", "gap_share_p50": "0.0008472620994271615", "gap_share_p90": "0.0016637065894408878", "tier1_share": "0.0011470329341436416", "tier1_share_p10": "0.0", "tier1_share_p90": "0.0016604856895385768", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "181.5890029889415", "gap_bn_p10": "0.0", "gap_bn_p90": "271.064633797665", "tier1_bn": "181.5890029889415", "tier2_bn": "0.0", "gap_bn_p50": "139.30989042192232", "tier1_share_p50": "0.0008305059648624977", "tier2_share_p50": "0.0", "growth_pts_p50": "5.574580873579649e-05", "growth_pts": "7.152389284015293e-05", "growth_pts_p10": "0.0", "growth_pts_p90": "0.00010875896996525027", "path_a_bn": "290393.4162855145", "path_b_bn": "327373.59841796535", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "181.5890029889415", "path_b_room_bn": "37161.771135439805", "limited_by": "buyers", "share_draws_inputs_limit": "0.214", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.205", "share_draws_most": "0.526", "binds_next_shares": "K22:0.526 K17:0.269 K04:0.205", "beyond_evidence": "False", "share_draws_beyond_evidence": "0.0", "possible_extra_bn": "0.0", "gap_share_v5_numbers": "0.0011470329341436416", "gap_share_replaced_numbers": "0.0011470329341436416", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.001215193389501815", "gap_share_sourced_only": "0.0009644840483015026", "measured_gdp_gained_bn": "181.5890029889415", "value_beyond_gdp_bn": "138.87984071857042", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (10 of 12 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "10", "n_key_numbers": "12", "rank": "6", "rank_sourced_only": "4" }, { "id": "grid_equipment_fast", "name": "Transformers and grid equipment built far faster", "category": "faster", "price": "0.0075053", "price_unit": "2026 int$ of waiting cost per $ of equipment in grid-connected power, grid and data-centre projects (C14)", "next_best": "Today's transformer and grid-equipment supply: large power transformers average about 128 weeks (Wood Mackenzie, Q2 2025), against 30-60 weeks before the pandemic; the median US power project took 31 months from interconnection agreement to operation in 2025 against 21 months in 2008. Taken as about 8 months of waiting for equipment on the average grid-connected project's critical path.", "next_best_price": "0.060043", "price_vs_next_best": "0.12499875089519179", "adoption_2035": "0.5668994378718448", "gap_share": "0.00025623137391972113", "gap_share_p10": "0.0", "gap_share_p50": "0.00011477970503149181", "gap_share_p90": "0.0004924058162836155", "tier1_share": "0.00025623137391972113", "tier1_share_p10": "0.0", "tier1_share_p90": "0.0004924058162836155", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "40.56448454054771", "gap_bn_p10": "0.0", "gap_bn_p90": "77.91929427027937", "tier1_bn": "40.56448454054771", "tier2_bn": "0.0", "gap_bn_p50": "18.265413767658174", "tier1_share_p50": "0.0001139925215820386", "tier2_share_p50": "0.0", "growth_pts_p50": "7.260737030279074e-06", "growth_pts": "1.5980903442791572e-05", "growth_pts_p10": "0.0", "growth_pts_p90": "3.1968870949494745e-05", "path_a_bn": "290252.3917670661", "path_b_bn": "327345.2465355186", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "40.56448454054771", "path_b_room_bn": "37133.41925299307", "limited_by": "buyers", "share_draws_inputs_limit": "0.214", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.205", "share_draws_most": "0.526", "binds_next_shares": "K22:0.526 K17:0.269 K04:0.205", "beyond_evidence": "False", "share_draws_beyond_evidence": "0.0", "possible_extra_bn": "0.0", "gap_share_v5_numbers": "0.00025623137391972113", "gap_share_replaced_numbers": "0.00025623137391972113", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.00027624732252452757", "gap_share_sourced_only": "0.0002521637474256023", "measured_gdp_gained_bn": "40.56448454054771", "value_beyond_gdp_bn": "163.8792894999929", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (8 of 9 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "8", "n_key_numbers": "9", "rank": "7", "rank_sourced_only": "6" }, { "id": "clinical_approval_fast", "name": "Much faster clinical approval", "category": "unblocked", "price": "758414458.0", "price_unit": "2026 int$ of time cost (return forgone on capital tied up in development until approval) per new medicine approved", "next_best": "Today's process: about 8 years (95 months) from first human trial to approval (clinical trials and regulatory review), after about 2.6 years of pre-human research; the time cost per new medicine approved at today's speed", "next_best_price": "1659496921.0", "price_vs_next_best": "0.4570146822224806", "adoption_2035": "0.7433443052987361", "gap_share": "0.00026397749728742064", "gap_share_p10": "0.0", "gap_share_p50": "0.00010298573421740158", "gap_share_p90": "0.00032435725946081156", "tier1_share": "0.00026397749728742064", "tier1_share_p10": "0.0", "tier1_share_p90": "0.00032251458104251286", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "41.79078831744846", "gap_bn_p10": "0.0", "gap_bn_p90": "52.34427322710981", "tier1_bn": "41.79078831744846", "tier2_bn": "0.0", "gap_bn_p50": "16.465876983027556", "tier1_share_p50": "9.991278532065921e-05", "tier2_share_p50": "0.0", "growth_pts_p50": "6.581204361144621e-06", "growth_pts": "1.646399076338234e-05", "growth_pts_p10": "0.0", "growth_pts_p90": "2.1052953115496826e-05", "path_a_bn": "290253.618070843", "path_b_bn": "327345.2465355186", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "41.79078831744846", "path_b_room_bn": "37133.41925299307", "limited_by": "buyers", "share_draws_inputs_limit": "0.214", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.205", "share_draws_most": "0.526", "binds_next_shares": "K22:0.526 K17:0.269 K04:0.205", "beyond_evidence": "False", "share_draws_beyond_evidence": "0.0", "possible_extra_bn": "27.305930288281253", "gap_share_v5_numbers": "0.00026397749728742064", "gap_share_replaced_numbers": "0.00026397749728742064", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.00027966390513485946", "gap_share_sourced_only": "0.00025385875752379026", "measured_gdp_gained_bn": "41.79078831744846", "value_beyond_gdp_bn": "3316.354769415397", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (10 of 10 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "10", "n_key_numbers": "10", "rank": "8", "rank_sourced_only": "5" }, { "id": "trades_training_fast", "name": "Tradespeople trained far faster", "category": "faster", "price": "17928.0", "price_unit": "2026 int$ of resources per tradesperson trained (output forgone while learning, against a qualified tradesperson, plus instruction)", "next_best": "Today's training: about three years of apprenticeship or on-the-job learning (US registered apprenticeships are mostly four years or 8,000 hours; German dual apprenticeships about three years; informal apprenticeships one to two years or longer), during which the trainee works at about the level of an elementary construction worker.", "next_best_price": "33345.0", "price_vs_next_best": "0.5376518218623482", "adoption_2035": "0.14368641587125852", "gap_share": "0.00012783159622263278", "gap_share_p10": "0.0", "gap_share_p50": "5.130476839970775e-05", "gap_share_p90": "0.0005686716620826325", "tier1_share": "0.00012783159622263278", "tier1_share_p10": "0.0", "tier1_share_p90": "0.0005505535916978478", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "20.23726731602801", "gap_bn_p10": "0.0", "gap_bn_p90": "94.01361997671778", "tier1_bn": "20.23726731602801", "tier2_bn": "0.0", "gap_bn_p50": "8.605041034286842", "tier1_share_p50": "4.8886888080521806e-05", "tier2_share_p50": "0.0", "growth_pts_p50": "3.4697042047282523e-06", "growth_pts": "7.972981430848236e-06", "growth_pts_p10": "0.0", "growth_pts_p90": "3.743954777710724e-05", "path_a_bn": "290232.06454984157", "path_b_bn": "327422.1197359749", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "20.23726731602801", "path_b_room_bn": "37210.292453449336", "limited_by": "buyers", "share_draws_inputs_limit": "0.212", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.204", "share_draws_most": "0.527", "binds_next_shares": "K22:0.527 K17:0.269 K04:0.204", "beyond_evidence": "True", "share_draws_beyond_evidence": "1.0", "possible_extra_bn": "37.20020120064063", "gap_share_v5_numbers": "0.00012783159622263278", "gap_share_replaced_numbers": "0.00012783159622263278", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "0.00013542776852800938", "gap_share_sourced_only": "0.00011776055046649946", "measured_gdp_gained_bn": "20.23726731602801", "value_beyond_gdp_bn": "0.0", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (11 of 11 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "11", "n_key_numbers": "11", "rank": "9", "rank_sourced_only": "7" }, { "id": "moon_travel_100", "name": "Moon travel at $100 a trip", "category": "new", "price": "100.0", "price_unit": "2026 int$ per return trip (Earth's surface to the Moon's surface and back, one passenger)", "next_best": "A seat on a private crewed orbital spaceflight of several days (Axiom Space's private astronaut missions to the ISS, about 55-70 million US$ a seat). It is the nearest product on sale: no private Moon trip has flown (Space Adventures' circumlunar offer, quoted at about 150 million US$ a seat, has never flown).", "next_best_price": "65000000.0", "price_vs_next_best": "1.5384615384615385e-06", "adoption_2035": "0.06929026946400843", "gap_share": "6.043598698642173e-06", "gap_share_p10": "0.0", "gap_share_p50": "1.181698711131917e-05", "gap_share_p90": "0.0005985207434089785", "tier1_share": "6.043598698642173e-06", "tier1_share_p10": "0.0", "tier1_share_p90": "0.0005985207434089785", "tier2_share": "0.0", "tier2_share_p10": "0.0", "tier2_share_p90": "0.0", "gap_bn": "0.9567738026380539", "gap_bn_p10": "0.0", "gap_bn_p90": "94.03464408796867", "tier1_bn": "0.9567738026380539", "tier2_bn": "0.0", "gap_bn_p50": "2.0089655924821272", "tier1_share_p50": "1.1493697705765626e-05", "tier2_share_p50": "0.0", "growth_pts_p50": "8.100930396492956e-07", "growth_pts": "3.7695627974621004e-07", "growth_pts_p10": "0.0", "growth_pts_p90": "3.931730456268046e-05", "path_a_bn": "290212.7840563282", "path_b_bn": "327344.78969173913", "on_course_bn": "290211.82728252554", "target_bn": "448523.7620000001", "path_a_gain_bn": "0.9567738026380539", "path_b_room_bn": "37132.96240921359", "limited_by": "buyers", "share_draws_inputs_limit": "0.226", "binds_next": "K04", "binds_next_name": "Physical machine labour (robots)", "binds_after": "K22", "binds_next_most_draws": "K22", "share_draws_binds_next": "0.2", "share_draws_most": "0.519", "binds_next_shares": "K22:0.519 K17:0.265 K04:0.200 K01:0.016", "beyond_evidence": "True", "share_draws_beyond_evidence": "1.0", "possible_extra_bn": "0.0", "gap_share_v5_numbers": "6.043598698642173e-06", "gap_share_replaced_numbers": "6.043598698642173e-06", "binds_next_replaced_numbers": "K04", "gap_share_draws_only_p10": "0.0", "gap_share_draws_only_p90": "6.402729135998846e-06", "gap_share_sourced_only": "3.413913620084094e-07", "measured_gdp_gained_bn": "0.9567738026380539", "value_beyond_gdp_bn": "0.0", "trust": "low", "trust_method": "method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5", "trust_data": "weakest key number [A] (9 of 9 key numbers assumed); no key number rests on a saved source", "weakest_label": "A", "weakest_strength": "", "n_assumed": "9", "n_key_numbers": "9", "rank": "10", "rank_sourced_only": "8" } ], "pairs": [ { "a": "ai_office_agents", "b": "construction_efficient", "gap_bn_a": "39655.02857335546", "gap_bn_b": "1681.1259580207989", "gap_bn_pair": "41336.1545313762", "gap_share_pair": "0.2611057378911149", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.2319817324089884", "pair_minus_sum_bn": "-5.820766091346741e-11", "relation": "add up", "unlocks": "", "binds_next": "K22", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "ai_office_agents", "b": "cancer_cure_cheap", "gap_bn_a": "39655.02857335546", "gap_bn_b": "958.0688600432477", "gap_bn_pair": "40613.09743339871", "gap_share_pair": "0.25653844421696537", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.20098156654495405", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K22", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "ai_office_agents", "b": "permits_grid_fast", "gap_bn_a": "39655.02857335546", "gap_bn_b": "526.7547675317619", "gap_bn_pair": "40181.783340887225", "gap_share_pair": "0.25381398700354546", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.21621571849098806", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K22", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "ai_office_agents", "b": "robots_general", "gap_bn_a": "39655.02857335546", "gap_bn_b": "244.0357301834738", "gap_bn_pair": "39899.06430353894", "gap_share_pair": "0.2520281517293267", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.20040117693413917", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K22", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "construction_efficient", "b": "cancer_cure_cheap", "gap_bn_a": "1681.1259580207989", "gap_bn_b": "958.0688600432477", "gap_bn_pair": "2639.1948180640466", "gap_share_pair": "0.01667085190244176", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.04299533620561983", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K04", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "construction_efficient", "b": "permits_grid_fast", "gap_bn_a": "1681.1259580207989", "gap_bn_b": "526.7547675317619", "gap_bn_pair": "2207.8807255525026", "gap_share_pair": "0.01394639468902148", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.04380366816986129", "pair_minus_sum_bn": "-5.820766091346741e-11", "relation": "add up", "unlocks": "", "binds_next": "K04", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "construction_efficient", "b": "robots_general", "gap_bn_a": "1681.1259580207989", "gap_bn_b": "244.0357301834738", "gap_bn_pair": "1925.1616882042144", "gap_share_pair": "0.012160559414802692", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.03800210759372213", "pair_minus_sum_bn": "-5.820766091346741e-11", "relation": "add up", "unlocks": "", "binds_next": "K04", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "cancer_cure_cheap", "b": "permits_grid_fast", "gap_bn_a": "958.0688600432477", "gap_bn_b": "526.7547675317619", "gap_bn_pair": "1484.8236275750096", "gap_share_pair": "0.009379101014871962", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.017318056758551397", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K04", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "cancer_cure_cheap", "b": "robots_general", "gap_bn_a": "958.0688600432477", "gap_bn_b": "244.0357301834738", "gap_bn_pair": "1202.1045902267215", "gap_share_pair": "0.007593265740653174", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.012238012734082046", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K04", "limited_by": "buyers", "never_counts_twice": "True" }, { "a": "permits_grid_fast", "b": "robots_general", "gap_bn_a": "526.7547675317619", "gap_bn_b": "244.0357301834738", "gap_bn_pair": "770.7904977152357", "gap_share_pair": "0.004868808527233262", "gap_share_pair_p10": "0.0", "gap_share_pair_p90": "0.010928904588674562", "pair_minus_sum_bn": "0.0", "relation": "add up", "unlocks": "", "binds_next": "K04", "limited_by": "buyers", "never_counts_twice": "True" } ], "retro": [ { "id": "retro_auckland_upzoning", "name": "Auckland Unitary Plan upzoning (terraced houses and apartments allowed on most residential land)", "metric": "extra_units_share", "scale": "Auckland region (all new dwellings consented), 2016 to 2021 (five years)", "machine": "2.198507003880237", "machine_p10": "0.0", "machine_p50": "2.2759837706948955", "machine_p90": "8.947137618343453", "known": "5.07", "known_unit": "additional dwellings consented over five years, % of the region's dwelling stock", "known_label": "S", "ratio": "0.43363057275744316", "within_2x": "False", "inside_80": "True", "gain": "2.302354098956843", "units_without": "9851.0", "units_with": "12182.30122392861", "path_b": "not run (no breaking-point table for past economies)", "entry": "retro/retro_auckland_upzoning.yaml", "contamination": "Three searches surfaced forbidden material: the upzoned land share quoted from the after-the-fact study and later papers; Auckland consent counts after 2016; and, unasked, the study's own count of extra consents. The agent also recalled the study's headline from training.", "contamination_effect": "Key numbers were settled before the last leak (logged in pitch/logs/retro_auckland_upzoning.md). The demand limit was chosen after seeing post-2016 counts but does not bind at the entry's price. None of the leaked numbers is used." }, { "id": "retro_genai_support", "name": "Generative-AI reply and documentation assistant for customer-support chat agents (2020-2021)", "metric": "quantity_pct", "scale": "One large US-based software firm's customer-support chat operation, about 5,000 agents mostly in the Philippines and the United States; issues resolved per agent-hour; rollout late 2020 through 2021", "machine": "11.610526315789471", "machine_p10": "0.0", "machine_p50": "11.922196835412546", "machine_p90": "16.540513586366533", "known": "14.0", "known_unit": "% more issues resolved per hour", "known_label": "A", "ratio": "0.8293233082706765", "within_2x": "True", "inside_80": "True", "gain": "0.005848326902663306", "units_without": "9500000.0", "units_with": "10603000.0", "path_b": "not run (no breaking-point table for past economies)", "entry": "retro/retro_genai_support.yaml", "contamination": "Two search summaries showed results of the forbidden study (a productivity percentage and a chat-duration result). The model was trained on text that includes the study.", "contamination_effect": "Neither used. Method and central values were worked out before the first search but written into the log just after the first leak, as the log says (pitch/logs/retro_genai_support.md)." }, { "id": "retro_kenya_connections", "name": "Cheaper grid connections for rural Kenyan households near a transformer (2014-2015)", "metric": "units_share", "scale": "Rural Busia and Siaya counties, western Kenya: households not yet connected that live within about 600 m of a distribution transformer; household grid connections; 2014-2015", "machine": "34.76109460052972", "machine_p10": "4.2884536271891385", "machine_p50": "26.208041019319197", "machine_p90": "100.0", "known": "23.7", "known_unit": "% of unconnected households taking a grid connection at $171 (from $398)", "known_label": "S", "ratio": "1.466712852343026", "within_2x": "True", "inside_80": "True", "gain": "2.5000774614160952e-05", "units_without": "30.0", "units_with": "347.61094600529714", "path_b": "not run (no breaking-point table for past economies)", "entry": "retro/retro_kenya_connections.yaml", "contamination": "Three searches showed the forbidden study's findings in words (demand falls sharply with price; few connections at the partial subsidies).", "contamination_effect": "None used; method, central values and most ranges were fixed before the clearest leak (pitch/logs/retro_kenya_connections.md). Ethiopian voucher evidence was dropped because its numbered versions are from 2014-2015." }, { "id": "retro_robots", "name": "Industrial robots spreading in 17 rich countries, 1993-2007 (retro-pitch, blind)", "metric": "growth_pts", "scale": "17 rich countries (Australia, Austria, Belgium, Denmark, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Netherlands, South Korea, Spain, Sweden, United Kingdom, United States); the industries that use robots and the rest of the economy; 1993 to 2007. Money: 1993 US dollars at 1993 exchange rates and 1993 prices.", "machine": "0.0008934831223647987", "machine_p10": "0.0001673113139524369", "machine_p50": "0.0008711191056918481", "machine_p90": "0.0044101096603311645", "known": "0.36", "known_unit": "percentage points a year of labour productivity growth", "known_label": "S", "ratio": "0.002481897562124441", "within_2x": "False", "inside_80": "False", "gain": "2.663357420173434", "units_without": "340000.0", "units_with": "702736.0477717457", "path_b": "not run (no breaking-point table for past economies)", "entry": "retro/retro_robots.yaml", "contamination": "The forbidden study's PDF link appeared in a search result; post-1993 robot price indices (IFR 1990-2005, Karlsson 2001, UN/ECE 2003) and later robot stock counts appeared. No search showed the study's answer. The agent knows the study's result from training.", "contamination_effect": "None of these used (pitch/logs/retro_robots.md). The entry avoids robots_general.yaml, which cites the forbidden study." }, { "id": "retro_uber", "name": "App-based ride hailing (UberX) in the United States, 2015", "metric": "gain_bn", "scale": "United States, all riders of UberX (Uber's low-cost app-hailed rides in private cars, including uberPOOL), calendar year 2015; gain to riders in bn US$ of 2015", "machine": "0.7730388856108541", "machine_p10": "0.0", "machine_p50": "0.9058619953067029", "machine_p90": "4.962296101246064", "known": "6.76", "known_unit": "bn US$ of consumer surplus in 2015", "known_label": "S", "ratio": "0.11435486473533345", "within_2x": "False", "inside_80": "False", "gain": "0.7730388856108541", "units_without": "91728000.0", "units_with": "234872783.1574806", "path_b": "not run (no breaking-point table for past economies)", "entry": "retro/retro_uber.yaml", "contamination": "None from the forbidden study. Some post-2014 items appeared in search results (a 2015 Reuters leak, a 2015 Manhattan Institute brief, 2015-2016 taxi data). The 18% tip figure was seen on a 2015 page quoting the 2014 TLC Fact Book.", "contamination_effect": "None of the post-2014 items used; the Fact Book itself is cited for the tip (pitch/logs/retro_uber.md)." } ], "scorecard": [ { "score": "retro-pitches within 2x of the known effect", "value": "0.4", "value_text": "2 of 5", "better": "higher" }, { "score": "known effect inside the machine's 80% range", "value": "0.6", "value_text": "3 of 5 (aim: about 80%)", "better": "closer to 0.8" }, { "score": "median machine / known (retro)", "value": "0.4336305727574431", "value_text": "0.43", "better": "closer to 1" }, { "score": "two independent research runs within 2x of each other (at the reference price and at a tenth of the next-best)", "value": "0.5", "value_text": "5 of 10 starters", "better": "higher" }, { "score": "after research.md was tightened: repeat runs within 2x of each other (starters that had moved more than 2x)", "value": "0.2", "value_text": "1 of 5 starters", "better": "higher" }, { "score": "quick-path error band (quick / full, median and 80% range)", "value": "1.4381461387842107", "value_text": "median 1.44, 80% of starters 0.30 to 19.99", "better": "narrower, median closer to 1" }, { "score": "share of starting-number tests passing (A2)", "value": "0.9423076923076923", "value_text": "94% of 52 tests", "better": "higher" }, { "score": "no-capability match with stage1-v5 (A4)", "value": "1.0", "value_text": "largest breaking-point difference 3.0e-16 a year", "better": "1 (exact)" } ], "source_manifest": "data/manifest.json" }