Much faster building permits and grid connections

A permitting and grid-connection process that grants building permits in about 1 month and grid connections (and other major infrastructure approvals) in about 12 months, adopted by governments from 2027, so the cost of waiting falls from about 6.8 to about 1.6 cents per dollar of construction (2026 int$ of waiting cost per $ of construction, C13).

Result

MeasureValue
Share of the gap filled, median across the draws0.18%
80% range0.0% to 1.1%
Dollars a year in 2035 (median)$0.3T
Growth points a year (median)0.01
Median economy, the entry as written0.33%: $0.5T tier 1, $0B tier 2
What people buy (path a), above on course$0.5T
What inputs allow (path b), above on course$37.1T
What limits itbuyers
Runs short next, across the 1,000 runsCropland in 52.6%; Construction trades in 26.9%; Physical machine labour (robots) in 20.5%
Runs short next, middle case (the receipt)Physical machine labour (robots), then Cropland
Share of its market using it in 203514.3%
Price against the next-best option0.0158 against 0.0675 (2026 int$ of waiting cost per $ of construction (C13))
Value to people beyond measured GDP (not added)$73B
Possible extra from unsourced knock-ons (not added)$0B
Starting numbers both ways (A2): stage1-v5 / replaced0.33% / 0.33%
Trustlow: method within 2x on 2 of 5 past cases; known effect inside its 80% range in 3 of 5; weakest key number [A] (7 of 10 key numbers assumed); no key number rests on a saved source

Receipt

StepWhatUnits on courseUnits withOld priceNew priceGain
apermits_grid_fast d1: cost on new:permit_wait ($ of construction (C13) a year, at today's construction prices)69,696,885,958,74470,215,091,025,1110.06750.0158$0.5T
bpermits_grid_fast ch1: supply K01
resultpath (a) on course + gains$290.7T
resultpath (b) most output before K04 passes its record-pace supply$327.3T
resultresult = smallest of (a), (b), target; minus on course = gap filled (buyers limit)$0.5T

What would change this answer

NumberLabelGap at lowGap at highEvidence that would settle it
available_yearA2.1%0.0%[A] now. Settled by a study of when it is available.
spread.years_10_to_90A1.6%0.09%[A] now. Settled by a study of how fast comparable products spread from 10% to 90% of buyers.
next_best.priceA0.11%0.77%[A] now. Settled by a study of today's price of the next-best option.

For the profit-machine: gross value added in 2035 $99B; price against the next-best option 23.3%; capital per dollar of output 0.5.

At other prices

PriceShare of the gap, median (80% range)LimitRuns short nextBeyond the demand evidence
0.06750.0% (0.0% to 0.32%)buyersPhysical machine labour (robots)no
0.0540.01% (0.0% to 0.49%)buyersPhysical machine labour (robots)no
0.04050.06% (0.0% to 0.67%)buyersPhysical machine labour (robots)no
0.0270.13% (0.0% to 0.87%)buyersPhysical machine labour (robots)no
0.01690.17% (0.0% to 1.1%)buyersPhysical machine labour (robots)no
0.01580.18% (0.0% to 1.1%)buyersPhysical machine labour (robots)no
0.01010.19% (0.0% to 1.2%)buyersPhysical machine labour (robots)no
0.006750.21% (0.0% to 1.3%)buyersPhysical machine labour (robots)no
0.003380.22% (0.0% to 1.4%)buyersPhysical machine labour (robots)no
0.001350.23% (0.0% to 1.4%)buyersPhysical machine labour (robots)no
0.0006750.23% (0.0% to 1.4%)buyersPhysical machine labour (robots)no
6.75e-050.23% (0.0% to 1.4%)buyersPhysical machine labour (robots)no

The research agent's comparison with published estimates

# permits_grid_fast: comparison with published estimates

**Machine (world, 2035, waiting cost 1.6 instead of 6.8 cents per $ of construction):** median across draws $291B a year, 0.10% of world GDP, 0.01 growth points (80% range $0-1.8T). As written: $527B (0.18%).

**What it is made of:** the waiting saving on the 14.3% of construction reformed by 2035, about half from building permits (5 to 1 month) and half from grid and major-infrastructure approvals (45 to 12 months). At full uptake (90%) it would be $3.2T (1.1%): infrastructure $1.55T (0.54%), power projects alone about $0.8T.

**Sources:** all figures are from search snippets only: unsaved, strength 3 at best.

| Estimate (strongest first) | Their figure | Machine's same measure | Machine ÷ it | |---|---|---|---| | CEA, Oct 2026 | US long-run GDP +0.28-0.56% if reviews fall from 4.2 to 2 years; +0.41-0.83% at 1 year | infrastructure part: 0.54% at full uptake; ~0.085% in 2035 | 0.65-1.3x; 0.1-0.2x in 2035 | | Hsieh-Moretti 2019 | US GDP +3.7% (2009) from looser land-use rules in three metros | 1.1% at full uptake; 0.18% in 2035 | 0.3x; 0.05x | | RFF, Power Delayed | US net cost of power-project delays $47bn (scenario total) | power part ~$0.8T a year (world, full uptake); a US tenth ~$80bn | >1.7x (theirs is a total) | | C2ES-cited study (new) | US transmission reform: $125bn of grid costs saved 2026-2040 (~$8bn a year) | as above | ≥10x | | Grid Strategies and Brattle (new) | fixing interconnection: ~$100bn of benefits; PJM delay costs up to $7bn in a year | as above | ~11x (PJM, yearly) | | McKinsey | $1.7-2.4T of cumulative US GDP forgone in federal permitting | a stock with no period: not convertible | - |

## Gaps over 2x

- **CEA in 2035:** spread. The CEA is long-run full adoption; the machine reaches 14% of construction by 2035 (12 years from 10% to 90% [A]). At full uptake its infrastructure part is inside the CEA's range for a similar wait cut (38 months against 33). - **Hsieh-Moretti:** a channel the machine lacks: how much may be built where workers are most productive (zoning), not how fast. The model has no geography. - **Grid studies (machine 2-10x or more higher):** a different measure, and likely a machine overstatement. - The studies count electricity-system costs, US or regional, often cumulative. - The machine charges the return on the whole project's value for each month of waiting, though before construction only land, design and finance are tied up (red team RT16), so its grid part is probably too high. - Its extra electricity is not valued (power does not bind).

## Which I trust more

**Major infrastructure:** both, since the CEA and the machine agree for a similar wait cut.

**Grid connections:** the electricity-system studies; no study backs the machine's waiting cost for pre-construction queues.

**Building permits (half the machine's gain):** no published GDP estimate exists; the machine rests on the practitioner rule of about 1% of cost a month (strength 3).

**The 2035 number:** low trust (7 of 10 key numbers assumed); most of its uncertainty is how fast governments adopt the reform, which no estimate addresses.

Sources

SourceStrengthSaved copy
LBNL, Queued Up: 2026 Edition (Rand et al., June 2026); saved copy from stage1-v2/v1/agent1yes
LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu1yes
LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu1yes
LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu1yes
LBNL, Queued Up: 2026 Edition; saved copy from stage1-v2/v1/agent4_bottlenecks/raw/lbnl_qu1yes
IEA, World Energy Outlook 2025; saved copy from stage1-v2/agent4_bottlenecks/raw/iea_weo201yes
IEA, World Energy Outlook 2025 (data-centre connection queues); saved copy from stage1-v2/1yes
IEA, World Energy Outlook 2025 (data centres at risk of delay); saved copy from stage1-v2/2yes
IEA, World Energy Outlook 2025 (power investment); saved copy from stage1-v2/agent4_bottle1yes
Albouy, Ehrlich and Liu (2016), Housing Demand, Cost-of-Living Inequality, and the Afforda2yes
Albouy, Ehrlich and Liu (2016), NBER WP 22816, cross-metro estimate; saved copy from stage2yes
IRENA, Renewable Power Generation Costs in 2024 (summary), Table S1; saved copy from stage1yes
IRENA, Renewable Power Generation Costs in 2024 (summary), Table S1; saved copy from stage1yes
IRENA, Renewable Power Generation Costs in 2024 (summary), capacity additions; saved copy 1yes
Soltas et al. (2026), permit records for 60 US cities 2000-2025 (Princeton / University of2search only
Soltas et al. (2026), as reported by Multi-Housing News; search snippet only2search only
World Bank, Doing Business 2020, United States economy profile (dealing with construction 1search only
World Bank, Doing Business 2012, Dealing with construction permits chapter; search snippet1search only
World Bank, Doing Business, Dealing with construction permits chapters (reform counts); se1search only
National League of Cities, Housing Supply Fact Sheet 5 (citing a Washington State study, a3search only
Sightline Institute, citing Seattle planners' analysis of permitting delay; search snippet3search only
CBO Working Paper 2026-10, A Model for Estimating the Economic Effects of Changes in Permi2search only
Council of Economic Advisers, The Economic Benefits of Permitting Reform (October 2026); s2search only
McKinsey, Unlocking US federal permitting: A sustainable growth imperative; search snippet3search only
Hsieh and Moretti (2019), Housing Constraints and Spatial Misallocation, American Economic2search only
Resources for the Future, Power Delayed: the hidden costs of postponing power projects (Re2search only
Mayer and Somerville (2000), Land use regulation and new construction, Regional Science an1search only
Resources for the Future, Report 26-11 (EPA 2023 social cost of carbon in 2026 dollars); s2search only

Sources · results/summary.csv · results/receipts.csv · results/sensitivity.csv · results/runs.csv · capabilities/permits_grid_fast.yaml